G Engineering Report And Plans · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.

of 56

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (10.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                         CALIBRE CONSULTING




 14.147 Road and drainage design and construction.
 Specific Outcomes                                      Probable Solutions                                              Proposed Measures
                                                        (if code assessable)
 O9                                                     S9.1
 Road and stormwater drainage infrastructure is         Road and stormwater drainage infrastructure is constructed      Roads and the stormwater networks will be designed in
 constructed:                                           in accordance with:                                             accordance with Council requirements. Refer to Drawing No.
 (a) in accordance with appropriate engineering         (a) Sections 2,3 and 4 of PSP5 Engineering Design               B14158-SK03 & SK04 for Erosion and Sediment Control
     standards; and                                           Standards – Roads, Drainage and Earthworks;               Layout Plans
 (b) to minimise adverse environmental impacts,         (b) Queensland Design Code for Residential Streets;
     including from runoff and erosion.                 (c) AUSTROADS; or
                                                        (d) A combination of the principles of these documents.
                                                        AND
                                                        S9.2 Erosion and sediment control measures are designed
                                                        and implemented in accordance with the Institution of
                                                        Engineers Australia (Qld Division) Soil Erosion and Sediment
                                                        Control – Guidelines for Queensland Construction Sites.




 Environmental Protection
 O10                                                    S10.1
 Roads and stormwater drainage infrastructure are       Roads and stormwater drainage follow the edge of existing       Consideration will be given to all environmental factors
 located and aligned so as to:                          disturbed areas; or alternatively, these works are co-located   throughout the detailed design phase.
 (a) minimise disturbance to native vegetation and/or   within a combined utility corridor;                             Refer to the Stormwater Quality Management Plan provided
      other habitat areas;                              AND                                                             by Calibre Consulting Report No. B14158.W-01A dated
 (b) protect and maintain wildlife corridor movements                                                                   December 2014).
      and the safety of native fauna;
 (c) minimise changes to the hydrological regime,       S10.2 Roads avoid native vegetation and provide for fauna
      including drainage patterns, runoff and water     underpasses and associated fencing where appropriate;
      quality;                                          AND
 (d) avoid crossing watercourses, drainage lines and
      wetlands, but where such crossings are




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                                                                       CIVIL ENGINEERING REPORT | 27

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

G ENGINEERING REPORT AND PLANS.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.