Original source · versioned page text
EMP v2 - ESSENCE OF PEREGIAN 215 DAVID LOW WAY, PEREGIAN BEACH
Essence of Peregian Beach Project v2 Environmental Management Plan (Construction and Operation) 1. Introduction North Coast Environmental Services have been commissioned by Thomco No 2087 Pty Ltd to prepare an Environmental Management Plan to manage impacts to the environmental values associated with Lot 1 on SP286680; located at 215 David Low Way in Peregian Beach (referenced hereafter as ‘the site’). The impacts are anticipated to arise as a result of the approved construction of 19 x 3+ bedroom units, one (1) manager’s unit and a motel building containing 32 units. The site is proposed to be reconfigured from one (1) Lot into three (3) Lots (MCU16/0153 REC16/0041). The site layout has been prepared by Reddoor Architecture (refer Attachment A). 2. Purpose of This Report This Environmental Management Plan (EMP) (Construction and Operation) has been prepared to assist Thomco No. 2087 Pty Ltd (Thomco) and/or their nominated Construction Contractor, and other parties associated with the Essence of Peregian Beach development works, in discharging their statutory responsibilities relating to environmental matters during the construction and operation phase of the Project. This EMP includes specific environmental management actions, which have been detailed in Table 1 of this document. The following potential environmental issues have been identified in this EMP as key areas for consideration during the construction and operation phase of the Project: • Legislative compliance • Fauna and fauna habitat; • Vegetation management; • Water quality (including groundwater); • Erosion and sediment control; and • Weed control and pest management. Other issues that have been considered in this EMP include: • Waste management; • Fuels and hazardous materials; • Air quality and dust control; • Aboriginal cultural heritage; • Noise and vibration; and • Visual amenity 3. Statutory and Policy Requirements Thomco and all members of the project team have a “General Environmental Duty” under Section 319 of the Environmental Protection Act 1994 (EP Act). The General Environmental Duty makes it an offence under the Act to carry out any activity that causes, or is likely to cause, environmental harm unless all reasonable and practical measures have been taken to prevent or minimise the potential harm. To minimise environmental harm, it is necessary to assess what environmental conditions exist on-site and to identify potential environmental impacts of the proposed development. In addition to the EP Act, all development must comply with the relevant provisions of Commonwealth and State Legislation including but not limited to: • Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) (Commonwealth); • Planning Act 2016 (Planning Act); • Nature Conservation Act 1992 (NC Act); © 2019 - J000488 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original