Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)
6. Training
All persons shall be required to undertake a site induction and have the necessary qualifications
and current training to perform their responsibilities prior to commencing work at the site. The
environmental component of the site induction will include, as a minimum, the following:
• An overview of this EMP;
• A summary of the roles and responsibilities and site management contact details;
• All person’s duty to notify;
• Environmental performance criteria;
• Conditions of applicable environmental licences, permits, approvals or self-assessable
codes;
• Environmentally sensitive areas (including no-go zones) with emphasis on the adjacent
Reserve and National Park, erosion and sediment control, site access and the importance
of working within the Project footprint;
• Key environmental control measures identified in the EMP, including specific environmental
controls required for works adjacent to the Reserve and National Park;
• Emergency responses procedures;
• Incident and complaints reporting; and
• Induction records are to be maintained with information detailing the attendees, content,
trainer and dates of the induction/training.