G Engineering Report And Plans · 132007.2398
Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.
Plans and drawings: the text below has words only, no drawings.
Very large file (10.6 MB): may take a few minutes to open.
CALIBRE CONSULTING
14.114 Carpark Design and Layout
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
Development with the potential to generate significant
traffic and parking impacts gives appropriate
consideration to transport and land use issues23.
Table 7-2: Division 14: Earthworks
Table 14-52 Earthworks
14.120 Effects of Works
Acceptable Solutions (if self-assessable)
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
Drainage:
O1 S1.1
Finished surface levels ensure land is free draining. The finished surface gradient of any filled or excavated area Preliminary design indicates that finished surface levels will
is within the range 0.5% to 1.5% and drains to Council’s be in accordance with required grade range.
stormwater infrastructure where available or where
stormwater infrastructure is not available, toward the street.
Hydraulics:
O2 No solution provided. Flood impact has been considered and will not have any
negative impacts off-site. Refer to Brown Consulting’s report
Any change to the level of land does not have an adverse
dated October 2007. Updated analysis is required during
flooding impact on the flooding and drainage detailed design stage.
characteristics off-site.
B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS CIVIL ENGINEERING REPORT | 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
G ENGINEERING REPORT AND PLANS.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.