Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Attachment F - Carparking Evaluation -Noosa Carparking Study - McGagney report

of 140

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                                                                        Noosa Council
                                                                                   Noosa Car Parking Study 2017 - 2032
                                                                                                          Final Report


In order to provide an estimation of potential carparking yield for the sites, a potential parking layout was
created for location 2, should it be developed as a multi-story public carpark. Two options, a two-level and
three-level, for a parking station were considered for the site, which yielded the following additional parking:
   Two-level – provides an additional 104 car spaces (121 existing to 225 proposed); and
   Three-level – provides an additional 229 car spaces (121 existing to 350 proposed).


Layouts for these two options, based on using parking ramps (up to 1:20 or 5% slope) between levels, are
provided in Appendix D.

A two-level carpark would provide additional surplus capacity to cater for a portion of Hastings Street parking
demand, allowing for a potential shuttle bus transport between the carpark and Hastings Street in periods of
peak parking demand. The potential impact of a two-level carpark in Noosa Junction on parking utilisation in
Hastings Street is show in Figure 5-4.

Figure 5-4: Shuttle service connection with Noosa Junction (additional 2-level carpark)




Figure 5-4 indicates that an additional 106 spaces at Noosa Junction through the implementation of a two-level
parking station, with supporting transfer / shuttle services, would be sufficient to meet the projected parking
demand for Hastings Street.


5.4.4 Noosa Junction
Carparking within the Noosa Junction study area is currently 69% overall. There is, however, significant variation
in parking utilisation within the study area. Parking is highly utilised along Bottlebrush Avenue, and the
Bottlebrush Avenue carpark, but less utilised along Lanyana Way and in adjacent carparks and along Sunshine
Beach Road. The current parking supply is not expected to be fully utilised by 2031, although an additional 41
carparks would be required by 2031 to achieve a utilisation rate of 85%, based on projected parking demand.

The variation in parking utilisation within the study area can be improved upon through the introduction of real-
time information and directional signage to the underutilised carparks of Lanyana Way.




                                                       49
Log in to download the original file

Attachment F - Carparking Evaluation -Noosa Carparking Study - McGagney report.pdf · 10.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.