PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                8 NOVEMBER 2022


           the waterway and are not connected to or behind the revetment wall or rock wall.
     9.    Structures must be designed and constructed such that they do not place additional
           vertical or lateral loads onto the existing revetment wall that may compromise the long
           term stability and/or durability of the wall. Upon completion of works, a certification by
           RPEQ must be provided to Council in this regard.
     10.   All structures must have no detrimental effects on stormwater drains and/or
           easements.
     11.   No boatlifting devices are to be attached or moored at the structures for the purpose of
           elevating a vessel above the water without Council approval.
     12.   The jetty and deck areas must be constructed in a manner to render the underside
           area vermin proof.
     13.   There must be no electrical reticulation system carrying electricity in excess of 24 volts
           beyond the revetment wall unless all switches and power outlets are positioned above
           the 1% AEP flood level.
     14.   Lighting associated with the use must be designed, installed, operated, and maintained
           in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor
           Lighting.
     15.   Wastewater and sullage must only be disposed of at approved pump out facilities.
     16.   The mooring facility must not be utilised for live-aboard purposes.
     17.   Any construction and post construction activity must not to impact on the condition of
           the waterway and is to be conducted so as not to breach the Environmental Protection
           Act EPA (1994) and the Environmental Protection (Water) Policy 2009.
     18.   Certification by a Registered Professional Engineer of Queensland that states that the
           jetty extension and pontoons are constructed in accordance with best practice methods
           and are structurally sound must be submitted to Council. This certification must be
           submitted to Council within three (3) months of the completion of the works. A final
           inspection and approval of the structure by Council’s Inspector is also required. Please
           contact Council’s Planning Assessment Section to arrange the inspection.
     19.   After completion, the proposed works must be maintained in a sound state of repair in
           accordance with the approved plans.
     20.   All necessary State government approvals relating to this development must be
           obtained prior to any works commencing on the site.
Environment
     21.   To ensure the safety of persons accessing the approved works and to prevent
           environmental harm, a safety audit of the on-site fuel storage tanks, bowsers and
           associate pipework, valves, vents and systems shall be conducted by a suitably
           qualified professional and submitted to Council for approval prior to the use of the new
           works (pontoon/jetty extensions). The audit shall demonstrate that the fuel systems are
           in a safe and serviceable condition or, where necessary, identify repair and rectification
           requirements to meet the relevant Australian Standards and industry best practice
           environmental management. Any repair works must be completed, with certification
           submitted by the auditor to Council, prior to the use of the new works (pontoon/jetty
           extensions).
B.    Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
REASONS TO JUSTIFY THE DECISION DESPITE THE CONFLICT WITH THE PLANNING
SCHEME:
Find the following matters relevant to the assessment and sufficient reason to approve the
application:

                                                                                       Page 7 of 89
Log in to download the original file

2022-11-08 Planning & Environment Meeting Agenda(PDF, 5MB).pdf · 5.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.