ORDINARY MEETING MINUTES 21 OCTOBER 2021
2. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following table
unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
H Development Application/Development summary, prepared 03.09.2021
by OH Architecture
DA 001 H Proposed Plan, prepared by OH Architecture 3 September 2021
DA 101 H Proposed Basement Plan, prepared by OH Architecture 3 September 2021
DA 102 H Proposed Lower Floor Plan, prepared by OH Architecture 3 September 2021
DA 103 H Proposed Upper Floor Plan, prepared by OH Architecture 3 September 2021
DA 104 H Proposed Roof Plan, prepared by OH Architecture 3 September 2021
DA 151 H Proposed Elevations, prepared by OH Architecture 3 September 2021
DA 152 H Proposed Elevations, prepared by OH Architecture 3 September 2021
DA 153 H Proposed Elevations, prepared by OH Architecture 3 September 2021
DA 154 H Proposed Elevations, prepared by OH Architecture 3 September 2021
DA 161 H Proposed Sections, prepared by OH Architecture 3 September 2021
DA 162 H Proposed Sections, prepared by OH Architecture 3 September 2021
DA 163 H Proposed Sections, prepared by OH Architecture 3 September 2021
DA 301 H Pergola materials, prepared by OH Architecture September 2021
Currency Period
3. This development approval lapses if the use has not happened by 21 October 2027,
unless an application to extend the currency period is approved by Council.
Built Form and Development Appearance
4. The maximum height of the development must not exceed 8 metres above the natural
ground level and the finished surface level and 2 storeys.
5. Certification must be submitted to Council from a Licensed Surveyor which certifies that
the buildings do not exceed the maximum height requirement of this Decision Notice.
6. All fencing and retaining walls within the northern and southern setbacks must be located
and constructed in accordance with approved drawings DA 153 and DA 154, prepared
by OH Architecture and dated 3 September 2021.
7. All air conditioning units or other mechanical equipment must be fully enclosed or
screened such that they are not visible from the street frontages nor adjoining properties.
8. All deck and balcony areas must not be enclosed by permanent fixtures such as shutters,
louvres, glass panelling or the like, except where required to satisfy any privacy condition
of this Decision Notice.
Performance Bond
9. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
must be submitted to Council, to secure performance of all conditions of this approval,
prior to pre-start meeting. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in respect
of enforcing performance of this permit. Council reserves the right to call upon the bond
or guaranteed sum to effect compliance with conditions.
Protection of Privacy
10. To ensure privacy is protected between adjoining properties to the west, south and north,
the development must:
Page 31 of 41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.