Original source · versioned page text
2020-12-08 Planning & Environment Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 DECEMBER 2020
Car Parking
36. A minimum of 42 car parking spaces and 4 motor cycle spaces must be provided and
signage and marked on the site generally in accordance with the approved plans and
AS/NZS 2890.01, and made available and accessible at all times while the use is open
for business. The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. 4 covered parking spaces for the residential units within the total, which are
clearly marked for this purpose
b. Pedestrian routes within the development site generally in accordance with the
conditions of this permit and further details and levels for the pedestrian access
to Diamond Lane.
c. 4 motorcycle spaces.
d. Provision of vandal resistant public lighting with intensities to satisfy the
requirements of Australian Standard AS1158: Public Lighting Code.
e. Linemarking, crossfalls and gradients in accordance with Australian Standard
AS/NZS 2890.01: Parking Facilities
37. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
38. Directional signage must be provided to direct customers and drivers to the car parking
spaces provided on site.
On Street Carparking
39. On street carparking along the frontage of the site must be provided with signage and
linemarking in compliance Australian Standard AS/NZS 2890.01. The works must be
endorsed by the Department of Transport and Main Roads and undertaken in
accordance with an Operational Works approval.
Service Vehicles
40. Service vehicle parking, manoeuvring and standing spaces must be provided on the
site. The works must be undertaken generally in accordance with the approved plans
and an Operational Works approval. and must include in particular:
a. Manoeuvring for Council contractors waste collection vehicle.
b. 1 SRV space.
Pedestrian and Bicycle Facilities
41. Public pedestrian pathway must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in
particular:
a. Concrete footpath for the entire length of the site’s frontage to Diamond Street.
The width of the footpath must be determined in consultation with a Council
Manager Development Assessment prior to the issue of the operational works
approval. The width of the footpath must provide for safe pedestrian traffic and
street tree planting and landscaping.
This condition is imposed pursuant to s128 of the Planning Act 2016 being necessary
trunk infrastructure identified by Council’s LGIP to service the development.
42. Pedestrian and bicycle facilities must be provided within the development. The works
must be undertaken in accordance with an Operational Works approval and must
include in particular:
Page 10 of 77
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.