ORDINARY MEETING AGENDA 18 DECEMBER 2014
20. The supervising engineer and applicant are responsible to ensure that the
implemented, short and long term, erosion controls measures are effective and
regularly maintained to cater for all weather conditions.
After Completion of Works
21. Prior to the commencement of use and the engineering certification of the
works by the supervising engineer (RPEQ), a combined inspection of the
completed works by Council’s Inspector/s and the supervising engineer is
required. Please contact Council on 5329 6244 to arrange the inspection.
Waste
22. The developer must provide adequate waste storage and disposal facilities.
23. Refuse bins must not be placed on the existing road formation of Holts Road. A
suitably sized all-weather pad shall be constructed adjacent the driveway
entrances to provide for waste bin collection.
ADVISORY NOTES
Engineering Certification
1. Council has undertaken an audit check of the submitted plans in relation to the
proposed works. A detailed check of the calculations and drawings has not
been undertaken, as they have been certified by a RPEQ. The RPEQ bears full
responsibility for all aspects of the engineering design. Council reserves the
right to require further amendments and/or additions at a later date should
design errors become apparent.
General Environmental Advisory Note
2. The Environmental Protection Act 1994 states that a person must not carry out
any activity that causes, or is likely to cause, environmental harm unless the
person takes all reasonable and practicable measures to prevent or minimise
the harm. Environmental harm includes environmental nuisance. In this regard
persons and entities, involved in the civil, earthworks, construction and
landscaping phases of this development are to adhere to their ‘general
environmental duty’ to minimise the risk of causing environmental harm.
Aboriginal Cultural Heritage Act 2003
3. There may be a requirement to establish a Cultural Heritage Management Plan
and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that:
“A person who carries out an activity must take all reasonable and practicable
measures to ensure the activity does not harm Aboriginal cultural heritage.” It
is an offence to fail to comply with the duty of care. Substantial monetary
penalties may apply to individuals or corporations breaching this duty of care.
Injunctions may also be issued by the Land and Resources Tribunal, and the
Minister administering the Act can also issue stop orders for an activity that is
harming or is likely to harm Aboriginal cultural heritage or the cultural heritage
value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to
discuss any obligations under the ACH Act.
Page 53 of 67
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.