                                                                                                                                                                        CALIBRE CONSULTING




 14.120 Effects of Works
                                                            Acceptable Solutions (if self-assessable)
 Specific Outcomes                                          Probable Solutions                                                    Proposed Measures
                                                            (if code assessable)
 (b)   Council’s road infrastructure including pavements
       is not adversely affected.
 Extent of Earthworks
 O8                                                         S8.1
 Earthworks are contained within the site.                  All earthworks, including cut and fill batters, retaining walls etc   Cut and fill batters will be contained within the site
                                                            are contained within the subject site.                                boundaries.


 O9                                                         S9.1
 On sloping sites, excavation, or filling are designed to   Cut or fill is less than 2m in depth relative to the natural          Cut or fill will be less than 2m in depth relative to the natural
 maximise the use of natural slope and minimise the need    ground surface.                                                       ground surface.
 for cut and fill.
                                                                                                                                  It is noted that small isolated sections are greater than 2m
                                                                                                                                  below some walls in some locations.
 Environmental Protection
 O10                                                        No solution provided.                                                 Earthworks will be minimised to limit the impact on
                                                                                                                                  groundwater. No impact to watercourse will occur.
 Earthworks minimise any adverse impact upon
 groundwater, watercourse, drainage lines, wetlands, and
 native vegetation.
 Dams
 O11                                                        No solution provided.                                                 Typically, existing dams on site will be reconstructed and
                                                                                                                                  improved through re-shaping and landscaping works as part
 Dam location and construction does not impact upon
                                                                                                                                  of the stormwater treatment train solution refer to Calibre
 neighbouring properties in terms of:                                                                                             Consulting Report No. B14158.W-01A dated December
 (a) hydrology;                                                                                                                   2014)
 (b) alteration of existing overland flowpaths and
      patterns;
 (c) landslide or failure of dam wall; and
 (d) effluent disposal areas.




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                                                                                    CIVIL ENGINEERING REPORT | 13

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

G ENGINEERING REPORT AND PLANS.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.