Skip to the record
Beware of cheap imitations.

Council archive · source document

Attachment 8 - Interim Stormwater Management Plan - TOPO · 132005.638.06

of 60

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (19.4 MB): may take a few minutes to open.

Log in to see the plans as drawn
                   NOOSA RESOURCE RECOVERY CENTRE
                    INTERIM STORMWATER MANAGEMENT PLAN




CLIENT: NOOSA COUNCIL

DOCUMENT NUMBER: R5304

PROJECT NUMBER: 26-0293

VERSION: A

DATE: 17/09/2026
Full text of the other 59 pages

Page 2

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN




TABLE OF CONTENTS
1    INTRODUCTION                                                                                           1
     1.1. OBJECTIVE & SCOPE                                                                                 1
     1.2. LEGAL REQUIREMENTS                                                                                2
     1.3. GUIDELINES, LICENCE & SUPPORTING INFORMATION                                                      2
     1.4. LICENCE CONDITIONS AND WATER QUALITY OBJECTIVES                                                   2
     1.5. HIGH & LOW EROSION HAZARD SITES                                                                   3
           1.5.1. LOW EROSION HAZARD SITES                                                                  3
           1.5.2. HIGH EROSION HAZARD SITES                                                                 3
     1.6. PRINCIPLES OF SURFACE WATER MANAGEMENT FOR THE SITE                                               4
           1.6.1. DRAINAGE CONTROL                                                                          4
           1.6.2. SEDIMENT CONTROL.                                                                         5
           1.6.3. EROSION CONTROL                                                                           5
2    SITE DESCRIPTION                                                                                       6
     2.1. LOCATION AND OPERATIONS                                                                           6
     2.2. CLIMATE                                                                                           6
     2.3. TOPOGRAPHY                                                                                        7
3    EXISTING STORMWATER MANAGEMENT                                                                         8
     3.1. PREVIOUS DESIGNS & UPGRADES                                                                       10
           3.1.1. SW5 HES BASIN                                                                             10
4    FUTURE WORKS                                                                                           11
     4.1. PROPOSED NORTHERN PRECINCT DEVELOPMENT                                                            11
           4.1.1. SW2 HES BASIN                                                                             12
           4.1.2. LOW EROSION RISK AREAS                                                                    12
5    SITE INSPECTION AND MONITORING                                                                         14
6    RECOMMENDATIONS                                                                                        15
7    REFERENCES                                                                                             16
APPENDIX A CATCHMENT & DRAINAGE PLAN                                                                        A
APPENDIX B SW5 DESIGN REPORT                                                                                B
APPENDIX C RRA (SW2) CONCEPT DESIGN REPORT – HES BASIN AND DRAINAGE                                         C
APPENDIX D IPWEAQ BIORETENTION SYSTEM STANDARD DRAWINGS                                                     D




TABLE OF FIGURES
FIGURE 1 - SITE LOCALITY PLAN (SOURCE: NEARMAP)                                                             1
FIGURE 2 – AERIAL PHOTOGRAPHY AND DISTURBED AREAS (SOURCE: NEARMAPS, IMAGE DATE 24-06-26)                   6
FIGURE 3 – AVERAGE MONTHLY RAINFALL FOR TEWANTIN                                                            7
FIGURE 4 – EXISTING CATCHMENT PLAN                                                                          8
FIGURE 5 – EXISTING DRAINAGE FEATURES                                                                       10
FIGURE 6 – SITE PLAN (SOURCE: COVEY PROJECT NO. 244035, SHEET NO. C1002)                                    12
FIGURE 7 – TYPICAL CONVENTIONAL BIORETENTION SYSTEM PROFILE (EXTRACT IPWEAQ DRAWING DS073)                  13
FIGURE 8 – TYPICAL UNCONSTRAINED SATURATED ZONE BIORETENTION SYSTEM PROFILE (EXTRACT FROM DRAWING DS070).   13


TABLE OF TABLES
TABLE 1 – SURFACE WATER RELEASE LIMITS                                                                      3
TABLE 2 – CATCHMENT DETAILS                                                                                 9




Environment. Engineering. Education.                                                                             PAGE ii

Page 3

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN



1                INTRODUCTION
Topo was engaged by Noosa Council to prepare a Stormwater Management Plan (SMP) for the Noosa Resource
Recovery Centre (NRRC). The site is located on Eumundi-Noosa Road as illustrated in Figure 1.

The site currently operates under the Environmental Authority Permit No. EPPR01855314 and is licensed to carry out the
following environmentally relevant activities (ERA):

       +      ERA 33 – Crushing, milling, grinding or screening > 5000 t per year
       +      ERA 60-(1a) – Waste disposal facility < 50,000 t/yr




Figure 1 - Site Locality Plan (Source: NearMap)

1.1.             OBJECTIVE & SCOPE

The objective of this report is to provide an Interim Stormwater Management Plan for the site, taking into consideration
the current conditions and future works, and identify how runoff will be managed to comply with the relevant guidelines
and licence conditions.

Once the layout for the future works, particularly the development of the northern portion of the site, is confirmed,
hydrologic and hydraulic modelling will be undertaken to size all required drainage features.

This report addresses surface water only and does not include the management of groundwater or leachate.
Environment. Engineering. Education.                                                                             PAGE 1

Page 4

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN



1.2.             LEGAL REQUIREMENTS

Stormwater runoff has the potential to cause water contamination and/or environmental harm and is regulated under
the EP Act. Some of the key legal requirements relevant to the operation of the landfill include:

       +      Where stormwater conditions appear on an environmental authority, it is an offence under s.430 of the EP Act,
              to not comply with the conditions of approval. This includes anyone operating under the environmental
              authority e.g. contractors, consultants etc.
       +      Causing serious or material environmental harm is an offence under s.437 and s.438 of the EP Act respectively.
       +      It is an offence to cause an environmental nuisance under s.440. Environmental nuisance is unreasonable
              interference with an environmental value. It may also include an unhealthy, offensive or unsightly condition
              because of contamination.
       +      Under s.440ZG it is an offence to unlawfully deposit a prescribed water contaminant to waters. The most
              common prescribed contaminants resulting from poor stormwater management of ERA operations are:
                   o chemical, or chemical waste
                   o ashes, clay, gravel, sediment, stones and similar organic or inorganic matter
                   o building and construction materials
                   o building, construction and demolition waste
                   o industrial waste
                   o oil
                   o putrescible waste, and
                   o waste water.
       +      Under s.319 an obligation is placed upon all persons in Queensland who are carrying out activities which may
              cause environmental harm to comply with the ‘general environmental duty’. This requires that all reasonable
              and practicable measures must be adopted to prevent and minimise environmental harm. Although not being
              able to demonstrate compliance against the general environmental duty is not an offence, demonstrating that
              all reasonable and practicable measures have been adopted is a defence for offences such as water
              contamination (DES, 2021).

1.3.             GUIDELINES, LICENCE & SUPPORTING INFORMATION

This SMP has been prepared in accordance with:

       +      Guideline Stormwater and environmentally relevant activities (DETSI, 2025),
       +      Best Practice Erosion and Sediment Control (IECA, 2025),
       +      Queensland Urban Drainage Manual (QUDM) (IPWEAQ, 2016), and
       +      Environmental Authority Permit No. EPPR01855314.

