Original source · versioned page text
EMP v2 - ESSENCE OF PEREGIAN 215 DAVID LOW WAY, PEREGIAN BEACH
Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)
CONTENTS
1. Introduction 1
2. Purpose of This Report 1
3. Statutory and Policy Requirements 1
4. Environmental Management 7
4.1 General 7
4.3 Vegetation Management and Fauna Protection 7
4.4 Water Quality and Erosion and Sediment Control 7
4.5 Weed Control and Pest Management 7
4.6 Waste Management 8
4.7 Fuels and Hazardous Materials 8
4.8 Air Quality and Dust Control 8
4.9 Aboriginal Cultural Heritage 8
5. Communication and Reporting 10
5.1 Site Induction 10
5.2 Complaints and Incident Management Procedure 10
5.3 Non-conformances and Incidents 10
5.4 Corrective and Preventive Action 10
6. Training 11
ATTACHMENT A – Development Plan
ATTACHMENT B – Environmental Checklist
© 2019 - J000488 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original