GENERAL COMMITTEE MEETING AGENDA 11 JANUARY 2016
Access driveway through the adjoining property (271 Lake Macdonald Dr/Lot 2
SP108094)
11. An access driveway to service the agricultural use must be provided extending from
the formation of Lake Macdonald Drive to the greenhouse. The works must be
undertaken in accordance with an Operational Works approval and must include in
particular:
a. an access and internal driveway generally in accordance with the report prepared
by TTM Consulting Pty Ltd dated 2 July 2015 reference 15SCT0024.
b. a driveway constructed with a suitable “all weather” surface that can cater for the
effects of occasional inundation by flood waters.
c. a driveway that does not create any additional flooding of Lot 2 SP108094 or any
adjoining property.
12. Approval of the driveway design from the owner of Lot 2 SP108094 must be submitted
to Council with the Operational Works application.
Car Parking
13. A minimum of 30 car parking spaces must be provided on the site for the agricultural
use. The works must be undertaken in accordance with an Operational Works approval
and must include in particular:
a. a carparking area constructed with a suitable “all weather” surface that can cater
for the effects of occasional inundation by flood waters.
b. a carparking area that does not create any additional flooding on any adjoining
property.
Stormwater Drainage
14. Stormwater runoff from the development must be disposed of on-site without causing
scour, entraining and transporting sediments in the stormwater or damage to the
subject site or any adjoining property.
15. All roof runoff not reused for site operations must be treated within natural stormwater
quality treatment strategies prior to release from the site.
16. The use must be undertaken in accordance with the Stormwater Management Plan
Rev a, by O2 Environmental and dated 07/10/2015, subject to the following
amendments;
a. the infiltration basin must be located outside of the Riparian Buffer Area;
b. The proposed filter media basin must be designed to hold water for no longer
than the time period modelled in the MUSIC model Stormwater Management
Plan Rev a, by O2 Environmental and dated 07/10/2015. Where groundwater
recharge is expected, a Geotechnical Engineer must provide certification to
confirm that the permeability of soils underlying the proposed location for the
media filtration system exceed the proposed permeability of the filter media
treatment system.
c. Include an Operational Phase Water Quality Monitoring Plan, prepared in
accordance with the Environmental Protection (Water) Policy 2009 Monitoring
and Sampling Manual. The Operational Phase Water Quality Monitoring Plan
must be sufficient to demonstrate that a flood event does not cause the release
of fertiliser, prescribed water contaminants, or other nutrient laden waters from
the operation of the Greenhouse into surrounding waterways. Monitoring
methods must not put any lives at risk during a flood event.
The amendments must be incorporated into an amended Stormwater Management
Plan and submitted to Council prior to the issue of an Operational Works approval.
Page 48 of 50
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.