Reference has also been made to the Covey Stormwater Management Plan dated February 2026 (Project No 244035 |
Ref No M26-0032Rpt – Issue A).

1.4.             LICENCE CONDITIONS AND WATER QUALITY OBJECTIVES

The following conditions specified by the site permit relate, directly or indirectly, to the management of stormwater:

WT1 – Site erosion protection measures and sediment control measures must be implemented and must have the
hydraulic effectiveness to treat stormwater for 90 % of the annual runoff for each stormwater catchment.

Where soils are temporarily exposed for the construction of new facilities or to facilitate changes in landfill design, all
reasonable and practical measures must be implemented to minimise the amount of sediments able to discharge from
the site. As a minimum the following design criteria apply:

       1.     Collect and drain stormwater from disturbed soils to a sediment basin sized to contain an 80 th percentile five-
              day event or similar; and
       2.     The design life and design storm for temporary drainage works to convey waters to the sediment basin and
              around disturbed areas are:
                  a. Disturbed area open < 12 months – 1 in 2-year ARI event plus 150 mm freeboard
                  b. Disturbed area open 12-24 months – 1 in 5-year ARI event plus 150 mm freeboard
                  c. Disturbed area open > 24 months – 1 in 10-year ARI event plus 150 mm freeboard
                  d. Temporary culvert crossing – minimum 1 in 1-year ARI hydraulic capacity
Environment. Engineering. Education.                                                                                   PAGE 2

Page 5

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN



WT2 - The release of collected and treated stormwater to waters, from areas of the site not likely to be contaminated
with waste materials, must be in accordance with Table 2 – compliance limits for controlled releases of treated stormwater
to surface waters (reproduced herein as Table 1).

Table 1 – Surface Water Release Limits

          QUALITY
                                       RELEASE POINT             RELEASE LIMIT           LIMIT TYPE               MONITORING FREQUENCY
       CHARACTERISTICS

                   pH                                                6.5 - 9.0              Range

      Specific Conductance
                                                                       1500               Maximum           Commencement of Release then weekly
             (µS/cm)
                                                                                                              thereafter. If no release occurs, no
   Dissolved Oxygen (mg/L)                                               6                 Minimum                  sampling is required.
       Total and Dissolved
                                                                       N/A                Maximum
        Aluminium (mg/L)

                                                                                                            Commencement of Release then weekly
                                             W1                                                               thereafter for a minimum of 5 events
                                                                                                             and until a reliable TSS:NTU correlation
    Suspended Solids (mg/L)                                             50
                                                                                                             is established and agreed in writing by
                                                                                                            the administering authority. If no release
                                                                                                                 occurs, no sampling is required.

                                                                  The established       The NTU value
                                                                   correlation of      that correlates to   Commencement of Release then weekly
            Turbidity (NTU)                                     turbidity with total   50 mg/L TSS with       thereafter. If no release occurs, no
                                                                 suspended solids       a correlation R             sampling is required.
                                                                       (TSS)              value of 0.9




WT3- Monitoring of contaminant releases from release point W1 must be undertaken in accordance with the condition
WT2.

WT4 - In addition to WT2, released to waters must not:

       1.     have any other properties and content concentration causing environmental harm
       2.     produce any slick or other visible evidence of oil or grease, nor contain visible floating oil, grease, scum, litter or
              other visually objectionable matter.

1.5.             HIGH & LOW EROSION HAZARD SITES

The Guideline Stormwater and Environmentally Relevant Activities (DETSI, 2025) classifies ERA sites into two erosion
hazard categories, which determine the applicable stormwater management requirements.

1.5.1.           LOW EROSION HAZARD SITES
A site is only considered a low erosion hazard site where greater than 95 % of the site is effectively stabilised, the
unstabilised area does not exceed 2,500 m², and soil erosion is not expected to exceed 10 tonnes/hectare/year from
disturbed areas. These sites are managed under Part 2 of the guideline, which requires MUSIC modelling and a treatment
train designed to meet the load-reduction targets for Total Suspended Solids (TSS), Total Phosphorus (TP), Total Nitrogen
(TN), and gross pollutants greater than 5 mm.

1.5.2.           HIGH EROSION HAZARD SITES
All other sites are considered high erosion hazard sites. These require a full suite of erosion and sediment controls,
including sediment basins designed to retain runoff from the 24-hour, 1-in-10 year ARI storm event and to achieve a TSS
release concentration of no more than 50 mg/L. Basins must return their design capacity within 120 hours of rainfall and
include a sediment storage zone equal to 50 % of the upper settling volume.

DETSI supports the use of High Efficiency Sediment (HES) basins where it can be demonstrated that the contaminant
load released to the receiving environment over the project life is equal to or less than that of the standard design.


Environment. Engineering. Education.                                                                                                           PAGE 3

Page 6

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN



1.6.             PRINCIPLES OF SURFACE WATER MANAGEMENT FOR THE SITE

Ongoing soil and water management will be required through the life of the project. The three cornerstones of the
erosion and sediment control industry are drainage control, erosion control, and sediment control. The primary function
of each of these principles is summarised below:

       +      Drainage control measures aim to prevent or reduce soil erosion caused by concentrated flow, including the
              management of rill and gully erosion and to appropriately manage the movement of "clean" and "dirty" water
              through the site.
       +      Erosion control measures aim to prevent or reduce soil erosion caused by raindrop impact and sheet flow (i.e.
              the control of splash and sheet erosion)
       +      Sediment control measures aim to trap and retain sediment either moving along the land surface (bed load) or
              contained within flowing water (suspended sediment) (IECA, 2025).

The proper management of stormwater is critical to the implementation of effective erosion and sediment control. The
effective management of stormwater lies in the appropriate control of runoff velocities and volume.

1.6.1.           DRAINAGE CONTROL
The primary functions of drainage controls are to:

       +      minimise the risk of rill and gully erosion;
       +      minimise the risk of hydraulic damage to the adopted erosion and sediment control measures;
       +      control the velocity, volume and location of water flow through the site; and
       +      appropriately manage the movement of "clean" and "dirty" water through the site (IECA, 2025).

The Guideline - Stormwater and environmentally relevant activities (DES, 2021) requires that high erosion hazard sites
implement the following design and management measures:

       +      Erosion protection and sediment control measures should be installed and maintained for all stages of the
              activity to minimise erosion and the release of sediments.
       +      All areas of soil disturbed and exposed should be managed to minimise the loss of sediment through
              revegetation and/or use of other stabilisation techniques.
       +      All concentrated stormwater flows (including ‘clean’ stormwater and ‘dirty’ stormwater) should have
              concentrated flow paths, such as drainage lines, diversion drains, channels and batter chutes (where applicable)
              which have been designed, constructed, effectively armoured and maintained to convey the runoff from events
              up to and including the average recurrence interval (ARI) of:
                   o 1 in 10 year critical duration ARI storm event without causing water contamination, sheet, rill or gully
                        erosion, sedimentation, or damage to structures or property.
       +      Stormwater runoff from external or undisturbed catchments should be diverted around or away from disturbed
              areas as much as possible.
       +      Sediment basin(s) should be installed and maintained to collect and treat stormwater runoff from all disturbed
              areas of the site(s) approved as part of the ERA application, and areas in which any earthen material is stored.
       +      For events up to and including a 24 hour storm event with an ARI of 1 in 10 years, the following must be achieved
                   o a sediment basin must be designed, constructed and operated to retain the runoff at the site(s)
                        approved as part of the ERA application;
                   o the release stormwater from these sediment basins must achieve a total suspended solids (TSS)
                        concentration of no more than 50 mg/L for events up to and including those mentioned above.

