Original source · versioned page text
2020-12-08 Planning & Environment Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 DECEMBER 2020
Figure 2 – Upper level plan and site roof plan
Figure 3 – 3D perspective of the street elevation
Figure 4 – 3D perspective from the street north east corner.
2. SITE DETAILS
2.1. Background
The 3 lots (the site) have been historically used as an Energex depot. The subject site has new
owners and the infrastructure use has been abandoned, with one of the existing buildings currently
being used as a shop. The Community Services zone reflects the infrastructure use that previously
occupied the site.
2.2. Site Description
The site has approximately a 60m frontage to Diamond Street and Diamond Lane and combined
form a rectangular shape. The lot is generally level but is slightly higher than Diamond Lane to the
rear of the site. An open swale drain within Diamond Lane runs parallel with the site’s boundary.
The site has a significant quantity of hard stand with a large shed and 2 office type buildings.
No significant vegetation exists on site except for 2 x eucalypt tereticornis (blue gums) and a small
stand of mature palm trees located in the north-west corner of the site. Figure 5 below identifies
the 3 lots subject of this application.
Page 15 of 77
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.