G Engineering Report And Plans · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.

of 56

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (10.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                             CALIBRE CONSULTING




 14.147 Road and drainage design and construction.
 Specific Outcomes                                           Probable Solutions                                             Proposed Measures
                                                             (if code assessable)
                                                             S10.5 Low impact construction techniques are used              See Above
                                                             around areas of vegetation to be retained to minimise
                                                             interference with the vegetation.



 O11                                                         S11
 Roads and stormwater drainage infrastructure is proven      No solution provided.                                          Constructed road and drainage infrastructure will satisfy
 to be suitable for its use prior to Council accepting the                                                                  Council’s requirements prior to hand over.
 dedicated asset.


 O12                                                         S12
 Alignment of stormwater drainage infrastructure is to       The location, design and construction of stormwater drainage   Infrastructure will be located for ease of maintenance,
 allow for easy access for the ongoing maintenance by        structures is in accordance with Sections 4 and 5 of PSP5,     easements will be established where required.
 Council.                                                    Engineering Design Standards – Roads, Drainage and
                                                             Earthworks;
                                                             AND
                                                             S10.2 Where infrastructure is located on private land an
                                                             easement is dedicated over the infrastructure in accordance
                                                             with Section 4 of PSP5 Engineering Design Standards –
                                                             Roads, Drainage and Earthworks.


 14.148 Frontage Works

 O11 Development is provided with external roadworks         S11.1 The following infrastructure components already          All necessary frontage works will be constructed and will
 along the full extent of the frontage of the site to an     existing at the frontage of the site or are provided at the    consider all necessary associated infrastructure.
 appropriate standard having regard to the specified         developer’s expense:
 function of the road.                                       (a) full width sealed road;
                                                             (b) concrete kerb and channel where appropriate;
                                                             (c) forming and grading to footpaths;
                                                             (d) vehicular kerb and footpath crossings;
                                                             (e) a constructed bikeway;



B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                                                                           CIVIL ENGINEERING REPORT | 29

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

G ENGINEERING REPORT AND PLANS.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.