ORDINARY MEETING AGENDA 18 DECEMBER 2014
B. Find the following are sufficient grounds to justify the decision despite the conflict with
the planning scheme:
1. The development will help to address a significant need for low-cost
accommodation for self-contained RV travellers in the Noosa area.
2. The development will provide economic and community benefit through
increased visitation to the Noosa hinterland.
3. The development provides for the adaptive re-use of the existing nursery on the
site.
4. The site’s location near the Bruce Highway is appropriate to cater for self-
contained RV traveller’s needs.
5. The development will not have significant adverse impacts on residential
amenity or water supply quality.
4 DEVELOPMENT APPLICATION 132005.220.04 - REQUEST FOR A PERMISSIBLE
CHANGE TO AN EXISTING APPROVAL FOR 22 VILLAGE INDUSTRY LOTS AT 70
CARPENTERS ROAD, COOROY
That Council note the report by the Infrastructure Assessment Officer to the General
Committee Meeting dated 15 December 2014 regarding Application No. 132005.220.04 for
a Permissible Change to the existing approval situated at 70 Carpenters Road, Cooroy and
approve the request with the following changes:
In relation to the request to make a change to the existing approval, Council decided to:
A. Change Condition 114 to read:
Contributions Towards Council Infrastructure
114. Monetary contributions shall be paid to Council towards the cost of providing
and/or upgrading various infrastructure at the rates applicable at the time of
payment. An estimate only of the contribution amounts under the current
Council policies and requirements is outlined in the table below:
Stage 1 Stage 2 Stage 3
Contribution Required For: Amount Amount Amount
(Lots 6,7 & 8) (Lots 10 to 26) (Lots 9 & 27)
PSP17 – Water Supply Headworks
$ 25,135 $ 191,289 $ 22,264
Contributions
PSP16 – Sewerage Headworks
$ 11,253 $ 85,641 $ 9,968
Contributions
PSP12 – Public Open Space
$ 8,630 $ 65,665 $ 7,643
Contributions (Park)
PSP20 – Pathway Trunk Network
$ 13,179 $ 100,281 $ 11,672
Contributions
Roadworks Contributions (including
$ 28,000 $ 213,506 $ 24,798
public transport)
TOTAL Contribution Amount = $ 86,197 $ 656,382 $ 76,345
These amounts are subject to variations in the Consumer Price Index, All Groups
Brisbane from September 2014 until the date of payment.
All contributions must be paid prior to Council endorsement of the plan of
survey for the applicable stage.
Page 54 of 67