CALIBRE CONSULTING
14.114 Carpark Design and Layout
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
Calibre Consulting has provided a Traffic Impact
Assessment Report No. B14158ER01 (December 2014).
O12 S12.1
Parking areas are designed to - At locations where pedestrian and vehicle conflicts are likely Concept design has been undertaken to address these
to occur – matters to be incorporated during the detailed design stage.
a) provide a progressive reduction in speed between the
external road and internal parking spaces; a) sight distances of at least 2.5 seconds of travel time at
the designated speed are provided;
b) ensure lower speeds near areas of high pedestrian
activity through the use of appropriate road geometry or b) splayed corners on structures are incorporated;
devices designed to limit speed; and
c) landscaping is designed to allow clear views;
c) maintain sight distances which are appropriate for
the likely operating speeds in all areas of potential d) sign placement ensures that views are not impeded;
pedestrian/vehicle and vehicle/vehicle conflict;
O13 S13.1 A traffic assessment has been undertaken to ensure access
and egress points are safe.
A clearly defined pedestrian network is provided that – In large open car parks with greater than 200 car parking
spaces, a pedestrian path between parking spaces is Calibre Consulting has provided a Traffic Impact
a) is located in areas where people will choose to walk; Assessment Report No. B14158ER01 (December 2014),
provided on every second aisle;
b) ensures that pedestrian movement through car network discussion has provided in Section 4 of this report.
parking areas or structures are along aisles rather than
Refer to Drawing set provided in this Report (No.
across them; B14158.W-02A dated December 2014).
O14 S14.1 Calibre Consulting has provided a Traffic Impact
Assessment Report No. B14158ER01 (December 2014).
Provision is made for pedestrian and vehicular queues No probable solution identified;
at conflict points; Refer to Drawing set provided in this Report (No.
B14158.W-02A dated December 2014).
B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS CIVIL ENGINEERING REPORT | 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
G ENGINEERING REPORT AND PLANS.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.