Council archive · source document
07/0806 - Preliminary Building Work assessable against the planning scheme [As Published] · 172007.806
. INTEGRATED PLANNING ACT 1907
Operational work that Is tidal work or
work In coastal managament district.
For mote. Information refer to Guide.18. For
mora information about prescribed tds! work in
locel government tidal areas refer to Guide 24,
__Ratess, you anewered “none.of the, above’
"6 epptcction rogues akoestment 6 U8:
Environmental Protection Agency (EPA),
Han egency other than EPA ts the esse
‘managerfor the apptation; PA i a-° ~- -
concurrence agendy for the application in -
relation Wo-this matier..”
Operational work batow high‘water
For mora informaton refer to For
nore Information ebout prescribed tdal work In
“Npcad govemment tat areas rote jo: Guide: 24
Unless you'enawared “none ofthe above" to-
10, the application riggers referral to
: IDAS Assessment Checklist, Version 20, 2 Apa 2007
9. The application involves operational work that is: ( tick the appicable box/as)
Ct) tidal work" as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is nat prescribed tidal work - complete Part M of Form 1; OF
Ci) tidal work that is prescribed tidal work" other than in a canal"? -completa Part P of Form 1:
of
Oi
carted out within a coastal management district under the Coastal Act and for - completo
Part M of Form 1 if any box/es (a) to () below are ticked.
(a) constructing or installing works in a watercourse between MHWS and HAT (ie.
thar than thase works in tidal water) Where the development has been determined not
Coaetal management
For nord Informetion rater to Guide 18, :
Unless you answered ‘none of the:sbove’ to
Q11, the appicatan-requires assessment by the
Environmental Protection Agency (EPA): °
{fon agency her
-manager for the coplication, EPAIsa.. + - :
concurtence agency, for the appiication in -
rotation tp this'mattar, .
. to be assessable against the Water Act 2000 ;
(1 (b) constructing a canal intended to be connected to tidal waters;
C0) constructing an artificial waterway;
(11 (@) redigiming land under tidal water,
(le) disposing of dredge spoil or other solid waste material in tidal water,
"(10 - interfering with quarry material on State coastal land above high-water mark;
1) draining or allowing drainage or flow of water or other matter across State
_ Coastal land above high-water mark,
(th) removing or interfering with coastal dunes on land, other than State coastal land,
that is In an erosion prone area and above high-water mark;
(1() constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
{5d (v)_ none of the above. on,
10. The application involves operational work that is: ( tick the appicabie box/ee)
(CO) tdtet works as defined under the Coastal Protection and Manegement Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 4; Or:
~ (i) tidal work that is prescribed tidal work" - complete Part P of Form 1; OF
(if) cared out within a coastal management district" under the Coastal Act and for-
C102) disposing of dredge spoil or other solid waste material in tidal water - complote Part
Mol Form 1, .
(21 (b) reclaiming land urider tidal water - complete Part M of Form 1; OF
C1 (c)_ constructing a canal, if the canal is associated with reconfiguring a lot - compote
. Part M of Form 1; .
BR qv) none of the above.
41. The application involves: tick the eppicoble box/es)
CA) a material change of use essessabie under a planning scheme involving operational
work cattied cut completely or partly in a coastal management district
CG) a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -
+ the construction of a new premises with a GFA'® of at least 1000m?
» the enlargement of the GFA of existing premises by more than 1000m?
Ci) reconfiguring a fot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
CW) reconfiguring 2 lot” assessable under schedule 8 of the IPA and.in connection with
the construction of a canal - complete Part M of Form 4 , :
TH (v)_ none of the above
——<$<——_ Sr
10 Td work és defined in sch 10 of the IPA.
17 Prosoribed tidal work Is defined in the Coastal Protection and
9 Reudtion 2003 and Inckudes cartain lial works completly or party wtthin a local goverment dal araa,
‘Managerneni
42 Cand maans oongl at defined under the Coastal Protection and Managonent Act $205
13 Tidal work is defined in sch 10 of the IPA.
414 Praacribed fal work I3 dofined in the Coastal Protection and
Regutation 2003 and Includes certain tidal works completaly or party within e local baal area.
‘Management
at) Raa senor denis dfned bach 100! Be PA Bd meer w cual management atic under te Coes! Profocton at Menegament Ac 1998, oer an an ares declare o> 8
coastal en
distict under section 47(2} of fet Act.
16 GFA bs datfned in ach 14 of the IPA to mean the gross Boor arg. For 2 definition of how to caicutated GFA, go to the planning scheme agamét which fhe application is being assessed.
avd Haan eerer tne Croats rotation ard Manepamert Act 1085, en apical or reconfguraéon, where ihe reconfiguration i assoised wth tha constivcdon ofan aril wateway, must bo
sorompanied by the application for the operetional works 9 construct the ertfical waterway.
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0806 - Preliminary Building Work assessable against the planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.