              For events larger than those stated above, all reasonable and practical measures must be taken to minimise the
              release of prescribed contaminants.

              An alternative basin design (such as a high efficiency basin) can be used provided it has been demonstrated
              that the contaminant load to be released to the receiving environment for the life of the project will be equal to
              or less than the standard design.

              The department supports high efficiency basin technology especially as it may lead to both flexibility
              for the site operator and if appropriately designed and managed, sound environmental outcomes.

       +      All sediment basins should have a spillway, designed, constructed and effectively armoured to convey
              anticipated flows. Design for a 50 year ARI critical event is considered a minimum.

Environment. Engineering. Education.                                                                                     PAGE 4

Page 7

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN



       +      Any sediment basin designed in accordance with this list must be operated in such a manner that within 120
              hours of the most recent rainfall event, the required design capacity of the upper settling volume is available for
              capture and storage of stormwater runoff from the next rainfall event.
       +      In addition to the settling volume requirements, sediment basins should be designed with a sediment storage
              zone equal to 50 % of the upper settling volume, or the volume of the sediment determined by estimating the
              expected sediment runoff volumes over the desired maintenance period of not less than 4 months.

1.6.1.1.         CLEAN WATER DIVERSION
A key component of managing surface waters is the diversion of ‘clean’ runoff away from disturbed portions of the site.
Clean water is defined as water that either enters the property from an external catchment and has not been further
contaminated by sediment within the site, or water that has originated from the site and is of such quality that it does
not need to be treated in order to achieve the required water quality standard, or would not be further improved if it
was to pass through a sediment trap (IECA, 2025).

In diverting clean water around the disturbed portions of the site, it will remain separated from the sediment laden runoff
that requires treatment. It is important that clean water diversion drains are constructed prior to new areas being
disturbed to reduce the likelihood of runoff being contaminated. This management technique has the potential to
greatly reduce the size and operational costs of treatment devices. The clean water drains should be designed to convey
runoff associated with the 10 % Annual Exceedance Probability (AEP) event, in accordance with the Guideline Stormwater
and environmentally relevant activities (DES, 2021).

1.6.1.2.         DIRTY WATER DRAINAGE
Dirty Water Drains (DWD) and diversion bunds are required to convey sediment laden runoff from disturbed areas to
the sediment basin. The dirty water drains will also be designed to convey runoff associated with the 10 year ARI critical
duration event, in accordance with the Guideline Stormwater and environmentally relevant activities (DES, 2021).

1.6.2.           SEDIMENT CONTROL.
To achieve the required release criteria, treatment of dirty site runoff will be required in a Type 1 treatment system. In
accordance with the site permit, sediment control measures must be implemented and must have the hydraulic
effectiveness to treat stormwater for 90 % of the annual runoff for each stormwater catchment. A HES basin is proposed
to achieve this objective, with further details provided in later sections of this report.

1.6.3.           EROSION CONTROL
Erosion control measures aim to prevent or reduce soil erosion caused by raindrop impact and sheet flow. One of the
most effective forms of long term erosion control is the stabilisation of disturbed areas. Where possible, progressive
stabilisation and revegetation of the non–operational areas must be undertaken. If an area is to be non–operational for
only a short duration, temporary measures (such as mulch/compost blankets or jute matting) must be applied.
Temporary stabilisation should also be provided as works are progressing towards the final level, and this can be achieved
through the application of soil binders. Stabilisation of high traffic areas should also be provided, particularly at the truck
unloading points. Stabilisation can be achieved using a layer of crushed concrete, ideally 150 – 200 mm thick or gravel.




Environment. Engineering. Education.                                                                                      PAGE 5

Page 8

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN



2                SITE DESCRIPTION
2.1.             LOCATION AND OPERATIONS

The NRRC is located on Eumundi-Noosa Road, Doonan and undertakes a range of waste processing and resource
recovery operations over the site. A large portion of the site is finished landfill and has a vegetated surface. Activities
across the site include:

       +      waste collection,
       +      resource recovery,
       +      concrete crushing/recycling,
       +      green waste recovery and processing, and
       +      oil and paint collection.

The site activities and disturbed areas, as of the 24 th July 2026 are illustrated in Figure 2.




                                                              Green Waste
                                                               Processing
                         Site Entry
                                                  HES Basin            Concrete
                                                                      Processing


                    Weighbridge



                                       Resource
                                       Recovery




                                                                                              HES Basin




Figure 2 – Aerial Photography and Disturbed Areas (Source: NearMaps, image date 24-06-26)

2.2.             CLIMATE

The Bureau of Meteorology (BOM) provides average monthly rainfall data for Tewantin RSL Park (Gauging Station
040908 - the nearest site to Eumundi with monthly climate records). Based on this data, the average annual rainfall is
~1,610 mm. Rainfall has a distinctly seasonal pattern, with approximately 67 % of the annual average rainfall occurring
between December and May inclusive. The average monthly rainfall records are illustrated in Figure 3.




Environment. Engineering. Education.                                                                                PAGE 6

Page 9

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN




                                              Figure 3 – Average monthly rainfall for Tewantin

2.3.             TOPOGRAPHY

The topography varies considerably across the site due to historic landfilling operations. The peak elevations occur in
the central portion of the site at ~40.5 m AHD. A central ridgeline through the completed cells directs a large portion of
site runoff to existing drainage features that convey runoff in a northerly direction, either to the site discharge point for
clean water catchments or to the existing HES basin for runoff from high erosion risk areas. All runoff from site is directed
to the northern and north-eastern boundary to discharge points SW2, SW4 and SW5. Details on the existing catchments
and flowpaths are provided in Appendix A with further details provided in Section 3.

A digital terrain model (DTM) of the site was developed from the 2023 LiDAR survey (1 m grid, GDA94 MGA Zone 56)
and interrogated to characterise site grades and the directions of fall.

Site slopes are highly variable with the cell batters ranging between 1:4 (Vertical to Horizontal) to 1:6. The hardstand
areas in the northern portion of the site are considerably flatter, typically less than 2 %. Levels across the site range from
approximately 12.5 m AHD along the northern boundary to approximately 40.5 m AHD at the peak of the completed
cells,(Cell 1.1), falling towards existing drainage features that convey runoff to discharge points at elevations ranging
between 12 to 16 m AHD.

An existing site drainage and catchment plan is presented in Section 3.




Environment. Engineering. Education.                                                                                  PAGE 7

Page 10

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN



3                EXISTING STORMWATER MANAGEMENT
Based on analysis of the survey data and aerial photography, catchment delineation has been undertaken over the site,
as well as identification of the key drainage features conveying runoff to treatment systems and the approved discharge
locations. 22 site catchments have been defined, as well as 2 external catchment that direct runoff into the site. An
extract of catchment plan is provided as Figure 4, with catchment details summarised in Table 2.




