2022-11-08 Planning & Environment Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 NOVEMBER 2022
the waterway and are not connected to or behind the revetment wall or rock wall.
9. Structures must be designed and constructed such that they do not place additional
vertical or lateral loads onto the existing revetment wall that may compromise the long
term stability and/or durability of the wall. Upon completion of works, a certification by
RPEQ must be provided to Council in this regard.
10. All structures must have no detrimental effects on stormwater drains and/or
easements.
11. No boatlifting devices are to be attached or moored at the structures for the purpose of
elevating a vessel above the water without Council approval.
12. The jetty and deck areas must be constructed in a manner to render the underside
area vermin proof.
13. There must be no electrical reticulation system carrying electricity in excess of 24 volts
beyond the revetment wall unless all switches and power outlets are positioned above
the 1% AEP flood level.
14. Lighting associated with the use must be designed, installed, operated, and maintained
in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor
Lighting.
15. Wastewater and sullage must only be disposed of at approved pump out facilities.
16. The mooring facility must not be utilised for live-aboard purposes.
17. Any construction and post construction activity must not to impact on the condition of
the waterway and is to be conducted so as not to breach the Environmental Protection
Act EPA (1994) and the Environmental Protection (Water) Policy 2009.
18. Certification by a Registered Professional Engineer of Queensland that states that the
jetty extension and pontoons are constructed in accordance with best practice methods
and are structurally sound must be submitted to Council. This certification must be
submitted to Council within three (3) months of the completion of the works. A final
inspection and approval of the structure by Council’s Inspector is also required. Please
contact Council’s Planning Assessment Section to arrange the inspection.
19. After completion, the proposed works must be maintained in a sound state of repair in
accordance with the approved plans.
20. All necessary State government approvals relating to this development must be
obtained prior to any works commencing on the site.
Environment
21. To ensure the safety of persons accessing the approved works and to prevent
environmental harm, a safety audit of the on-site fuel storage tanks, bowsers and
associate pipework, valves, vents and systems shall be conducted by a suitably
qualified professional and submitted to Council for approval prior to the use of the new
works (pontoon/jetty extensions). The audit shall demonstrate that the fuel systems are
in a safe and serviceable condition or, where necessary, identify repair and rectification
requirements to meet the relevant Australian Standards and industry best practice
environmental management. Any repair works must be completed, with certification
submitted by the auditor to Council, prior to the use of the new works (pontoon/jetty
extensions).
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
REASONS TO JUSTIFY THE DECISION DESPITE THE CONFLICT WITH THE PLANNING
SCHEME:
Find the following matters relevant to the assessment and sufficient reason to approve the
application:
Page 7 of 89
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.