Council archive · source document
G Engineering Report And Plans · 132007.2398
Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.
Plans and drawings: the text below has words only, no drawings.
Very large file (10.6 MB): may take a few minutes to open.
CALIBRE CONSULTING
14.147 Road and drainage design and construction.
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
unavoidable, disturbed areas are reinstated and S10.3 Road infrastructure within or adjacent to native habitat
revegetated on completion of works; and incorporates fences which allow for protected wildlife
(e) minimise bulk earthworks. movement and controls unrestricted access of domestic cats
and dogs;
AND
S10.4 Native vegetation is protected from clearing or
construction activities by:
(a) clearly marking vegetation to be retained with
flagging tape;
(b) installing protective fencing around the dripline
of vegetation; and
(c) ensuring stock piling, storage and vehicle
parking occur outside the areas of vegetation to
be retained;
AND
B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS CIVIL ENGINEERING REPORT | 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
G ENGINEERING REPORT AND PLANS.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.