Figure 4 – Existing Catchment Plan

The existing drainage features are presented as Figure 5. A copy of the catchment plan and the existing drainage plan
also included as Appendix A.

       +      The bulk of the site discharges to one of the existing HES basins discharging to SW2 and SW5.
       +      A sediment basin is provided within Catchment 16 for the treatment of stormwater runoff from the active filling
              area:
                  o It is unclear whether runoff from a portion of Catchment 17 that appears to be disturbed is receiving
                      appropriate treatment.
                  o If this is a dirty water catchment and cannot be graded to the basin in Catchment 16, runoff should be
                      directed to the southern HES (SW5).
       +      Portions of the site along the eastern boundary (Catchments 12 and 22) appear to have the potential to be
              released at a non-approved discharge location:
                  o Based on the analysis of aerial photography, these catchments seem to be predominantly ‘clean’ due
                      to the extent of vegetation.
                  o Further investigation may be required to ensure the requirements of the permit are being met in relation
                      to approved discharge points.




Environment. Engineering. Education.                                                                                  PAGE 8

Page 11

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN



Table 2 – Catchment Details

    CATCH                AREA          MIN. ELEVATION            MAX. ELEVATION   AVERAGE SLOPE   25 %ILE SLOPE
      ID                  (ha)            (m AHD)                   (m AHD)            (%)             (%)

          1                0.47             12.7                      15.2             3.2             1.6

         2                 1.72             13.2                      16.9             5.9             2.0

         3                 0.52             13.0                      17.2             12.4            3.6

         4                 1.22             11.1                      15.6             10.9            3.5

         5                 3.33             11.4                      17.8             6.3             1.2

         6                 2.15             11.3                      17.7             3.0             0.7

         7                 0.85             14.3                      19.8             15.2            3.1

         8                 1.01             13.8                      19.8             8.4             2.0

         9                 3.73             13.8                      40.3             19.2           14.8

         10                3.28             15.6                      40.1             13.3            6.4

         11                2.96             14.6                      40.5             14.1            5.7

         12                0.40             16.6                      21.7             10.2            3.4

         13                1.00             16.2                      30.1            22.4             5.6

         14                3.05             16.8                      37.7             16.0            6.3

         15                1.88             17.4                      39.6             13.9            8.6

         16                2.21             18.0                      37.7             10.9            3.6

         17                2.49             19.5                      36.3             13.2            4.7

         18                0.35             23.3                      28.3             14.8            6.6

         19                1.75             19.0                      28.4             15.8            5.5

        20                 1.23             20.0                      26.2             12.0            5.7

         21                4.33             16.7                      30.6             9.7             2.9

        22                 1.19             16.9                      30.4            20.0             3.3




Environment. Engineering. Education.                                                                         PAGE 9


[OCR of page images]
E RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN TOPO.

 

Table 2 - Catchment Details

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CATCH AREA MIN. ELEVATION MAX. ELEVATION AVERAGE SLOPE 25 %ILE SLOPE
ID (ha) (m AHD) (m AHD) (%) (%)
1 0.47 12.7 15.2 3.2 1.6
2 1.72 13.2 16.9 5.9 2.0
3 0.52 13.0 17.2 12.4 3.6
4 1.22 11.1 15.6 10.9 3.5
5 3.33 11.4 17.8 6.3 12
6 2.15 11.3 17.7 3.0 0.7
7 0.85 14.3 19.8 15.2 3.11
8 1.01 13.8 19.8 8.4 2.0
9 3.73 13.8 40.3 19.2 14.8
10 3.28 15.6 40.1 13.3 64
11 2.96 14.6 40.5 141 5.7
12 0.40 16.6 217 10.2 3.4
13 1.00 16.2 30.11 22.4 5.6
14 3.05 16.8 377 16.0 6.3
15 1.88 17.4 39.6 13.9 8.6
16 2.21 18.0 377 10.9 3.6
17 2.49 19.5 36.3 13.2 47
18 0.35 23.3 28.3 14.8 6.6
19 175 19.0 28.4 15.8 5.5
20 1.23 20.0 26.2 12.0 5.7
21 4.33 16.7 30.6 9.7 29
22 1.19 16.9 30.4 20.0 3.3
Environment. Engineering. Education. PAGE

Page 12

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN




Figure 5 – Existing Drainage Features

3.1.             PREVIOUS DESIGNS & UPGRADES

3.1.1.           SW5 HES BASIN
Previous modelling and designs were undertaken by Topo for a Type A HES for the southern catchment, being directed
to the SW5 outlet. The basin was designed for a 4.5 ha catchment, with a clean water diversion drain sized for a maximum
6.2 ha catchment to divert clean water flows around the basin. Drains were sized for the 1 in 10 year ARI critical storm.

The basin was assessed using a MUSIC water-balance model against the EA requirement to treat 90 % of annual runoff.
The modelling demonstrated 90.3 % annual runoff treatment is achieved, exceeding the performance of a 10 year 24
hour traditional basin (85.2 %). The basin includes automatic flocculant dosing and a monitoring system reading
turbidity, pH, electrical conductivity and dissolved oxygen, linked to a power-actuated outlet valve that closes when
readings fall outside the EA release limits.

Refer to Appendix B – Design Report & Maintenance and Inspection Plan: Noosa Landfill – Clean Water Drain & High-
Efficiency Sediment Basin (SW5) for further details.




Environment. Engineering. Education.                                                                              PAGE 10

Page 13

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN



4                FUTURE WORKS
4.1.             PROPOSED NORTHERN PRECINCT DEVELOPMENT

The northern portion of the site is proposed for redevelopment as part of the Doonan Landfill Resource Recovery Facility
upgrade (Stage 1A). The proposed works, as summarised in Table 2, comprise a composting facility, new site offices and
amenities, internal access roads, drainage. A new a HES basin is also proposed and will discharge runoff to release point
SW2. Additional details, including detailed civil and stormwater design, are being undertaken by Covey Associates.

Table 2 – Proposed Northern Precinct Works

  ELEMENT                              DESCRIPTION


  Composting facility                  In-vessel composting (IVC) facility for green organics to be located adjacent to the RRA pad.


                                       New transfer station building with associated site office and amenities (Sherson Architecture
  Site offices and amenities
                                       concept design, 2026), public and customer weighbridges, and gravel hardstand parking.


                                       Reconfigured internal access roads and site entrance, including a 5.0 m x 2.4 m reinforced
  Roads
                                       concrete box culvert (RCBC) crossing on the site entrance.


                                       Earthworks and drainage infrastructure, including overland flow (clean-water) swales to divert
  Drainage                             external catchment runoff around the site and convey local flows, with dirty-water drainage
                                       directed to the HES basin.


                                       Type A HES basin (Covey Associates, 2026) with a surface area of approximately 2,733 m²,
  High efficiency sediment             treating approximately 6.0 ha, with optional constructed floating wetlands for nutrient polishing.
  basin                                Designed for controlled release in accordance with EA Condition WT2 (TSS not exceeding 50
                                       mg/L) at SW2.


