Original source · versioned page text
MCU10/2083 Development Application part 2 - Attachment 1 - Town Planning Report & Code Assessment_FINAL_291010
KHA DEVELOPMENT MANAGERS TOWN PLANNING REPORT 100407 5.6 STORMWATER MANAGEMENT PLAN A Site Based Stormwater Management Plan has been prepared by JF&P Engineering and is included in Attachment 7. The Report recommends an appropriate management and treatment system for the development and demonstrates that there will be no net increase in peak Stormwater Flows as a result of the development. The arrangement proposed will also significantly reduce the amount of runoff pollutants post-development to Gibson Road and Skipper Place compared with the existing arrangement. 5.7 CIVIL INFRASTRUCTURE REPORT A Civil Infrastructure Report has been prepared by JF&P Engineering and is included in Attachment 8. The report confirms that the site is able to connect to all required infrastructure (including water, sewer, telecommunications, transport networks, waste, electricity etc.). DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE – CONVENIENCE CENTRE PAGE 12 37 GIBSON ROAD, NOOSAVILLE LOT 1 RP 802167
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.