Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2022-11-08 Planning & Environment Meeting Agenda

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 8 NOVEMBER 2022


Works Code, it is considered to comply with the Overall outcomes. The additional site cover is also
contrary to the AO16.1 (b) of the Recreation and Open Space zone code which requires a
maximum of 10% but is considered to comply with corresponding Performance outcome PO16 of
the code.
There is potential for the scale and intensity of the operations to increase due to more efficient
mooring capabilities which is contrary to PO22 (d) of the Noosaville Local Plan Code and PO2 (b)
of the Waterways Works Code. While the applicant indicates a maximum number of vessels to be
31, the applicant has indicated that business operations and demand may impact on vessels
numbers at some stage. A condition is recommended to ensure there is no net increase of vessels
on site/lease area which ensures that the scale and intensity of the use will not increase and thus
comply with Noosa Plan.
The proposal is recommended for approval with reasonable and relevant conditions included.
RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 8 November 2022 regarding Application No. MCU22/0048 &
OPW22/0089 Development Permit for Material Change of Use - Landing - Commercial &
Operational Works for Prescribed Tidal Works situated at 222 Gympie Terrace Noosaville and:
A.   Approve the application in accordance with the following conditions:
     PLANNING
     When Conditions must be Complied With
     1.      Unless otherwise stated, all conditions of this Decision Notice must be complied with
             prior to the use commencing, and then compliance maintained at all times while the
             use continues.
     2.      Development undertaken in accordance with this approval must generally comply with
             the approved plans of development. The approved plans are listed in the following table
             unless otherwise amended by these conditions.
          Plan No.   Rev.   Plan/Document Name                                           Date
          34680-01   0      Cover Page, prepared by The Jetty Specialist                 14/09/2021
          34680-02   0      Existing Structures Plan, prepared by The Jetty Specialist   14/09/2021
          34680-03   0      Existing Structures Plan, prepared by The Jetty Specialist   14/09/2021
          34680-04   0      New Site Plan, prepared by The Jetty Specialist              14/09/2021
          34680-05   0      Vessel Mooring Site Plan, prepared by The Jetty Specialist   14/09/2021
          34680-06   0      Pontoon Layout Details, prepared by The Jetty Specialist     14/09/2021
          34680-07   0      Elevations, prepared by The Jetty Specialist                 14/09/2021
          34680-08   0      Pile Setout, prepared by The Jetty Specialist                14/09/2021
          34680-     0      Pontoon P1B, Construction Details, prepared by The Jetty     2/11/2021
          P1B-1             Specialist
          34680-     0      Pontoon P1B, Foam Details, prepared by The Jetty             2/11/2021
          P1B-2             Specialist
          34680-     0      Pontoon P2A & P1A, Construction Details, prepared by The     2/11/2021
          P2A-1             Jetty Specialist
          34680-     0      Pontoon P2A – 2 Foam Details, prepared by The Jetty          2/11/2021
          P2A-2             Specialist
          34680-     0      Pontoon P2B Construction Details, prepared by The Jetty      2/11/2021
          P2B-1             Specialist
          34680-     0      Pontoon P2B – 2 Foam Details, prepared by The Jetty          2/11/2021
          P2B-2             Specialist
          34680-     0      Pontoon P3A-1 Construction Details, prepared by The Jetty    2/11/2021
          P3A-1             Specialist
          34680-     0      Pontoon P3A Foam Details, prepared by The Jetty              2/11/2021
          P3A-2             Specialist
          34680-     0      Pontoon P3B-1 Construction Details, prepared by The Jetty    2/11/2021
          P3B-1             Specialist

                                                                                         Page 5 of 89
Log in to download the original file

2022-11-08 Planning & Environment Meeting Agenda(PDF, 5MB).pdf · 5.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.