Skip to the record
Every meeting, every word.

Council archive · source document

G Engineering Report And Plans · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.

of 56

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (10.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                        CALIBRE CONSULTING




 Specific Outcomes                                              Probable Solutions                                                 Proposed Measures
                                                                (if code assessable)
                                                                S5.2 A registered easement in favour of Council is created
                                                                over all underground infrastructure located in private
                                                                property;
                                                                AND

                                                                S5.3 The width of the easement is the greater of 3m or the
                                                                width of the zone of influence;
                                                                AND

                                                                S5.4 The easement is centred over the centreline of the
                                                                infrastructure.

 O6 Alignment of water supply infrastructure allows for         S6.1 Infrastructure is designed and constructed on the             Detailed design considerations will ensure ease of
 easy access for the ongoing maintenance by Council.            preferred alignments in accordance with Section 3 of PSP 6         maintenance is achieved.
                                                                Engineering Design Standards – Water and Sewerage.

 O7 Any alterations or repairs to infrastructure as a           S7.1 Any alterations or repairs to infrastructure as a result of   Existing infrastructure will be protected at all times. Any
 result of the development are made at no cost to the           the development are completed at the developer’s expense.          changes will be rectified at the developer’s expense.
 Council.
 14.183 Design and Construction Sewer

 O8 Sewerage Reticulation Infrastructure                        S1.1 Sewerage Reticulation infrastructure is designed in           Sewer infrastructure will be designed to cater for the
                                                                accordance with Sections 4 and 5 of PSP 6 – Engineering            intended load and will be compatible with existing
 (a)   Meets the needs of the users;
                                                                Design Standards – Water and Sewerage.                             infrastructure.
 (b)   Is designed to be compatible with existing
       infrastructure; and
 (c)   Is designed using materials that are suitable for
       the use, durable, easy to maintain and cost
       effective, taking into account the whole of life cycle
       cost and Council’s maintenance inventory.




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                                                                                     CIVIL ENGINEERING REPORT | 36

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

G ENGINEERING REPORT AND PLANS.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.