Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.
Plans and drawings: the text below has words only, no drawings.
Very large file (10.6 MB): may take a few minutes to open.
CALIBRE CONSULTING
14.143 Effects of Works
Acceptable Solutions (if self-assessable)
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
S1.6
For buildings:
(a) Temporary or permanent downpipes are connected to
the stormwater system before laying the roof; OR
(b) Localised erosion is avoided by directing flow from
downpipes over non-erosive areas.
Stormwater Runoff
O2 S2.1
Stormwater is diverted around disturbed areas. Diversion drains or bunds are designed and constructed to Part of the sediment and erosion control mentioned above will
drain upstream runoff around the disturbed site; require the diversion of stormwater around disturbed areas.
AND
S2.2
Discharge from the diversion drains do not cause runoff
impacts to other properties;
OR
S2.3
Alternative methods, as described in the Institution of
Engineer’s Australia (Queensland Division) Soil Erosion and
Sediment Control – Guidelines for Queensland Construction
Sites, are used.
Table 7-4: Division 16: Existing Services Code
Table 14-51 Existing Services
B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS CIVIL ENGINEERING REPORT | 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
G ENGINEERING REPORT AND PLANS.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.