G Engineering Report And Plans · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.

of 56

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (10.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                  CALIBRE CONSULTING




 Specific Outcomes                                        Probable Solutions                                                 Proposed Measures
                                                          (if code assessable)
 Setbacks and Easements
 O1                                                       S1.1
 Development near a sewer, water main, stormwater         The footing of any structure or building is located clear of the   Due consideration for all infrastructure and existing flow paths
 drain, overland flow path or associated structure does   zone of influence but no closer than 15.m (measured                will occur throughout the detailed design process.
 not:                                                     horizontally) from infrastructure including sewers, water
 (a) adversely affect the function of the service;        mains and stormwater structures;                                   Preliminary consideration of these items have been provided
 (b) place an additional load on the service; and         AND                                                                in the Drawings provided in this Report (No. B14158.W-02A
 (c) unduly increase future maintenance costs.                                                                               dated December 2014).


                                                          S1.2
                                                          No building of structure overhangs the zone of influence;
                                                          AND
                                                          S1.3
                                                          Finished surface levels maintain a minimum of 600mm of
                                                          cover, but not greater than 3m of cover to the underground
                                                          infrastructure;
                                                          AND
                                                          S1.4
                                                          If the existing surface level is altered, surface level services
                                                          including manholes and inspection points are altered to
                                                          match the new surface level;
                                                          AND
                                                          S1.5
                                                          Alterations are constructed in accordance with Sections 3, 4
                                                          and 5 of PSP6 – Engineering Design Standards –Water and
                                                          Sewerage and Section 4 of PSPs5 – Engineering Design
                                                          Standards – Roads, Drainage and Earthworks;
                                                          OR
                                                          S1.6



B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                                                                               CIVIL ENGINEERING REPORT | 16

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

G ENGINEERING REPORT AND PLANS.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.