PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 DECEMBER 2020
Council. All equipment should be operating at the same time to test the overall noise
level created.
Waste Storage & Disposal
50. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9 - Waste Management, including an external imperviously
paved area correctly sized for all refuse and recycling containers and suitably screened
from public places and neighbouring properties. The waste storage areas must be
indicated on the plans and submitted with an operational works approval.
51. Separate waste storage facilities must be provided for the residential use onsite.
52. Waste collection services are limited to between 6.30am and 6.30pm Monday to
Saturday and not permitted on Sunday or public holidays.
53. Service vehicle movements associated with the approved use (including loading and
unloading) must not occur outside the hours of 7am to 6pm Monday to Saturday and
not at all on Sundays or public holidays. The requirements of this condition must be
included in the Community Management Statement for any body corporate for the
subject site.
HYDROLOGY
Stormwater Drainage
54. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval.
55. A primary stormwater quality treatment system must be provided for the development
for the effective removal of gross pollutants. The works must be undertaken in
accordance with an Operational Works approval.
56. All primary stormwater quality treatment devices must be routinely checked, serviced
and cleaned in accordance with the manufacturer’s recommendations. Records of all
maintenance activities undertaken must be kept and made available to Council upon
request.
57. A stormwater quality treatment system must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval and the
Bioretention Technical Design Guidelines (Water by Design, 2012), and must include
in particular stormwater quality treatment devices of a size and location generally in
accordance with the approved Stormwater quality management plan ver 0, prepared
by Callahan and Toth, with the exception of the following:
a. The Operational Works application must include an amended drainage design,
consistent with an updated MUSIC model that demonstrates that drainage from
Catchment A1, C and B1 are filtered through a vegetated system, in lieu of the
proposed GPT, to achieve the overall same reduction in pollutants prior to
release to stormwater; and
b. Demonstrate required amendments to the Stormwater Quality treatment train
continues to achieve overall development pollution reduction targets of 80%
reduction in Total Suspended Solids, 60% Reduction in Total Phosphorous and
45% reduction in Total Nitrogen compared to pre-development scenario, and
that the peak 1-year ARI event discharge remains within pre-development peak
1-year ARI discharge.
58. All stormwater quality treatment devices must be maintained in accordance with the
Water by Design (2009) - Maintaining Vegetated Stormwater Assets (Version 1). A
copy of this document must be retained on the site together with the approved
Operational Works drawings for the stormwater quality treatment system and a detailed
Page 12 of 77
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.