For further details, please refer to the extract of the Doonan Resource Recovery Development Site Plan presented as
Figure 5.




Environment. Engineering. Education.                                                                                                PAGE 11

Page 14

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN




Figure 6 – Site Plan (Source: Covey Project No. 244035, Sheet No. C1002)



4.1.1.           SW2 HES BASIN
A concept design was undertaken for the HES basin proposed to discharge runoff to SW2. The basin was sized for a 7.83
hectare catchment, with diversion drains designed for the 1 in 10 year ARI event with additional freeboard.

A Type A basin is proposed, similar to SW5, and designed to achieve the 90 % annual runoff target. This was
demonstrated with water balance modelling in MUSIC. The Covey stormwater management plan and preliminary basins
design appears consistent with the concept design that was provided and is therefore considered appropriate for the
northern portion of the site.

For further details, refer to the concept design report included as Appendix C - Concept Design Report – HES Basin and
Drainage: Noosa Landfill – RRA (Topo R3341).

4.1.2.           LOW EROSION RISK AREAS
Per the requirements of DETSI 2025, runoff from low erosion risk areas, such as the Cleanaway Depot, Reviva Centre,
and areas surrounding the transfer station can be treated in bioretention systems designed to achieve load-based
reduction targets of 80 %, 60 % and 45 % for TSS, TP and TN respectively. MUSIC modelling will be undertaken as the
design of these areas progresses.

Typically, bioretention systems require approximately 1.5 % of the contributing catchment area to be provided as filter
media, with extended detention depths of 200 to 300 mm typically provided.

Subject to final levels, saturated zones may be required to discharge runoff from the treatment systems. All designs will
be undertaken in accordance with the IPWEAQ Water Sensitive Urban Design. Typical sections provided by IPWEAQ are
included as Figure 6 and Figure 7, for a conventional and a saturated filter media system. Refer to Appendix D for further
details.


Environment. Engineering. Education.                                                                               PAGE 12

Page 15

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN




Figure 7 – Typical conventional bioretention system profile (Extract IPWEAQ Drawing DS073)




Figure 8 – Typical unconstrained saturated zone bioretention system profile (Extract from Drawing DS070).




Environment. Engineering. Education.                                                                        PAGE 13

Page 16

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN



5                SITE INSPECTION AND MONITORING
SMPs should be considered live documents that in some instances will require review and updating as site conditions
change, or if the adopted measures fail to achieve the required treatment standard.

Site inspections and monitoring are to be undertaken as detailed below. When a site inspection detects a notable failure
in the adopted drainage or other ESC measures, the source of this failure must be reported, investigated and appropriate
amendments made.

Best practice site management requires all ESC measures to be inspected at the following frequencies and include the
following checks as a minimum:

Daily site inspections (during rainfall)
       +      All drainage, erosion and sediment control measures
       +      Occurrences of excessive sediment deposition (whether on-site or off-site)
       +      All site discharge points (including dewatering activities as appropriate)
Weekly site inspections (even if work is not occurring on-site)
       +      All drainage, erosion and sediment control measures
       +      Occurrences of excessive sediment deposition (whether on-site or off-site)
       +      Occurrences of litter or sediment placed, deposited, or washed from the site, including deposition by vehicular
              movements
       +      Oil, fuel and chemical storage facilities
Following runoff producing rainfall (within 18 hours of rainfall event)
       +      All drainage, erosion and sediment control measures
       +      Occurrences of excessive sediment deposition (whether on-site or off-site)
       +      Occurrences of litter or sediment placed, deposited, or washed from the site, including deposition by vehicular
              movements




Environment. Engineering. Education.                                                                                  PAGE 14

Page 17

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN



6                RECOMMENDATIONS
The following recommendations are made as landfilling operations continue across the site and design of the northern
precinct redevelopment continues.

       +      Assess the catchments within the active filling zones and ensure all disturbed areas are being directed to an
              appropriately sized sediment control.
       +      Inspect the eastern boundary on the edges of Catchments 12 and 22 and ensure all runoff has been managed
              in accordance with the site permit and discharged at an appropriate location.
       +      Implement the recommendations of the Topo concept design and Covey stormwater management plan for the
              upgraded HES basin at SW2.
       +      Investigate options for the treatment of runoff from low erosion risk areas in the northern portion of the Doonan
              Landfill Resource Recovery Facility, which is likely to be bioretention systems.
       +      Ensure all drainage for the Doonan Resource Recovery development is designed to convey peak flows associated
              with the 1 in 10 year (10% AEP) event per DETSI 2025, or as required to ensure the necessary flow rates are
              conveyed to the HES basin to achieve the annual runoff treatment percentage necessary.




Environment. Engineering. Education.                                                                                    PAGE 15

Page 18

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN



7                REFERENCES
Covey Associates Pty Ltd, 2026. Stormwater Management Plan – Doonan Landfill, 561 Eumundi-Noosa Road, Doonan
(244035, M26-0032Rpt, Issue A), Maroochydore: Covey Associates Pty Ltd.

Covey Associates Pty Ltd, 2026. Flood Impact Assessment – Doonan Landfill (M25-0479Rpt-A), Maroochydore: Covey
Associates Pty Ltd.

Covey Associates Pty Ltd, 2026. Doonan Resource Recovery Redevelopment – Complete Site Plan (Drawing C1000, Issue
F), Maroochydore: Covey Associates Pty Ltd.

Department of the Environment, Tourism, Science and Innovation (2025) Guideline: Stormwater and Environmentally
Relevant Activities, ESR/2015/1653, Version 1.08, State of Queensland.

OREZ, 2026. Noosa Composting Facility – Process Design Strategy (PR25001, Revision 03), OREZ.

Sherson Architecture, 2026. Noosa Compost Facility – Conceptual Design, 30% Submission (20260272-CP), Sherson
Architecture.

Institute of Public Works Engineering Australasia (IPWEAQ), 2017. Queensland Urban Drainage Manual (QUDM), Fourth
Edition, Brisbane: IPWEAQ.

Noosa Council, 2020. Noosa Plan 2020, Noosa: Noosa Council.




Environment. Engineering. Education.                                                                      PAGE 16

Page 19

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN




APPENDIX A
CATCHMENT & DRAINAGE PLAN




Environment. Engineering. Education.                                 PAGE A

Page 20

                                                                      SW4




                                                                                                                                                                                                                                                                               SW5




                                                SW2




LEGEND
         MAJOR CONTOURS (5 m)
         MINOR CONTOURS (1 m)
         CADASTRAL BOUNDARIES
         SITE CATCHMENTS
         EXTERNAL CATCHMENTS
  SW5    DISCHARGE LOCATIONS

                                                                                                                                                                              CLIENT                                                                    PROJECT
                                                                                         0                         70                               COPYRIGHT C                                     NOOSA COUNCIL                                                    NOOSA RESOURCE RECOVERY CENTRE
                                                                                                                                                TOPO GROUP PTY LTD
                                                                                                                                                                              DRAWN                   DESIGNED              DATE                        DRAWING TITLE
                                                                                                  SCALE 1: 3500                          THIS DOCUMENT MAY NOT BE COPIED OR            SC                        SC             22-09-2026                              STORMWATER MANAGEMENT PLAN
                                                                                                                        ISSUED FOR USE   TRANSMITTED IN ANY FORM OR BY ANY
                                   A       ORIGINAL ISSUE       SC          22-09-2026                                                   MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                              RPEQ / SIGNATURE (IF REQUIRED)                                                                  CATCHMENT PLAN
                                                                                                                  A3
                                                                                              H




