EMP v2 - ESSENCE OF PEREGIAN 215 DAVID LOW WAY, PEREGIAN BEACH

Attached to the e-mail Operation Works Application - OPW19/0266 - 215 David Low Way, Peregian Beach (EMAIL 3/3) - Fauna Management, Landscaping, Bushfire Management, Environmental Management, Waste & Preliminary Construction Management Plan.

of 25

Page text shows just the words. Original shows the document exactly as it was published.

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)



                                         Will movement restrictions and a Fire Ant Management        No                                                      NA
                                         Plan be required to the project?

 PROTECTED & VULNERABLE AREAS
 Watercourses     Water Act 2000         Does the site contain any watercourses?                     No                                                      N/A
                                         Are they protected by the Water Act 2000?                   No                                                      N/A
                  EPP Water

                                         Will they be impacted on by the development?                No                                                      N/A

 Wetlands         Planning Act           Does the site contain any referable wetland areas?          No                                                      NA

 Coastal Areas    Coastal Protection     Is the property within a coastal management district or     No                                                      NA
                  and Management Act     erosion prone area as defined under the Coastal
                  1995                   Protection and Management Act 1995 and/or Regional
                                         Coastal Management Plans if available?
                                         Will works be undertaken within a tidal area?               No                                                      NA
                                         Is the site within a Wetland Protection Area?               No.                                                     NA
                  (SDAP Module 11:
                  Wetland Protection
                  and Wild Rivers

 Surrounding      EPBC Act               Are there any adjacent areas which are protected or         Yes. Noosa National      Park   and   Noosa   Council   Works avoid these areas and works undertaken to mitigate
 Environments                            constitute environmentally sensitive areas (i.e.            Environmental Reserve.                                  potential for offsite impacts.
                  Environmental          watercourses, estuaries, wetlands, marine areas,
                  Protection Act         vegetation areas, national parks, dunes, desert systems
                                         etc.) which forms part of the property’s catchment or
                  Nature Conservation    association?
                  Act 1992
                                         Will they be impacted on by the development?

 HYDROLOGY & STORMWATER
 Stormwater       SPP: State interest—   Does the development trigger requirements under the         No                                                      NA
 Runoff &         water quality          State Planning Policy: State interest - water quality?
 Controls.        Environmental          Is it likely that the development will or may result in     Yes                                                     To minimise the risk of releasing sediment (and other
                  Protection (Water)     impacts to downstream stormwater systems and/or                                                                     contaminants) to waters during construction and to meet the
                  Policy 2009            discharges to surface drainage or natural watercourse                                                               General Environmental Duty under the EP Act, a Site Erosion
                                         systems? (i.e. sediment loss, pollution etc.)                                                                       and Sediment Control Plan (ESCP) must be
                                                                                                                                                             prepared/certified by a suitably qualified person prior to
                                                                                                                                                             commencing construction. The ESCP must be implemented
                                                                                                                                                             and monitored throughout the construction phase.
                                         Is it requested that specific treatment systems be          Yes
                                         integrated in the development of the facility? (Wetlands,
                                         retention basins, pollution control devices etc.)
Log in to download the original file

EMP v2 - ESSENCE OF PEREGIAN 215 DAVID LOW WAY, PEREGIAN BEACH.PDF · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.