Council archive · source document
G Engineering Report And Plans · 132007.2398
Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.
Plans and drawings: the text below has words only, no drawings.
Very large file (10.6 MB): may take a few minutes to open.
CALIBRE CONSULTING
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
S12.3 The width of the easement is the greater of 3m or the
width of the zone of influence;
AND
S12.4 The easement is centred over the centreline of the
infrastructure.
O13 Alignment of sewerage reticulation infrastructure S13.1 Infrastructure is constructed on the preferred Detailed design considerations will ensure ease of
is to allow for easy access for the ongoing maintenance alignments in accordance with Section 4 of PSP 6 – maintenance is achieved.
by Council. Engineering Design Standards – Water and Sewerage.
O14 Any alterations or repairs to infrastructure as a S14.1 Any alterations or repair to infrastructure as a result Existing infrastructure will be protected at all times. Any
result of the development are made at no cost to of the development are completed at the developer’s changes will be rectified at the developer’s expense.
Council. expense.
B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS CIVIL ENGINEERING REPORT | 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
G ENGINEERING REPORT AND PLANS.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.