                                                                                                                                         THE WRITTEN CONSENT OF TOPO GROUP                                                                              PROJECT No                   DRAWING No         REVISION
                                                                                             RT
                                                                                         O




                                REVISION   DESCRIPTION      APPROVED BY      DATE                                                                                                                                                                                    26-0293                      D01        A
                                                                                         N




                                                                                                                                                       PTY LTD.                                                       CPESC NO. 6,599 RPEQ NO. 15,545

Page 21

                                                                                                                                                                                                                                                                                                    HES BASIN
                                                                                                                                                                                                                                                                                                      (SW5)


                                                                               )
                                                                             W2
                                                                           (S
                                                                      IN
                                                                    AS
                                                                  SB
                                                                HE




LEGEND
         MAJOR CONTOURS (5 m)
         MINOR CONTOURS (1 m)
         CADASTRAL BOUNDARIES
         UNDERGROUND DRAINAGE
         OPEN DRAINS
         DIVERSION BUNDS
         ROCK-LINED BATTER CHUTES

                                                                                                                                                                                                   CLIENT                                                                    PROJECT
                                                                                                              0                         70                               COPYRIGHT C                                     NOOSA COUNCIL                                                    NOOSA RESOURCE RECOVERY CENTRE
                                                                                                                                                                     TOPO GROUP PTY LTD
                                                                                                                                                                                                   DRAWN                   DESIGNED              DATE                        DRAWING TITLE
                                                                                                                       SCALE 1: 3500                          THIS DOCUMENT MAY NOT BE COPIED OR            SC                        SC             22-09-2026                              STORMWATER MANAGEMENT PLAN
                                                                                                                                             ISSUED FOR USE   TRANSMITTED IN ANY FORM OR BY ANY
                                       A       ORIGINAL ISSUE                          SC        22-09-2026                                                   MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                   RPEQ / SIGNATURE (IF REQUIRED)                                                                  DRAINAGE PLAN
                                                                                                                                       A3
                                                                                                                   H




                                                                                                                                                              THE WRITTEN CONSENT OF TOPO GROUP                                                                              PROJECT No                  DRAWING No         REVISION
                                                                                                                  RT
                                                                                                              O




                                    REVISION   DESCRIPTION                         APPROVED BY    DATE                                                                                                                                                                                    26-0293                     D02        A
                                                                                                              N




                                                                                                                                                                            PTY LTD.                                                       CPESC NO. 6,599 RPEQ NO. 15,545

Page 22

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN




APPENDIX B
SW5 DESIGN REPORT




Environment. Engineering. Education.                                 PAGE B

Page 23

                    DESIGN REPORT & MAINTENANCE
                         AND INSPECTION PLAN
                       NOOSA LANDFILL – CLEAN WATER DRAIN &
                        HIGH-EFFICIENCY SEDIMENT BASIN (SW5)




CLIENT: NOOSA SHIRE COUNCIL

DOCUMENT NUMBER: R1767

VERSION: IFC

DATE: 05/10/21

Page 24

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN




TABLE OF CONTENTS
1    INTRODUCTION                                                                                                1
2    CATCHMENT AND STAGING                                                                                       1
3    DRAINAGE DESIGN                                                                                             1
     3.1. DIVERSION DRAIN TO BASIN                                                                               1
     3.2. INLET DRAIN FOR DOSING                                                                                 1
     3.3. LEVEL SPREADER WEIR                                                                                    1
     3.4. DECANT STRUCTURE                                                                                       1
     3.5. EMERGENCY SPILLWAY                                                                                     1
     3.6. CLEAN WATER DIVERSION DRAIN                                                                            2
          3.6.1. MANNINGS ROUGHNESS SENSITIVITY ANALAYSIS                                                        2
4    BASIN VOLUME AND SIZE                                                                                       2
     4.1. EA REQUIREMENT                                                                                         2
     4.2. ASSESSMENT APPROACH                                                                                    2
     4.3. HISTORIC RAINFALL PERIOD                                                                               2
     4.4. CATCHMENT                                                                                              2
     4.5. CATCHMENT LOSSES                                                                                       3
          4.5.1. 10 YEAR 24 HOUR TRADITIONAL BASIN                                                               3
          4.5.2. TYPE A HES BASIN                                                                                3
     4.6. BASIN OPERATION APPROACH                                                                               3
          4.6.1. 10 YEAR 24 HOUR TRADITIONAL BASIN                                                               3
          4.6.2. TYPE A HES BASIN                                                                                3
     4.7. RESULTS                                                                                                3
5    HYDROLOGIC & HYDRAULIC MODELLING                                                                            3
     5.1. RAINFALL                                                                                               4
     5.2. PEAK FLOW RATE                                                                                         4
     5.4. PEAK FLOW DEPTHS                                                                                       6
6    OPERATION & MAINTENANCE                                                                                     7
     6.1. DOSING SYSTEM                                                                                          7
     6.2. MONITORING SYSTEM                                                                                      7
     6.3. SEDIMENT BASIN                                                                                         7
          6.3.1. FOREBAY                                                                                         7
          6.3.2. MAIN CELL                                                                                       8
     6.4. DESIGN EVENT & COMPLIANCE                                                                              8
APPENDIX A – CATCHMENTS & STAGING                                                                                9
APPENDIX B – BASIN CALCULATIONS                                                                                  10




Environment. Engineering. Education                                                                               PAGE ii

Page 25

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN



1                INTRODUCTION
This design report applies to proposed construction of the Southern Clean Water Drain and the High-Efficiency Sediment
Basin located at outlet SW5. This design report has been provided to detail catchments, staging and operational
requirements for the proposed sediment basin and clean water drain.

2                CATCHMENT AND STAGING
The maximum catchment assumed to drain to the sediment basin is 4.5 hectares. This will occur as Cell 3.2 and 3.3 is
formed and can grade to the basin. It should be noted that to minimise the size of the basin, Cell 3.2 and 3.3 is required
to be split into quadrants to ensure the maximum catchment to the basin is not exceeded. This will allow a maximum of
half of Cell 3.2 and 3.3 to be graded to the basin.

The maximum catchment grading to the clean water drain is 6.2 hectares. This will occur once Cell 1.1 and Cell 2.2 are
capped and stabilised. The maximum catchment defined does not include the additional 4.5 hectares grading to the
sediment basin which will overtop into the final portion of the clean water drain. For assessment purposes, this additional
catchment has been included in the assessment of the downstream portion of the clean water drain.

Details on Catchments and Staging is provided in Appendix A.

3                DRAINAGE DESIGN
3.1.                DIVERSION DRAIN TO BASIN

The diversion drain to the basin has been sized for the 1 in 10 year ARI critical storm event in accordance with the
Guideline - Stormwater and environmentally relevant activities (DES, 2019). The Environmental Authority (EPPR01855314)
also specifies that the design event for temporary drainage works to convey waters to the sediment basin and around
disturbance areas is a 1 in 10 year ARI event plus 150mm freeboard for > 24 months disturbance.
To cater for the 4.5 hectare catchment and flat grade, a 3m wide turf lined drain with a minimum depth of 700mm
including freeboard is required. Refer to Section 5 for hydraulic modelling undertaken.

