GENERAL COMMITTEE MEETING MINUTES 16 JUNE 2025
Amendment No.8
Moved: Cr Amelia Lorentson
Seconded: Cr Karen Finzel
That Item F be added to read:
F. Prior to any detailed design or construction of the proposed new wetlands west
of the slipway at Chaplin Park, Council should undertake a risk assessment. This
includes commissioning an independent Environmental Impact Assessment (EIA)
and Hydrology Report. These reports must demonstrate that the wetland proposal
does not increase health risks (e.g., mosquitoes, cane toads) or flooding risks to
nearby residents or the broader community and does not increase risks to the
health of the river.
Lost.
For: None
Cr Brian Stockwell, Cr Karen Finzel, Cr Amelia Lorentson,
Against: Cr Jessica Phillips, Cr Tom Wegener, Cr Frank Wilkie, Cr
Nicola Wilson
Committee Recommendation
Moved: Cr Frank Wilkie
Seconded: Cr Tom Wegener
That Council note the report by the Director Infrastructure Services to the
Services & Organisation Committee dated 10 June 2025 and
A. Approve the final Noosaville Foreshore Infrastructure Master Plan, provided at
Attachment 1; subject to
1. Reverting the design approach for the Massouds Slipway and Jetty in Ely Park
to that as shown on the consultation version endorsed by Council at its meeting
of the 6 November 2024.
B. Authorise the CEO to implement the final Master Plan in order to enhance and
protect Noosaville foreshore for both current and future generations including
using the document as a key support document to attract grant funding for
infrastructure renewal
C. Note that each stage of subsequent delivery of the master plan will be subject
to detailed design refinement, taking guidance from the endorsed master plan,
and will be subject to ongoing community consultation including key stakeholders
to ensure the most appropriate detailed design response as the community
evolves over the next 20 years.
D. Continue to provide quarterly progress or status reports as part of the
Operational Plan reporting regime on the implementation of the Noosaville
Foreshore Infrastructure Master Plan, to ensure transparency and keep the
community informed of key milestones, timelines, and any changes to project
delivery.
E. Amend the Noosaville Foreshore Infrastructure Masterplan to include a clear,
publicly accessible statement showing the total number of carparks currently
available and outline the intended approach to designating vehicle parks across
the precinct into the future.
Carried
Cr Brian Stockwell, Cr Karen Finzel, Cr Tom Wegener, Cr
For:
Frank Wilkie, Cr Nicola Wilson
Against: Cr Amelia Lorentson, Cr Jessica Phillips
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original