Council archive · source document
G Engineering Report And Plans · 132007.2398
Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.
Plans and drawings: the text below has words only, no drawings.
Very large file (10.6 MB): may take a few minutes to open.
CALIBRE CONSULTING
14.147 Road and drainage design and construction.
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
(d) advisory treatments such as Bicycle Awareness Zone;
(e) shared parking/bicycle lane;
(f) contra flow bicycle lane; and
(g) bus/bicycle lane.
S7.4 The provision of bicycle lanes at intersections is
generally in accordance with AUSTROADS Part 14, Section
5 and the Manual of Urban Traffic Devices (MUTCD) Part 9.
O8 S8.1
Stormwater drainage infrastructure is planned, designed Stormwater drainage planning, design and construction is in Stormwater drainage will be designed in accordance with
and constructed to: accordance with Section 4 of PSP 5 Engineering Design Council requirements and with consideration to the
(a) be accessible, cost effective and easily maintained. Standards – Roads, Drainage and Earthworks; Stormwater Quality Management Plan provided by Calibre
(b) Protect downstream capacity; AND Consulting Report No. B14158-01A.
(c) Protect downstream water quality;
(d) Maximise onsite stormwater retention and
retardation; and
(e) Convey runoff to stormwater drainage in a manner S8.2 As constructed data is submitted in accordance with
that allows roads to be trafficable in Q100 ARI local Section 6 of PSP 5 Engineering Design Standards – Roads,
rainfall events. Drainage and Earthworks;
AND
S8.3 Stormwater drainage planning, design and construction
is in accordance with the Queensland Urban Drainage Design
Manual.
B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS CIVIL ENGINEERING REPORT | 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
G ENGINEERING REPORT AND PLANS.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.