.        INTEGRATED PLANNING ACT 1997                                                                                 IDAS Assessment Checklist, Version 19.0, 2 March 2007
         Development within the limits of a         12.   Does the application involve development below high water mark’® and within the limits of a port
        port                                              under the Transport Infrastructure Act 1994?
         For more information refer to Guide 18. For      XX  NO
         information about prescribed dat work refer to
       Guide 24.                                          (11 YES - comptete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
         If you answered "YES" to Q12, the application
         biggers referral to the Port Authority.
         The Port Authority is a concurrence agency if the
         development is —
         ¢ within 200m of a shipping channel or an entry
            and exit shipping corridor for the port
         e within 1000m of a swing basin, a commercial
            shipping wharf, a mooring, anchorage or spoil
            grounds;
         e within 1000m of a planned port facility
            identified in a land use plan approved under
            the Transport Infrastructure Act 1994.
         tn all other situation the Port Authority is an
         advice agency.
         Marinas                                     13.  Does the application involve operational work that is tidal work for a marina’? with more than 6
         For more information refer to Guide 18. For      vessel berths?
         information about whether a marina is prescribed      NO
         tidal work refer to Guide 24. The local            aS
         government is the assessment manager for al       (_] YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
         prescribed tidal work.
         lf you answered “YES” to Q13, the application
         triggers referral to Queensland Fire and Rescue
         Service as an advice agency.
         Tidal works in strategic port land tidal]   14.  Does the application involve tidal works within a strategic port land tidal area20?
         areas                                             i NO
         For more information refer to Guide 18.           CO  YES - complete Part M of Form 1
         Unless you answered "NO" to Q14, the relevant
         Port Authority is the assessment manager for the
         application and the Environmental Protection
         Agency (EPA) and Queensland Transport (QT)
         are concurrence agencies for the application.
         Heritage                                    15.   Does the application involve development in a heritage registered place as defined under the
         For further information refer to Guide 19.        Queensland Heritage Act 1992?
         if you answered "YES" to Q45, the application     xX NO
         triggers referral to the Queensland Heritage
         Council as concurrence agency for the            [J YES - complete Part C of Form 1
         application.
         Declared catchment areas                    16.   The application is in an area declared to be a catchment area under the Water Act 2000 and
         For more information, including a list of the     involves: (tick the applicable box/es)
         declared catchment areas within Queensland,           .                  :         .                .                            to
         refer to Guide 13.                               [1 (i)     reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares:
 @       Unless you answered "none of the above” to       LJ (ii)    development assessable against the planning scheme involving the establishment or
         O16, the application requires assessment by the             expansion of a waste water disposal system, other than a disposal system for carrying
         Department of Natural Resources and Water                               .                           -                     .                    .
         (NRW).                                                      out an environmentally relevant activity under the Environmental Protection Act 1994;
         If an agency other than NRW is the assessment     [X] (ili) none of the above
         manager for the application, NRW is a
         concurrence agency for the application in
         telatian to this matter.

         18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide,
         19 Marina is defined in the Transport Operations (Maritime Pollution} Regulation 1995.
         20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.
                                                                                             Page 5

Used in these records

About this file

File size
3.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

00147091.001.pdf · 3.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.