Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

G Engineering Report And Plans · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.

of 56

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (10.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                   CALIBRE CONSULTING




Table 7-6: Division 19: Water Sensitive Design Code

Table 14-61


 Specific Outcomes                                           Probable Solutions                                                  Proposed Measures
                                                             (if code assessable)
 Water Reuse

 O1                                                          S1.1
 Development uses a combination of detention and             No solution provided.                                               The development uses a combination of detention and
 retention systems to capture runoff from areas on the                                                                           retention. Please refer to the Concept Stormwater Quality
 site;                                                                                                                           Report No. B14158.W -01A undertaken by Calibre
                                                                                                                                 Consulting dated December 2014.
 AND

 O2                                                          S2.1                                                                Refer to the Concept Stormwater Quality Management
                                                                                                                                 Report No. B14158.W -01A undertaken by Calibre
 Water storage devices must have sufficient capacity         No solution provided.                                               Consulting dated December 2014.
 having regard to local rainfall pattern and the catchment
 area of roof or other hard standing surface.
 AND

 O3                                                          S3.1
 Captured water utilised for all non-potable uses on site;   Captured water is plumbed to be available for all external          Refer to the Concept Stormwater Quality Management
                                                             uses including gardening, irrigation, ponds, filling swimming
 AND                                                                                                                             Report No. B14158.W -01A undertaken by Calibre
                                                             pools and outdoor cleaning, as well as all ground floor toilet
                                                             cisterns and washing machine cold taps; and                         Consulting dated December 2014.

                                                             S3.2
                                                                                                                                 No rainwater capture and reuse is proposed for toilet or
                                                             Where the captured water is used for toilet flushing and/or         laundry use.
                                                             laundry use, an automatic or manual interchange device that
                                                             allows alternate use of capture water or the reticulation water
                                                             supply is installed to ensure that there is a continual supply of
                                                             water for sanitary flushing and laundry use.

 O4                                                          S4.1




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                                                                                CIVIL ENGINEERING REPORT | 32

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

G ENGINEERING REPORT AND PLANS.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.