                                                                                                                                                                  CALIBRE CONSULTING




 14.120 Effects of Works
                                                           Acceptable Solutions (if self-assessable)
 Specific Outcomes                                         Probable Solutions                                                Proposed Measures
                                                           (if code assessable)
 Geotechnical Considerations
                                                           For Assessable Development:
 O3                                                        S3.1
 Earthworks do not result in geotechnical instability on   Filling works are undertaken in accordance with Section 28 –      All earthworks will be undertaken in accordance with the
 the premises or nearby premises.                          Filling of Site of Council’s PSP5 – Engineering Design            relevant standards to ensure geological stability to the subject
                                                           Standards – Roads and Drainage and Earthworks.                    site and adjoining sites.
                                                           AND
                                                           S3.2
                                                           Where the filling is for residential commercial or industrial
                                                           purposes the works comply with Sections 3 to 6 of AS3798 –
                                                           Guidelines for earthworks on commercial and residential
                                                           development.
 Local Amenity
 O4                                                        S4.1
 Earthworks do not cause disturbance to the amenity of     The following control measures are implemented:                   The earthworks will be conducted with due consideration to
 the neighbouring land.                                    (a) Regular water spraying of exposed areas to suppress           suppression of dust.
                                                                 dust;
                                                           (b) Provision of dust stabilised or sealed internal roads;
                                                           (c) Protective covering of exposed areas that are left for
                                                                 more than 2 weeks; and
                                                           If there is no valid development permit for the site, disturbed
                                                           areas are revegetated using species identified in PSP3 –
                                                           Landscaping Plants and Guidelines.
                                                           AND
                                                           S4.2
                                                           Earthworks are undertaken only during the hours of 7am to         All works will be conducted within the designated timeframes.
                                                           6pm, Monday to Friday and 7am to 6pm on Saturday. No
                                                           work is undertaken on Sunday or public holidays.




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                                                                               CIVIL ENGINEERING REPORT | 11

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

G ENGINEERING REPORT AND PLANS.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.