G Engineering Report And Plans · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.

of 56

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (10.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                     CALIBRE CONSULTING




 14.120 Effects of Works
                                                              Acceptable Solutions (if self-assessable)
 Specific Outcomes                                            Probable Solutions                                               Proposed Measures
                                                              (if code assessable)


 Vegetative Waste
 O5                                                           S5.1
 Vegetation cleared from a development site is disposed       Cleared vegetation is transported off-site for disposal in an    Vegetation will be used or disposed of in an environmentally
 of in an environmentally responsible manner.                 approved green waste disposal facility;                          responsible manner.
                                                              OR
                                                              S5.2
                                                              Cleared vegetation is mulched onsite and reused for
                                                              landscaping of the finished development;
                                                              OR
                                                              S5.3
                                                              Cleared vegetation is disposed of for the purpose of firewood.
                                                              (Note: Disposal of vegetative waste by burning off is not an
                                                              acceptable method of disposal).
 Managing Contamination Risk
 O6                                                           S6.1
 Materials used as fill are suitable for development of the   The fill material is sold clean earth, free of putrescible or    It is proposed to aim for balanced earthworks within the site.
 land and filling or excavation works do not result in the    refuse material, vegetation, acid sulfate soils, building or     However, if fill material is required, it will be investigated by
 contamination of land.                                       construction material or other material of contaminants.         geotechnical engineer to ensure that it is satisfactory and not
                                                              OR                                                               contaminated prior to placement.
                                                              S6.2
                                                              The site is not on the contaminated land register.
 Haulage Activity & Amenity
 O7                                                           7.1
 Haulage of material to and from a site ensures:              No solution provided.                                            Refer to O6 above - Haulage will be undertaken with due
 (a) minimal disturbance to neighbouring properties                                                                            consideration to residents and Council’s infrastructure.
     and properties along the haulage route; and




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                                                                                 CIVIL ENGINEERING REPORT | 12

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

G ENGINEERING REPORT AND PLANS.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.