Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

G Engineering Report And Plans · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.

of 56

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (10.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                CALIBRE CONSULTING




 Specific Outcomes                                         Probable Solutions                                              Proposed Measures
                                                           (if code assessable)
 O9 Sewerage Reticulation infrastructure is constructed:   S9.1 Sewerage Reticulation infrastructure is constructed in     Sewer infrastructure will be designed in accordance with
                                                           accordance with Section 6 of PSP 6 – Engineering Design         Unity Water requirements and general engineering
 (a)   in accordance with appropriate engineering
                                                           Standards – Water and Sewerage and As Constructed data          principles.
       standards; and
                                                           submitted in accordance with Section 7 of PSP 6 –
 (b)   to minimise adverse environmental impacts.          Engineering Design Standards – Water and Sewerage;
                                                           AND

                                                           S9.2 Erosion and Sediment control measures are designed
                                                           and implemented in accordance with the Institution of
                                                           Engineers Australia (Qld Division) Soil Erosion and
                                                           Sediment Control – Guidelines for Queensland Construction
                                                           Sites.

 O10 Sewerage Reticulation infrastructure is proven to     No solution provided.                                           Sewer infrastructure will be tested and inspected to Unity
 be suitable for its use prior to Council accepting the                                                                    Water’s satisfaction prior to hand over.
 dedicated asset.

 O11 Sewerage Reticulation supply infrastructure is        No solution provided.                                           All supporting documentation will be provided during
 provided with all supporting technical documentation.                                                                     detailed design.

 O12 Where buildings or other structures are in            S12.1 The footing of any building or structure is located       All existing infrastructure will be protected from the proposed
 proximity to Council’s water supply infrastructure,       clear of the zone of influence but no closer than 1.5m          works.
 provision is made to protect the infrastructure from      (measured horizontally) from infrastructure including sewers,
 physical damage and to allow ongoing maintenance by       water mains and stormwater structures.
 Council.
                                                           AND

                                                           S12.2 A registered easement in favour of Council is created
                                                           over all underground infrastructure located in private
                                                           property;
                                                           AND




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                                                                            CIVIL ENGINEERING REPORT | 37

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

G ENGINEERING REPORT AND PLANS.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.