Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

G Engineering Report And Plans · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.

of 56

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (10.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                  CALIBRE CONSULTING




 Specific Outcomes                                            Probable Solutions                                              Proposed Measures
                                                              (if code assessable)
                                                              S12.3 Development in the vicinity of rail corridors meets the
                                                              following external design level noise criteria:
                                                              (a) 65dB(a), assessed as the 24 hour average equivalent
                                                                    continuous A-weighted sound pressure level; and
                                                              (b) 87dB(A) assessed as a single event maximum sound
                                                                    pressure level.
 14.150 Staged Development

 O15
 Staged development is planned, designed and                  No solution provided.                                           Staged development is proposed and due consideration for
 constructed to ensure that:                                                                                                  required services will be allowed for.
 (a) each stage of the development can be constructed
     without interruption to services and utilities
     provided to the previous stages;
 (b) the infrastructure provided is capable of servicing
     the entire development; and
 (c) the materials used are consistent throughout the
     development.
 14.151 Alterations to Services and Utilities

 O16                                                          S16.1
 Any alteration or repairs to infrastructure as a result of   Any alteration or repair to infrastructure as a result of the   Any change to existing infrastructure will be rectified at the
 the development are made at no cost to Council.              development are completed at the developer’s expense.           expense of the developer.




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                                                                               CIVIL ENGINEERING REPORT | 31

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

G ENGINEERING REPORT AND PLANS.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.