PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 DECEMBER 2020
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected Estimated On-site Off-site *specify contractor and
waste volume(m³) *specify *specify landfill site or other
materials proposed contractor disposal site
re-use or and recycling
on-site outlet
recycling
methods
Excavation
material
Green waste
Bricks
Concrete
Timber-
please
specify
Plasterboard
Metals -
please
specify
Asbestos
Other -
please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management
table is to be completed by the demolition contractor.
Damage to infrastructure
23. Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
bridges or roadways must be repaired or reinstated to at least pre-existing conditions.
Vacant site
24. The site must be left clean and tidy free from debris such as concrete, wire, rubble,
brick/s and the like. If the site remains vacant for more than 30 days the lot/s must be
turfed or landscaped in accordance with Planning Scheme Policy PSP 3 – Landscaping
Plants and Guidelines and to the satisfaction of Council so as to not cause nuisance to
the surrounding area.
25. All waste materials must be removed from site.
Litter, erosion and sediment control
26. Litter, erosion and sediment control measures must be installed and maintained until
soils are stabilised by turf, vegetation or sealed.
Note: it is an offence under the Environmental Protection Act 1994 to deposit or
potentially allow litter, waste, soil, or other contaminants to enter a waterway or storm
water drainage system (e.g. roadside gutter).
Asbestos
27. Removal of building materials containing asbestos must be undertaken by a licensed
asbestos removalist.
28. Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
requires a licensed asbestos removalist to give notice to Workplace Health and Safety
Queensland (WHSQ) of licensed asbestos removal work at least five days before the
work commences. Notification must be made using Form 65: Notification of licensed
asbestos removal work, demolition work or emergency demolition.
Page 8 of 77
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.