3.2.                INLET DRAIN FOR DOSING

To improve accuracy of flow depth measurement, the drain width at the dosing point has been reduced to 0.7m by
increasing the longitudinal grade from 0.7% to 3% and providing a concrete lining. The inlet drain has also been sized
for the 1 in 10 year ARI critical storm event in accordance with the Guideline - Stormwater and environmentally relevant
activities (DES, 2019). Refer to Section 5 for hydraulic modelling undertaken.

3.3.                LEVEL SPREADER WEIR

The level spreader is the weir in between the forebay and main cell. The level spreader has been sized for the 100 year
ARI critical storm event which is in excess of the 50 year ARI required in accordance with the Guideline - Stormwater and
environmentally relevant activities (DES, 2019). The level spreader has a width of 16 m and is concrete lined with a full
width concrete chute. The maximum water depth across the weir in a 100 year ARI is 190 mm.

Refer to Section 5 for hydraulic modelling and Appendix B for calculations undertaken.

3.4.                DECANT STRUCTURE

The decant structure has been designed in accordance with Appendix B - Sediment Basins (IECA, 2018). In accordance
with Table 5 of the document a maximum decant flow rate of 9L/s/ha has been adopted. To achieve a total of 40.5L/s
through the decant arms, a total of 13 decant arms would be required utilising the standard of 200 holes with a diameter
of 10mm. To reduce the number of arms to a pracital number, 17mm diameter holes are to be utilsied to increase the
flow rate to approximately 13L/s per arm, allowing the use of 3 arms and a single manhole structure.

3.5.                EMERGENCY SPILLWAY

The emergency spillway from the main cell has been sized for the 100 year ARI critical storm event which is in excess of
the 50 year ARI required in accordance with the Guideline - Stormwater and environmentally relevant activities (DES,



Environment. Engineering. Education.                                                                                PAGE 1

Page 26

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN



2019). The spillway has a width of 15 m and is concrete lined with a rock chute and dissipater. The maximum water depth
across the weir in a 100 year ARI is 170 mm.

Refer to Section 5 for hydraulic modelling and Appendix B for calculations undertaken.

3.6.                CLEAN WATER DIVERSION DRAIN

The clean water diversion drain has been sized for the 1 in 10 year ARI critical storm event in accordance with the Guideline
- Stormwater and environmentally relevant activities (DES, 2019).
To cater for the maximum 6.2 hectare catchment and flat grade, a 3m wide turf lined drain with a minimum depth of
500mm to 700mm including freeboard is required. Refer to Section 5 for hydraulic modelling undertaken.
3.6.1.           MANNINGS ROUGHNESS SENSITIVITY ANALAYSIS
An analysis of the sensitivity of flood depths with the clean water drain was undertaken based on a fully turfed drain vs
a turf lined base with vegetated batters. A Manning’s roughness of 0.15 was adopted as a worst case scenario for the
planted batters.

The sensitivity analysis indicate a flood depth increase ranging from 30mm to 80mm in the drain, however, all flows will
be contained within the drain indicating no concern in regards to planting batters from a flow conveyance position.

4                BASIN VOLUME AND SIZE
4.1.                EA REQUIREMENT

The Environmental Authority (EPPR01855314) specifies that site erosion protection measures and sediment control
measure must be implemented to have the hydraulic effectiveness to treat stormwater for 90% of the annual runoff for
each stormwater catchment.

4.2.                ASSESSMENT APPROACH

An assessment of a Type A High-Efficiency Sediment basin was undertaken utilising the MUSIC (Model for Urban
Stormwater Improvement Conceptualisation) software as a water balance model to determine the percentage of annual
runoff discharged from the decant structure rather than over the emergency spillway. In accordance with IECA (2018),
Type A basins are sized to allow the design event runoff to discharge (treated) from the decant structure with any runoff
overtopping the emergency spillway to be considered over-design. The MUSIC analysis was undertaken for three Type
A sediment basin design events (and corresponding basin sizes):

       +      1 year ARI, 24 hour (short-term design event in accordance with IECA (2018))
       +      2 year ARI, 24 hour
       +      5 year ARI, 24 hour (long-term design event in accordance with IECA (2018))

In addition, a comparison of the effectiveness of a 10 year 24 hour traditional sediment basin was undertaken using a
water balance model to determine the percentage of annual runoff that would be captured and treated by the basin.
This assessment is not required to determine the size of the Type A sediment basin, however, provides some additional
justification for achieving a 90% annual runoff treatment target.

4.3.                HISTORIC RAINFALL PERIOD

The models utilised 10 years of historic rainfall from the Cooroy Composite Station (Station ID 40059) for the period
between 1/1/1973 – 31/12/1983. This period is considered representative of historic rainfall and is in accordance with the
Water By Design MUSIC Modelling Guidelines. A 6 minute timestep was utilised in the HES basin assessment, where a
daily rainfall total was utilised from the Station data for the traditional basin assessment.

4.4.                CATCHMENT

A 1 hectare catchment was assessed. A range of catchment sizes were also assessed for the HES basin model as a
sensitivity analysis. It was found that that catchment size did not significantly affect the annual runoff treatment
performance.




Environment. Engineering. Education.                                                                                 PAGE 2

Page 27

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN



4.5.                CATCHMENT LOSSES

4.5.1.           10 YEAR 24 HOUR TRADITIONAL BASIN
A sensitivity analysis of a range of Initial and Ongoing losses was undertaken for the water balance model. As the losses
associated with rainfall also affected the basin size (traditional basin size is calculated based on catchment size, design
rainfall depth and rainfall loss) it was found that the losses adopted had minimal effect on the percentage of annual
runoff treated with performance ranging from 83.4 – 85.5%.

4.5.2.           TYPE A HES BASIN
To ensure the HES basin model catchment runoff was consistent with the traditional basin model, the fraction impervious
in the source node was modified to ensure the total annual runoff was equivalent to the traditional basin model. This
was undertaken for a range of losses utilised in the traditional basin model for comparison purposes.

4.6.                BASIN OPERATION APPROACH

4.6.1.           10 YEAR 24 HOUR TRADITIONAL BASIN
For the purpose of the model, it was assumed that only runoff that was captured and had 5 consecutive days of no
runoff (i.e. minimal rainfall) would achieve treatment and release and could be considered treated. If further rainfall
occurred within the 5 succeeding days, then it was assumed the basin had not been dewatered and the basin would
continue to fill or overtop if that capacity had been reached. Any runoff that overtopped the spillway was considered to
be untreated.

4.6.2.           TYPE A HES BASIN
For the purpose of the model, an outlet pipe was sized in the MUSIC model based on the proposed decant outlet rate
in accordance with IECA (2018). All runoff discharging from the decant structure was considered treated with any runoff
overtopping the spillway to be considered untreated. This is in accordance with the design approach detailed in IECA
(2018).

