GENERAL COMMITTEE MEETING AGENDA                                              11 JANUARY 2016


         Access driveway through the adjoining property (271 Lake Macdonald Dr/Lot 2
         SP108094)
   11.   An access driveway to service the agricultural use must be provided extending from
         the formation of Lake Macdonald Drive to the greenhouse. The works must be
         undertaken in accordance with an Operational Works approval and must include in
         particular:
         a.     an access and internal driveway generally in accordance with the report prepared
                by TTM Consulting Pty Ltd dated 2 July 2015 reference 15SCT0024.
         b.     a driveway constructed with a suitable “all weather” surface that can cater for the
                effects of occasional inundation by flood waters.
         c.     a driveway that does not create any additional flooding of Lot 2 SP108094 or any
                adjoining property.
   12.   Approval of the driveway design from the owner of Lot 2 SP108094 must be submitted
         to Council with the Operational Works application.
         Car Parking
   13.   A minimum of 30 car parking spaces must be provided on the site for the agricultural
         use. The works must be undertaken in accordance with an Operational Works approval
         and must include in particular:
         a.     a carparking area constructed with a suitable “all weather” surface that can cater
                for the effects of occasional inundation by flood waters.
         b.     a carparking area that does not create any additional flooding on any adjoining
                property.
         Stormwater Drainage
   14.   Stormwater runoff from the development must be disposed of on-site without causing
         scour, entraining and transporting sediments in the stormwater or damage to the
         subject site or any adjoining property.
   15.   All roof runoff not reused for site operations must be treated within natural stormwater
         quality treatment strategies prior to release from the site.
   16.   The use must be undertaken in accordance with the Stormwater Management Plan
         Rev a, by O2 Environmental and dated 07/10/2015, subject to the following
         amendments;
         a.     the infiltration basin must be located outside of the Riparian Buffer Area;
         b.     The proposed filter media basin must be designed to hold water for no longer
                than the time period modelled in the MUSIC model Stormwater Management
                Plan Rev a, by O2 Environmental and dated 07/10/2015. Where groundwater
                recharge is expected, a Geotechnical Engineer must provide certification to
                confirm that the permeability of soils underlying the proposed location for the
                media filtration system exceed the proposed permeability of the filter media
                treatment system.
         c.     Include an Operational Phase Water Quality Monitoring Plan, prepared in
                accordance with the Environmental Protection (Water) Policy 2009 Monitoring
                and Sampling Manual. The Operational Phase Water Quality Monitoring Plan
                must be sufficient to demonstrate that a flood event does not cause the release
                of fertiliser, prescribed water contaminants, or other nutrient laden waters from
                the operation of the Greenhouse into surrounding waterways. Monitoring
                methods must not put any lives at risk during a flood event.
         The amendments must be incorporated into an amended Stormwater Management
         Plan and submitted to Council prior to the issue of an Operational Works approval.




                                                                                   Page 48 of 50
Log in to download the original file

2016-01-11 General Committee Agenda(PDF, 4MB).pdf · 4.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.