210224_Town Planning Application
Each Dwelling House will be connected to Unitywater’s reticulated water supply and sewerage infrastructure. In this regard it is noted that the existing sewer line traversing through the site will be secured within a 3m wide easement, as demonstrated by the Plan of Development included at Appendix C. Furthermore, stormwater will be diverted to a lawful point of discharge, being the kerb and channel at Ward Street relevant to proposed Lot 201 (current stormwater drainage infrastructure associated with this lot will not be altered or impacted) and the Hay Street road reserve relevant to proposed Lot 401 and Lot 402. www.bennettandbennett.com.au 210224_Town Planning Application | April 2021 13