Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

00147091.001

of 64

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

‘       INTEGRATED PLANNING ACT 1997                                                                              IDAS Assessment Checklist, Version 19.0, 2 March 2007
        Operational work that is tidal work or    |9.   The application involves operational work that is: ( tick the applicable box/es)
        work in coastal management district            [1 (i) _ tidal work" as defined under the Coastal Protection and Management Act 1995 (the
        For more Information refer to Guide 18. For                     LA          :             .     idal                                 .
        more information about prescribed tidal work in          Coastal   Act) that is not prescribed tidal work - compiete Part M of Form 1; or
        local goverment dal areas refer to Guide 24.   C1 (ii)   tidal work that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1; of
        Ual     u answered "none of the above’ to Q9,       ese      .         we                                      gt
        the application requires assessment by the     C7) (iii) carried out within a coastal management district under the Coastal Act and for - complete
        Environmental Protection Agency (EPA).                   Part M of Form 1 if any box/es (a) to (i) below are ticked.
        fan agency pines man EPA cone assessment                 (J (a)   constructing or installing works in a watercourse between MHWS and HAT (ie.
        manager   for the application, isa                                                      a  ge                                                      .
        concurrence agency for the application In                         other than those works in tidal water) where the development has been determined not
        relation to this matter.                                          to be assessable against the Water Act 2000 ;
        Loca government is the assessment manager                [_] {b)  constructing a canal‘? intended to be connected to tidal waters;
        for all prescribed tidal work.                                               .          tals
                                                                 [J (c)   constructing an artificial waterway;
                                                                 (J (d)_   reclaiming land under tidal water;
                                                                 [1 (e)    disposing of dredge spoil or other solid waste material in tidal water;
                                                                 (J (f)    interfering with quarry material on State coastal land above high-water mark:
                                                                 L] (g)    draining or allowing drainage or flow of water or other matter across State
                                                                           coastal land above high-water mark;
                                                                 (J (h)    removing or interfering with coastal dunes on land, other than State coastal land,
                                                                           that is in an erosion prone area and above high-water mark;
                                                                 (1 (i)    constructing a bank or bund wall to establish a ponded pasture on land, other
 @                                                                         than State coastal land, above high-water mark; or
                                                            (iv) none of the above.
         Operational work below high water       | 10.  The application involves operational work that is: ( tick the applicable box/es)
        mark                                                      ge         13                                          .
         For more information refer to Guide 18. For     (J (i) tidal work'3   as defined under the Coastal Protection and Management Act 1995 (the
         more information about prescribed tidal work in         Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
         local government tidal areas refer to Guide 24. C7 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; oF
         Unless you answered “none of the above” to           eae    .         ups                               sg
         ato, the application triggers referral to       (J (iii) carried out within a coastal management district under the Coastal Act and for -
         {id} as a concurrence agency,                           LC  (a)   disposing of dredge spoil or other solid waste material in tidal water - complete Part
         Queensland Transport (QT) (Maritime Safety                         :     i                   A              ‘               Folin  ti         _
         Local government is the assessment manager                          °  om    ,              ;
         for all prescribed tidal work.                          [J] (b)   reclaiming land under tidal water - complete Part M of Form 1; or
                                                                 (J (c)    constructing a canal’, if the canal is associated with reconfiguring a lot - complete
                                                                           Part M of Form 1;
                                                         1 (iv)    none of the above.
         Coastal management                        11.   The application involves: (tick the applicable box/es)
         For more information refer to Guide 18.         CI (i)    a material change of use assessable under a planning scheme involving operational
         Unless you answered “none of the above” to                work carried out completely or partly in a coastal management district"
@        Q11, the application requires assessment by the      .             .                                                 .             .       .
         Envitonmental Protection Agency (EPA).               ii)  amaterial change of use assessable under a             planning scheme involving     buildin
                                                                                     9                                  p       g                     g          g
         If an agency other than EPA is the assessment             work, carried out completely or partly in a coastal management district that is -
           a     for the application, EPA is a                                     .                  :      .
         concurrence agency for the application in                 + the construction of a new premises with a GFA'® of at least 100m?
         relation to this matter.                                  e the enlargement of the GFA of existing premises by more than 1000m2
                                                         C1 (iii)  reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
                                                                   completely or partly in a coastal management district
                                                         C] (iv)   reconfiguring a lot’ assessable under schedule 8 of the IPA and in connection with
                                                                   the construction of a canal‘? - complete Part M of Form 1
                                                         XJ (v)    none of the above

         10 Tidal work is defined in sch 10 of the IPA.
         11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidat works completely or partly within a local government tidal area.
         12 Canal means canal as defined under the Coasfa! Protection and Management Act 1995
         13 Tidal work is defined in sch 10 of the IPA.
         14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
         15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastaf Protection and Management Act 1995, other than an area declared as a
            coastal management district under section 47(2) of that Act.
         16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how fo calculated GFA, go to the planning schame against which the application is being assessed.
         17 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
            accompanied by the application for the operational works to construct the artificial waterway.
                                                                                          Page 4

Used in these records

About this file

File size
3.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

00147091.001.pdf · 3.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.