Council archive · source document
07/0806 - Preliminary Building Work assessable against the planning scheme [As Published] · 172007.806
INTEGRATED PLANNING ACT 1997 Developmant within the fimits of a port . , For mans infarination refer to Guide 18, For “information abot rescrood eh work refer tor Gute 24/ Ut you answored | SVES" to, Qi2, the arti . Port Author : (DAS Assessment Checklist, Version 20, 2 April 2007 12. Does the application involve development below high water mark'8 and within the limits of a port” under the Transport Infrastructure Act 19947 Bno J YES - compiete Part M of Form 1, ar Part P of Form 1 ifthe work is proscribed tidal work 13. Qoes the application involve operational work that is tidal work for a marina‘ with more than 6 vessel berths? Bano (C1 YES : complete Part Af of Forrn 1, ov Part P of Form 1 ifthe tidal work is proscribed (idol work 1114. Does the application involve tidal works within a strategic part land tidal area? NO YES - complete Part Md of Form 4 saan advica . 15. Does the application Involve development in a heage registered place as ‘defined under te Queensland Heritage Act 1992? [INO (YES - complate Part C of Form 1 16(b) The application involves: (tick applicable boxes) (C1 () — amaterial change of use assessable against the planning scheme and the lot shares a common boundary with a protected area or registered place under the Queensland : Heritage Act 1992; CO (i) reconfiguring a lot if the fot shares a common boundary with a protected area or registered place under the Queensland Heritage Act 1992; none of the above. ti Declarod catchment areas: For core iiformiation, cinchiding's Ast of the, . * daclared catchment areas within )Quelnaland,. = retar tO Guides}, Unless you onswered ‘non ofthe above’ to by "|16. The application is in an area declared to be a catchment area under the Wafer Act 2000 and involves: (tick the appiicable box/es) CQ) reconfiguring a tot if any lot resulting from the reconfiguration is leas than 16 hectares; OW development assessable against the planning scheme involving the establighment or expansion of a waste water disposal system, other than a disposal system for carrying out an environmentally relevant activity under the Environmental Protection Act 1994, none of the above Bei 18 figh war mark eg Po Coal Protection and Manager a 05 ard roan be ott Noh wate rar sting 6, 19 Masia is cefned in the Trenspart Operations (Marttime Potkition) Regutation 1995, 2 Stretegic port land fidal areas are the eres generally 50 matras seaward of high water mark adjacent to strategic par! land: Pages |
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0806 - Preliminary Building Work assessable against the planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.