Original source · versioned page text
2022-11-08 Planning & Environment Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 NOVEMBER 2022
Plan No. Rev. Plan/Document Name Date
34680- 0 Pontoon P3B Foam Details, prepared by The Jetty 2/11/2021
P3B-2 Specialist
34680- 0 Pontoon P3C Construction Details, prepared by The Jetty 2/11/2021
P3C-1 Specialist
34680- 0 Pontoon P3C Foam Details, prepared by The Jetty 2/11/2021
P3C-2 Specialist
34680- 0 Pontoon P3D Construction Details, prepared by The Jetty 2/11/2021
P3D-1 Specialist
34680- 0 Pontoon P3D Foam Details, prepared by The Jetty 2/11/2021
P3D-2 Specialist
34680- 0 Pontoon P3E Construction Details, prepared by The Jetty 2/11/2021
P3E-1 Specialist
34680- 0 Pontoon P3A Foam Details, prepared by The Jetty 2/11/2021
P3D-2 Specialist
34680-B1- 0 Pile Bracket B1 General Arrangement, prepared by The 2/11/2021
1 Jetty Specialist
34680-B1- 0 Pile Bracket B1 Corner Bracket, prepared by The Jetty 2/11/2021
2 Specialist
34680-B1- 0 Pile Bracket B1 Corner Bracket 2, prepared by The Jetty 2/11/2021
3 Specialist
34680-B1- 0 Pile Bracket B1 6mm Chequer Plate, prepared by The Jetty 2/11/2021
4 Specialist
34680-B2- 0 Inboard Pile Bracket B2 General Arrangement, prepared by 2/11/2021
1 The Jetty Specialist
34680-B2- 0 Inboard Pile Bracket B2 Exposed Bracket, prepared by The 2/11/2021
2 Jetty Specialist
34680-B2- 0 Inboard Pile Bracket B2 UA Bracket, prepared by The Jetty 2/11/2021
3 Specialist
34680-SJ- 0 Starter Jetty Platform 2, prepared by The Jetty Specialist 2/11/2021
3
34680-SJ- 0 Starter Jetty Headstock, prepared by The Jetty Specialist 2/11/2021
1
34680-SJ- 0 Starter Jetty Platform 1, prepared by The Jetty Specialist 2/11/2021
2
34680- 0 4m Gangway 1 Construction Detail, prepared by The Jetty 2/11/2021
GW-1 Specialist
Currency
3. This approval lapses where the construction of the jetty extension and pontoons have
not commenced within 17 November 2028, unless application is made and approved
by Council for an extension.
Nature and extent of Use
4. All vessels, kayaks and SUPs for hire and all equipment associated with the marine
use of the facility must wholly moored/stored within the approved lease area, with a
maximum of 31 vessels at any one time.
5. All structures must be constructed wholly within the approved commercial lease area
as per the approved plans.
6. All commercial activities including, the loading and unloading of passengers and boat
docking is confined to the commercial lease areas of the respective commercial
operation.
Structures
7. All structures must use materials, natural finishes and colours that blend with the
surrounding natural landscape.
8. Structures must be designed and constructed such that they are free standing within
Page 6 of 89
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.