response to information request francis
10 May 2021 Patrick Murphy Noosa Council [email protected] RE: Response to Information Request (MCU21/0020 and OPW21/0035) – MCU for Duplex and OpWorks 27 Grant St, Noosa Heads (6SP179879) Council issued a further information request on 11 March 2021. The applicant provides the following additional information in response to the items: PLANNING 1 Provide additional detail on the access driveway. The detail must be prepared by a suitably qualified person and include but not be limited to: a. levels and grades of the access driveway and the maneuvering areas; b. a longitudinal section extending from the centerline of the formation in Grant Street to the carparking; c. a driveway designed generally in accordance with Council’s standard drawings RS-049, RS-050 and respective addendum; d. a 1.5m wide footpath; e. demonstrate that a B99 vehicle will not bottom out or scrape entering/exiting the driveway; f. the proposed stormwater drainage structures. SCG Consulting Engineers provide additional detail regarding the access driveway, footpath and stormwater drainage structures. ---------------------------------------------------------------------------------------------------------------------- 2 Confirm whether a building certifier will be assessing and approving the proposed earthworks component of the development, or whether council is required to. 3 If council is to assess the earthworks component of the proposed development: a. Provide details, prepared by a RPEQ (Registered Professional Engineer of Queensland), of the proposed earthworks, including, but not limited to: extents; volumes; existing and finished levels; cross-sections; batters and/or retaining structures; stabilisation methods proposed, etc. b. Provide additional detail on the proposed retaining structures. The detail must be prepared by a RPEQ and include but not be limited to: i. The type of construction (material, foundations etc.); ii. Section plans indicating the location of the retaining structures and foundations in relation to the property boundary, the building pad, finished floor levels, proposed decks, driveway, etc.; iii. The structures required to collect and convey existing overland flows that are impacted on by the construction of these structures; iv. Any fencing to be installed on top of or beside these structures; v. The location of any services, above or below ground, adjacent to the proposed retaining structures. SCG include an additional earthworks plan is included with details on the retaining wall construction to be confirmed at building approval stage in accordance with the slope stability reporting. ----------------------------------------------------------------------------------------------------------------------
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.