GENERAL COMMITTEE MEETING AGENDA 11 JANUARY 2016
Performance Bond
5. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
must be submitted to Council, to secure performance of all conditions of this approval,
prior to the issue of a Development Permit for Operational Works. The cash bond or
trading bank guarantee will be returned on performance of the conditions of approval
less any costs incurred by Council in respect of enforcing performance of this permit.
Council reserves the right to call upon the bond or guaranteed sum to effect compliance
with conditions.
6. All grow media, grow bags and plants within the greenhouse shall be raised above the
10% AEP flood level. Any structures supporting the crop (including the building frame)
shall be designed to withstand minimum velocities associated with a 1% AEP Flood.
Certification confirming the heights and strength of the structures must be submitted to
Council from a suitably qualified professional (RPEQ) prior to the issue of an
Operational Works approval. The elevated planting system must be installed prior to
planting the next crop.
7. The use must be undertaken in accordance with the Flood Management Plan R01 v02,
by Water Technology and dated 31/08/2015, subject to the following amendments;
a. A nominated flood warden be on site at all times during operation hours of the
facility;
b. A contingency for a flood refuge area must be defined in the strategy in the event
that persons become trapped on site. The flood refuge area should be suitable
for safe refuge during an extreme flood event.
c. Flood warnings issued by the Bureau of Meteorology and/or Council must be
added as a trigger, in addition to the site's flood gauge.
The amendments must be incorporated into an amended Flood Management Plan
which must be submitted to Council prior to the issue of an Operational Works approval.
Waste
8. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9, Waste Management, including a waste storage area large
enough to accommodate all potential sources of contamination, including hazardous
materials, chemicals, used grow media (including plastics) and waste bins located well
above the 1% AEP flood level.
ENGINEERING
Site Access and Driveways
Lake Macdonald Drive frontage
9. An access driveway to service the existing dwelling must be provided extending from
the formation of Lake Macdonald Drive to the property boundary. The works must be
undertaken in accordance with an Operational Works approval and must include in
particular a driveway crossover generally in accordance with IPWEAQ standard
drawing 056.
10. This access driveway is to be used only for the residential use on the site. This access
may be used for access for the agricultural use on the site (passenger and heavy
vehicles) in an emergency situation when the heavy vehicle access through the
property to the south is not accessible. When used during an emergency situation,
suitable Traffic Control measures must be employed. The type and extent of Traffic
Control measures must be included in the Operational Works application for the
construction of the access driveway.
Page 47 of 50
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.