Original source · versioned page text
2020-12-08 Planning & Environment Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 DECEMBER 2020
29. All building materials containing asbestos products are wrapped and disposed of in
accordance with the Public Health Regulation 2006 and the Environmental Protection
Regulation 2008.
Note: Asbestos is a Regulated Waste. The Department of Environment & Science
licenses businesses that transport asbestos waste, and landfills that accept this waste.
30. All building materials containing asbestos, including asbestos cement sheeting or
roofing and lagging are removed from the building prior to demolition/relocation.
Plumbing and Drainage
31. It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that at
demolition of a building, the existing sanitary drain upstream from the connection point
for a service provider’s sewerage system must be sealed water tight. This work is
deemed as notifiable Work and must be carried out by a suitably licenced plumber who
must submit an As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC
(Queensland Building Construction Commission) within 10 days of completing the
work.
ENGINEERING
External Works
32. Diamond Street must be upgraded for the length of its frontage to the subject site. The
works must be undertaken in accordance with an Operational Works approval and
must include in particular:
a. Construction of a pedestrian footpath in accordance with the conditions of this
Decision Notice.
b. Removal of any redundant property accesses and reinstatement of the kerb,
footpath and verge area to match the balance of the site frontage.
c. Any required stormwater drainage works within the road reserve in accordance
the conditions of this Decision Notice.
d. Any required road pavement correction due to the development works.
e. Relocation, and line marking of existing on-street parking spaces in accordance
with the requirements of the Referral Agency and the conditions of this Decision
Notice.
f. The required relocation of the existing power pole.
g. Any required alteration or adjustment to existing public services due to the
proposed works.
33. Additional external roadworks as may be required by Department of Transport and
Main Roads approval reference 1901-9327 SRA.
Site Access and Driveways
34. A sealed access driveway must be provided to all parking and manoeuvring areas of
the development generally in accordance with approved plans. The works must be
undertaken in compliance with an Operational Works approval and the applicable
requirements of the relevant utility provider/s, and must include in particular:
a. A driveway crossover generally in accordance with the approved plans, standard
drawing RS-051 and with an overall maximum width of 6.5m at the property
boundary.
35. Approval from the Department of Transport and Main Roads for the final design of the
site access and driveway works must be submitted in writing to Council prior to the
issue of any Development Permit for Operational Works by Council.
Page 9 of 77
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.