Table 7-6: Division 19: Water Sensitive Design Code
Table 14-61
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
Water Reuse
O1 S1.1
Development uses a combination of detention and No solution provided. The development uses a combination of detention and
retention systems to capture runoff from areas on the retention. Please refer to the Concept Stormwater Quality
site; Report No. B14158.W -01A undertaken by Calibre
Consulting dated December 2014.
AND
O2 S2.1 Refer to the Concept Stormwater Quality Management
Report No. B14158.W -01A undertaken by Calibre
Water storage devices must have sufficient capacity No solution provided. Consulting dated December 2014.
having regard to local rainfall pattern and the catchment
area of roof or other hard standing surface.
AND
O3 S3.1
Captured water utilised for all non-potable uses on site; Captured water is plumbed to be available for all external Refer to the Concept Stormwater Quality Management
uses including gardening, irrigation, ponds, filling swimming
AND Report No. B14158.W -01A undertaken by Calibre
pools and outdoor cleaning, as well as all ground floor toilet
cisterns and washing machine cold taps; and Consulting dated December 2014.
S3.2
No rainwater capture and reuse is proposed for toilet or
Where the captured water is used for toilet flushing and/or laundry use.
laundry use, an automatic or manual interchange device that
allows alternate use of capture water or the reticulation water
supply is installed to ensure that there is a continual supply of
water for sanitary flushing and laundry use.
O4 S4.1
B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS CIVIL ENGINEERING REPORT | 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
G ENGINEERING REPORT AND PLANS.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.