G Engineering Report And Plans · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.

of 56

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (10.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                    CALIBRE CONSULTING




 Specific Outcomes                                            Probable Solutions                                               Proposed Measures
                                                              (if code assessable)
 (b)   Is designed to be compatible with existing
       infrastructure; and
 (c)   Is deigned using materials that are suitable for the
       use, durable, easy to maintain and cost effective,
       taking into account the whole of life cycle cost and
       Council’s maintenance inventory.

 O2 Water supply infrastructure is constructed:               S2.1 Water supply infrastructure is constructed in               All water supply infrastructure will be constructed and tested
                                                              accordance with Section 6 of PSP 6 – Engineering Design          in accordance with Unity Water requirements.
 (a)   in accordance with appropriate engineering
                                                              Standards – Water and Sewerage;
       standards; and
                                                              AND
 (b)   to minimise adverse environmental impacts.

                                                              S2.2 Erosion and Sediment control measures are designed          Erosion and sediment control measures will be prepared as
                                                              and implemented in accordance with the Institution of            part of the operational works (civil) design drawings.
                                                              Engineers Australia (Qld Division) Soil Erosion and
                                                              Sediment Control – Guidelines for Queensland Construction
                                                              Sites.

 O3 Water supply infrastructure is proven to be suitable      No solution provided.                                            Water supply infrastructure will be constructed and tested to
 for its use prior to Council accepting the dedicated                                                                          Unity Water’s satisfaction prior to hand over.
 asset.

 O4 Water supply infrastructure is provided with all          No solution provided.                                            Water supply infrastructure will be supported by all required
 supporting technical documentation.                                                                                           technical documentation.

 O5 Where buildings or other structures are in proximity      S5.1 The footing of any building or structure is located clear   All existing infrastructure will be protected from the proposed
 to Council’s water supply infrastructure, provision is       of the zone of influence but no closer than 1.5m (measured       works.
 made to protect the infrastructure from physical             horizontally) from infrastructure including sewers, water
 damage and to allow ongoing maintenance by Council.          mains and stormwater structures.
                                                              AND




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                                                                                CIVIL ENGINEERING REPORT | 35

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

G ENGINEERING REPORT AND PLANS.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.