Council archive · source document
Appendix C Proposal PLANS · MCU18/0013
Attached to the e-mail Detached House - MCU18/0013.
Plans and drawings: the text below has words only, no drawings.
Very large file (26.1 MB): may take a few minutes to open.
demolition s e t o u t s e t d o w n d o o r s w i n d o w s internal lighting external lighting ceiling legend electrical items electrical notes
1. demolition or removal of all 1. builder to organise and 1. levels and services locations 1. do not scale off drawings - 1. do not scale off drawings - id01 single downlight ed01 single downlight switch (1200 affl) double dgp01 1. electrical contractor to
structures to comply with provide a copy of the surveyor's may vary from those shown - use figured dimensions only. use figured dimensions only. surface mounted surface mounted provide phased supply to main
AS2601. pre-build height certificate verify levels and services Builder shall verify all Builder shall verify all switchboard and assess
stating that if the proposal is locations prior to dimensions on site prior to dimensions on site prior to circuit to switch single sgp01 maximum demand to AS3000.
id02 single downlight ew01 external wall light
2. remove all elements and built as per the approved plans commencement of installation and manufacture of installation and manufacture of recessed surface mounted
structures shown hatched or it will not exceed 8.5m above construction. door and window framing. window framing. ex01 exhaust fan ceiling dgp01 2. all data and phone points to
dashed. NGL - as defined by the local id03 single downlight es01 external step be wired with cat6 min.
government (other than the 2. remove existing landscaping 2. any discrepancies or errors 2. any discrepancies or errors sealed light recessed
3. nominated contractor must allowable chimney as required by new works shall be referred to the shall be referred to the intercom control USB dgp02 3. all light switches to be
carry out their own relevant encroachment or as outlined in unless noted otherwise. architect prior to installation. architect prior to installation. panel connected to dimmers. All new
iw01 internal wall light eg01 external garden
property services searches to approved siting relaxations - Unless noted otherwise Unless noted otherwise surface mounted uplight benchtop dgp03 switches to be mounted to
confirm location of any confirm with building certifier). 3. nominated contractor must dimensions shown for frames dimensions shown for frames cf01 internal ceiling fan match position of existing
essential services. carry out their own relevant are intended to represent are intended to represent no light switches.
iw02 internal wall light eu01 external in-
2. contractor to confirm exact property services searches to standard frame sizes. Window standard frame sizes. Window floorbox dgp04
surface mounted ground uplight
4. seek local government or siting and orientation prior to confirm location of any supplier to adjust dimensions to supplier to adjust dimensions cf02 external ceiling 4. all power / phone / data
dial-before-you-dig information construction setout. essential services. suit standard frame sizes. Door to suit standard frame sizes. iw03 internal wall light ep01 external pool fan no light external dgp05 points mounted at 300 above
before commencing any Joiners are to confirm frame Window Joiners are to confirm surface mounted light recessed FFL u.n.o.
demolition works on site. 3. all building setout and 4. seek local government or sizes suit wall depth and frame sizes suit wall depth and
confirmation of setbacks and dial-before-you-dig information ironmonery requirements. ironmonery requirements. sd01 smoke detector tv / cable point 5. all flourescent lamps shall be
iw04 internal art wall
5. all services (power, gas, height to be carried out by a before commencing any light warm white.
water etc) to be disconnected Licensed Surveyor. demolition works on site. 3. install door bottom and 3. install frame seals on and sag01 supply air grille gas point / tap
or capped. frame seals on and around all around all external openings to is01 internal step light 6. all wiring shall be concealed
4. no footing, or wall to 5. all services (power, gas, external openings to prevent prevent heat loss and recessed where possible. Approval of
6. plumbing drains, stormwater encroach the title boundary. water etc) to be disconnected heat loss and draughts. Seals draughts. Seals for around sag02 supply air grille cat 6 phone point Architect is required before any
and sewer main to be sealed or capped as required. for around Doors: RAVEN Windows: RAVEN RP69. ir01 concealed LED exposed wiring is installed.
and capped as required, 5. do not scale off drawings, RP69. Seals for bottom of strip light rag01 return air grille cat 6 data point
contractor to obtain plumbing use figured dimensions only- 6. plumbing drains, stormwater Doors: RAVEN RP4. 4. unless otherwise noted 7. TV points to be coordinated
approval from council as contractor shall verify all and sewer main to be sealed timber framed windows shall internal hallway with TV bracket.
ip01
required. dimensions on site prior to and capped as required, 4. unless noted otherwise all be as per schedules. All timber internal curtain / distribution board
pendant
construction. contractor to obtain plumbing door leaf's shall be the unless otherwise specified blind 8. all work to be in accordance
7. refer to approved BA for approval from council as approved equal of "Corinthian shall be a clear finish. internal void meter board with AS 3000 and the local
ip02
demolition if applicable. 6. any discrepancies or errors required. Doors". external curtain / authority.
pendant
shall be referred to architect 5. where window/door suites blind
and client prior to construction 7. termite protection is to be 5. unless otherwise noted abut a steel shs/timber post hot water unit
ip03 internal dining
of any works. provided to comply with timber framed doors shall be as the contractor is to make sp01 internal speaker
pendant
AS3660.1-2000 and per schedules. All timber allowance for encasing hot water booster
certification is to be provided unless otherwise specified shall structure to match suite. ip04 internal meals ms01 motion sensor
on completion. be a clear finish. pendant
6. unless otherwise noted floor thermostat
8. all slabs to be parged. 6. where window/door suites louvers shall be the approved ap01 access panel
ip05 internal kitchen
abut a steel shs/timber post the equal of "breezeway" 152mm pendant
contractor is to make allowance clip dual control series with
for encasing structure to match levers to match frame. if01 internal batten
suite. garage light
7. windows shall be fitted with
7. unless otherwise noted insect screens as nominated
louvers shall be the approved on drawings or schedules.
equal of "breezeway" 152mm Insect screen frames to match
clip dual control series with window and door frame colour
levers to match frame. and material.
9. glazing to be in accordance 8. glazing to be in accordance
with AS1288 & AS 2047 and with AS1288 & AS 2047 and
BCA part 3.6. Shower screens BCA part 3.6. Unless noted
to be installed in accordance otherwise all glazing to window
with AS 1288. Unless noted joinery shall be clear glass.
otherwise all glazing to door Install as per manufacturer's
joinery shall be clear glass. instructions.
Install as per manufacturer's
instructions. 9. all security screens
nominated on drawings or
10. all security screens schedules to be "CRIMSAFE"
nominated on drawings or or approved equal.
schedules to be "CRIMSAFE"
or approved equal. 10. provide window protection
in accordance with BCA 2013
Part 3.9.2.5.
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0233
s t u d i o 2 . 2 2 w y a n d r a s t r e e t . n e w s t e a d . q l d . 4 0 0 6
p 07 3257 7288 | m 0409541462 | w www.lockyerarchitects.com.au
JN A 21.11.17 CLIENT ISSUE
24 Arakoon Crescent Brad & Sam cover page SD 010.02 A SCALE nts
HOPPER
shaunlockyerarchitects pty ltd Sunshine Beach QLD 4567
Lot 764 on RP 48111
architectural legends
schematic design
1:1 @ A3
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix C Proposal PLANS.pdfRelated documentApplication case desk ↗
About this file
- File size
- 26.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.