Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

G Engineering Report And Plans · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.

of 56

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (10.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                               CALIBRE CONSULTING




 14.114 Carpark Design and Layout


 Specific Outcomes                                        Probable Solutions                                              Proposed Measures
                                                          (if code assessable)
 O8                                                       S8.1
 The layout of the development provides adequate,         Parking bays, manoeuvring areas, queuing areas, loading         Parking is distributed clearly throughout the site in
 clearing defined and easily accessible:                  setdown and pickup areas and driveways are designed to          accordance with the relevant codes.
                                                          the standards set out in Sections 2 and 3 of Australian
 (a)     on-site vehicle parking and manoeuvring areas;
                                                          Standard AS2890.1 Parking Facilities (Part 1: Off-street
         and
                                                          Carparking) and AS2890.2 – Off Street Parking (Part 2:
 (b)     loading and manoeuvring areas for delivery and   Commercial Vehicles);
         service vehicles.
                                                          AND

                                                          S8.2
                                                          The number of loading bays is not less than the minimum         Parking and turning areas will be provided within the service
                                                          number specified in Table 14-47.                                yard for service vehicles required by the development.

 O9                                                       S9.1
 Parking areas are located where they will not unduly     Carparking areas are accessed from rear laneways where          Pedestrian access through the site is separated from
 conflict with pedestrians and will not dominate the      practicable.                                                    intersections and other points of conflict to ensure safe
 streetscape.                                                                                                             passage.

 O10                                                      S10.1
 Provision is made for a reasonable number of onsite      Carparking spaces are provided for people with disabilities     Parking for people with disabilities has been catered for in
 carparking spaces identified and reserved for people     at the rate specified in Section 2.4.5 of AS2890.1 – Parking    accordance with the relevant code.
 with disabilities.                                       Facilities (Part 1: Off Street Carparking).
                                                                                                                          Adequate car parking has been provided and designation of
                                                                                                                          disability parking will be provided during detailed design.

 O11                                                      S11.1
 Access and egress points to not impact on the safety     Vehicle manoeuvring areas are provided in accordance with       A traffic assessment has been undertaken to ensure access
 and operations of the road system.                       Section 3 of AS2890.1 Parking Facilities (Part 1: Off Street    and egress points are safe.
                                                          Carparking) so vehicles enter and leave the site in a forward
                                                          gear.



B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                                                                            CIVIL ENGINEERING REPORT | 7

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

G ENGINEERING REPORT AND PLANS.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.