G Engineering Report And Plans · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.

of 56

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (10.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                     CALIBRE CONSULTING




 14.145 Strategic Transport Network
 Specific Outcomes                                           Probable Solutions                                                 Proposed Measures
                                                             (if code assessable)
                                                             AND
                                                             S3.13 Pedestrian and cycle routes within or adjacent to the
                                                             development are overlooked by adjoining buildings, make
                                                             use of views and attractive sights, have lighting and are
                                                             signposted;
                                                             AND
                                                             S3.14 Suitable car restraint measures are adopted within the
                                                             development such as lower speed limits or traffic calming.
                                                             measures to support greater pedestrian and cycle movement;
                                                             AND
                                                             S3.15 Traffic management devices on potential bus routes
                                                             are provided in accordance with the Self-assessable code for
                                                             undertaking road works on local government roads, under the
                                                             Transport Planning and Coordination Regulation 2005;
                                                             AND
                                                             S3.16 Streets identified as potential bus routes are—
                                                             a) collector streets and sub-arterial/arterial roads which
                                                             provide highly accessible and relatively direct routes
                                                             wherever practical;
                                                             b) those that provide for the shortest and most direct route for
                                                             an efficient public transport service; and
                                                             c) those that can efficiently service adjoining development
                                                             areas.


 O4 Development access does not compromise the               No solution provided.                                              Calibre Consulting has provided a Traffic Impact Assessment
 functions of particular roads as indicated in Noosa Shire                                                                      Report No. B14158ER01 (December 2014), please refer for
 hierarchy, and does not adversely impact on the safety,                                                                        details.
 capacity and operations of the road system.
                                                             S5.1 Consideration is given to existing and future pathway         Calibre Consulting has provided a Traffic Impact Assessment
 O5 Pedestrian and cycle path infrastructure is provided     linkages and pathways link to the Local and Regional Cycle         Report No. B14158ER01 (December 2014), please refer for
 –                                                           Network and to the Priority Infrastructure Plan in Part 15.        details. Discussions are provided in Section 4.1 of this report.
 a) to form an integrated component of the movement          S5.2 Direct and accessible linkages are provided into the site.
 network and the open space system;                          S5.3 Pathway and landscape works are provided to a high
 b) to encourage walking and cycling;                        standard to Council specifications and assessed for
 c) to add variety and visual interest;



B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                                                                                  CIVIL ENGINEERING REPORT | 22

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

G ENGINEERING REPORT AND PLANS.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