Original source · versioned page text
2022-11-08 Planning & Environment Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 NOVEMBER 2022 5. REPORTS FOR CONSIDERATION OF THE COMMITTEE 1 MCU22/0048 & OPW22/0089 – DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE FOR COMMERCIAL LANDING AND OPERATIONAL WORKS FOR PRESCRIBED TIDAL WORKS, SITUATED AT 222 GYMPIE TERRACE NOOSAVILLE Author Development Planner, Lisa Pienaar Environment and Sustainable Development Index ECM/ Application/MCU22/0048 & OPW22/0089 Attachments 1. Proposal Plans (35 page attachment provided separately to this agenda) 2. Seabed Lease 3. SARA approval APPLICATION DETAILS Applicant Noosa River Enterprises Pty Ltd Proposal Material Change of Use - Landing - Commercial Properly Made Date 28 March 2022 Information Request Date 21 April 2022 Information Response Date 1 July 2022 Decision Due Date 17 November 2022 Number of Submissions 2 PROPERTY DETAILS Property Address ‘Jetty’ 222 Gympie Terrace Noosaville Qld 4566 RP Description Lot 160 CP 908649 Land Area 1658 m² Existing Use of Land Commercial jetty and Landing – O Boat Hire STATUTORY DETAILS SEQRP Designation Regional Landscape and Rural Production Area Zone Recreation and Open Space Precinct Not applicable Local Plan Area Noosaville Overlays Sea Level Rise HAT (permanent) inundation 2040-2100 Assessment Type Impact EXECUTIVE SUMMARY The proposal is for an upgrade of existing infrastructure at O Boat Hire lease area at 222 Gympie Terrace Noosaville. The applicant proposes the upgrade to enable more efficient mooring of existing vessels within the existing and approved lease area. The upgrade will include an extension of the length of the jetty head (from 28.8 to 43 metres) which is a series of pontoons. Additional pontoon fingers are also proposed. The proposed infrastructure will result in additional site cover within the lease area due to a net increase in pontoons, which although is contrary to Performance outcome PO22 of the Waterways Page 4 of 89
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.