Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Meeting minutes

of 14

Page text shows just the words. Original shows the document exactly as it was published.

GENERAL COMMITTEE MEETING MINUTES                                               16 JUNE 2025


7.1.        NOOSAVILLE FORESHORE INFRASTRUCTURE MASTERPLAN
            (REFERRED FROM SERVICES AND ORGANISATION COMMITTEE
            MEETING DATED 10 JUNE 2025 - ITEM 7.2)

            The following material was presented to the meeting in relation to this item:
            Cr Phillips – refer to Attachments:
                 Attachment 1 to the General Committee Minutes 16 June 2025 - DTMR
                    Austroads Guide
                 Attachment 2 to the General Commitee Minutes 16 June 2025 - NFIMP
                    Massoud's Slipway Site Plan



            Motion
            Moved:             Cr Frank Wilkie
            Seconded:          Cr Tom Wegener
            That Council note the report by the Director Infrastructure Services to the Services
            & Organisation Committee dated 10 June 2025 and
            A. Approve the final Noosaville Foreshore Infrastructure Master Plan, provided at
               Attachment 1; and
            B. Authorise the CEO to implement the final Master Plan in order to enhance and
               protect Noosaville foreshore for both current and future generations including
               using the document as a key support document to attract grant funding for
               infrastructure renewal
            C. Note that each stage of subsequent delivery of the master plan will be subject
               to detailed design refinement, taking guidance from the endorsed master plan,
               and will be subject to ongoing community consultation including key
               stakeholders to ensure the most appropriate detailed design response as the
               community evolves over the next 20 years.




            Amendment No.1
            Moved:             Cr Jessica Phillips
            Seconded:          Cr Amelia Lorentson
            That Item A. be amended to read:
               A. Approve the final Noosaville Foreshore Infrastructure Master Plan,
                    provided at Attachment 1 subject to:
                    1. A maximum shared pathway width of 3 metres for all of the foreshore;

            Lost.
            For:               Cr Amelia Lorentson, Cr Jessica Phillips
                               Cr Brian Stockwell, Cr Karen Finzel, Cr Tom Wegener, Cr
            Against:
                               Frank Wilkie, Cr Nicola Wilson
Log in to download the original file

8918a5a38f.pdf · 2.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.