STANDARD CONDITIONS FOR MULTIPLE DWELLINGS
aL Compliance with all relevant by-laws and policies.

25 Minimum disturbance to natural flora. No vegetation to be removed
other than that which would impede building operations. Where practicable,
re-vegetation to be carried out following cessation of building activity.

3c Permanent covered car parking to be provided on the site for. en wei cles.
together with space sufficient for.... 0M... .visitors' vehicles. Areas on
which vehicles will be driven and/or parked to be provided with a flexible
or other pavement surfaced with bitumen seal coat, asphaltic or other
concrete properly constructed and maintained to good engineering standards
to the satisfaction of the Council's Engineer. Plans and specifications for
such areas including footpath crossings to be submitted prior to issue of
a building permit. Vehicular access to and from the site to be designed
so as to ensure that sufficient area is available for manoeuvring and turning

; to permit forward movement to and from the road.

4. A concrete invert and paved access to connect to the existing bitumen
road pavement to be constructed to the satisfaction of the Council's Engineer.

5. ta}—disposet-of -sewage—and-sullage wastes_on_site to the satisfaction of

 

 

es - io a 5 oe: eee :
Councrt.—pestgns—to _be—approved prior—to—theissue—of—a_building—permit,
é OR
tb) —tonstructton-of-e-sewage—and-sutiage—helding tank_to_the satisfaction

(c) Connection to Council's sewerage system.

 

 

i : ate ; fen
6. Connection to Council's water supply facility at the applicant's expense.
7. =
OR- fe
-+b}-Stormvater—te—be—dispesed—of-on_site—se—as—é SRSE—3 de—ox—damage
Bt oini i

8. No earthworks or filling are to be carried out on the site until the
— requrements of the Council's Engineer have been obtained in writing.
Such requirements to be obtained prior to the issue of a building permit. |

9. Comply with the reasonable requirements of the Regional Fire Safety Officer.

 

10. The approval given herein is for Town Plan Consent only and does not imply
either the issue of a building permit or Council consent to an application
under the Group Titles Act or Building Unit Titles Act.

11. This approval will lapse if not availed of within two (2) years in
accordance with clause 3 (2) of Part II of Council By-laws Chapter XLIV -
Town Planning.

12. A certificate of alignment to be submitted with the application for a building
permit and/or an identification survey to be carried out by an authorised
surveyor at the time of the foundation inspection.

a 13. To ensure compliance with any and all conditions of this approval, Council
will require that you enter into a Bank Bond to guarantee performance.
The value of such bond would be determined and would need to be lodged prior
to issue of a building permit and any costs incidental thereto will be the
applicant's responsibility.

14. The conditions of this consent are to be completed prior to occupancy of the
building and if this is not done, Council reserves the right to call on
bond moneys lodged to carry out the works involved.

Document Set ID: 23065554
Version: 1, Version Date: 18/06/2024
Log in to download the original file

App B - TPC 808.pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.