4.7.                RESULTS

The results below show the percentage of annual runoff treated for a range of basin types sized in accordance with IECA
(2018).

Table 1 – Performance of 10 year 24 hour basin vs HES basins with various design events

                                                                                   Percentage of
                                                                                   Annual Runoff
                                                                                      Treated

  1 in 10 year 24 hour traditional basin                                                 85.2%

  1 in 1 year 24 hour Type A basin (HES)                                                 90.3%

  1 in 2 year 24 hour Type A basin (HES)                                                 93.0%

  1 in 5 year 24 hour Type A basin (HES)                                                 96.3%

Based on the results provided, a 1 in 1 year ARI Type A basin will exceed the performance of a 10 year 24 hour traditional
sediment basin and also achieve the 90% requirement of annual runoff treatment specified in the Environmental
Authority.



5                HYDROLOGIC & HYDRAULIC MODELLING
Hydrologic and hydraulic modelling has been carried out using the XP-Storm software. Drain sections have been
modelled as per the design plans for the 10 % AEP and 1 % AEP events. The layout of the model is illustrated as Figure
1, showing the clean and dirty water drains.




Environment. Engineering. Education.                                                                                PAGE 3

Page 28

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN




Figure 1 – XP Model for Drainage Assessment

5.1.                RAINFALL

Modelling was undertaken for 10 % and 1 % Annual Exceedance Probability (AEP) storm events for durations between 15
minutes and 3 hours. Intensity Frequency Duration (IFD) data for the hydrologic modelling was obtained from the Bureau
of Meteorology website, and has been developed in accordance with Australian Rainfall and Runoff (ARR) 2016. The IFD
data is summarised in Table 2.

Table 2 – Intensity Frequency Duration Data

    DURATION (mins)                    10 % AEP (MM/HR)              1 % AEP (MM/HR)

                  15                        152.0                            217.0

                 20                         133.0                             191.0

                 25                          119.0                           172.0

                 30                         108.0                            158.0

                 45                          87.1                            129.0

                 60                          74.2                             112.0

                 90                          59.0                             90.7

                 120                         50.1                             78.1

                 180                         39.8                             63.3



5.2.                PEAK FLOW RATE

A range of design storm durations was assessed to ensure the critical duration event was taken into consideration. The
Guideline - Stormwater and environmentally relevant activities (EHP, 2014) requires that high erosion hazard sites
implement the following design and management measures:



Environment. Engineering. Education.                                                                             PAGE 4

Page 29

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN



       +      All concentrated stormwater flows (including ‘clean’ stormwater and ‘dirty’ stormwater) should have
              concentrated flow paths, such as drainage lines, diversion drains, channels and batter chutes (where applicable)
              which have been designed, constructed, effectively armoured and maintained to convey the runoff from events
              up to and including the average recurrence interval (ARI) of 1 in 10 year critical duration ARI storm event without
              causing water contamination, sheet, rill or gully erosion, sedimentation, or damage to structures or property.

The Environmental Authority (EPPR01855314) also specifies that the design event for temporary drainage works to convey
waters to the sediment basin and around disturbance areas is a 1 in 10 year ARI event plus 150mm freeboard for > 24
months disturbance. Design has been undertaken to ensure this criteria is satisfied, with an additional assessment of the
1 % AEP (100 year ARI) undertaken as a sensitivity analysis on flow depth within the drains.

The peak flow rates for locations within the drains are detailed below in Table 3.

Table 3 – Peak Flow Rates & Velocities


                                       PEAK FLOW (M3/S) – UPSTREAM OF NODE                          MAX. VELOCITY (M/S) – UPSTREAM OF NODE

           LOCATION

                                              10% AEP                           1% AEP                       10% AEP          1% AEP


                 CH0                               -                                -                              -             -

               CH100                            1.443                            2.470                           0.766        0.906

               CH132                            1.442                            2.465                           1.245         1.464

               CH282                             1.418                            2.412                          0.762        0.885

               CH430                            1.955                             3.316                          0.831         0.976

               CH523                            1.950                            3.306                           1.394         1.635

               CH558                            3.404                            5.739                           1.187         1.394

               CH623                            3.499                            5.902                           1.797         2.101

               CH668                            3.498                            5.900                           1.435         1.687

               CH716                            3.472                            5.858                           0.796        0.940

            HES DWD                                -                                -                              -             -

            Doser Inlet                         1.530                             1.915                          0.774         0.910

              Forebay                           1.530                             1.916                          3.856        4.448




Environment. Engineering. Education.                                                                                                   PAGE 5

Page 30

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN



5.4.                PEAK FLOW DEPTHS

An assessment of depth within the clean water and dirty water drains is detailed below in Table 4.

Table 4 – Depth Assessment

                                                                        10 % AEP                                          1 % AEP
                                       INVERT LEVEL
              NODE                                    PEAK WATER LEVEL                  DEPTH               PEAK WATER LEVEL        DEPTH
                                         (m AHD)
                                                          (m AHD)                        (M)                    (m AHD)              (M)

               CH0                        25.263              25.683                     0.420                   25.812             0.549

              CH100                       24.563              24.830                     0.267                   24.920             0.357

              CH132                       23.636              24.028                     0.392                   24.154             0.518

             CH282                        22.631              23.127                     0.496                   23.273             0.642

             CH430                        21.550              21.843                     0.293                   21.939             0.389

             CH523                        18.100              18.664                     0.564                   18.823             0.723

             CH558                        17.749               18.172                    0.423                   18.299             0.550

             CH623                        15.350              15.705                     0.355                   15.825             0.475

             CH668                        14.210              14.747                     0.537                   14.920             0.710

              CH716                       14.000              14.565                     0.565                   14.733             0.733

           HES DWD                        21.600               22.115                     0.515                  22.257             0.657

          Doser Inlet                     21.000              21.304                     0.304                   21.396             0.396

            Forebay                       20.700              21.000                     0.300                   21.100             0.400


Calculations for rock sizing, weir sizing and rock dissipaters are provided in Appendix B.




Environment. Engineering. Education.                                                                                                        PAGE 6

Page 31

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN



6                 OPERATION & MAINTENANCE
The SW5 High Efficiency Sediment (HES) basin is to have both dosing and monitoring systems installed.

6.1.                DOSING SYSTEM

The dosing system will read real time flow rates and dose the applicable volume of the Coagulant/Flocculant into the
inflow stream as it passes the dosing point. The data collected is to be sent to a cloud-based data platform for storage
and future interrogation.
Maintenance and operation of the dosing system is to be detailed by the dosing system supplier.

6.2.                MONITORING SYSTEM

The monitoring system will read real time water quality parameters such as:
              •      Turbidity,
              •      pH,
              •      Electrical Conductivity, and
              •      Dissolved Oxygen.
The monitoring system is to also control a power actuated valve on the outlet to the basin. When the water quality
readings are outside the site’s environmental approval conditions the valve will close, stopping any potential outflows
from occurring.
All data collected from the monitoring and shut-off valve is to be sent to a cloud-based data platform for storage and
future interrogation.
Maintenance and operation of the monitoring system is to be detailed by the monitoring system supplier.




Figure 2 – Typical Dosing and Monitoring Setup (Source: Turbid)

6.3.                SEDIMENT BASIN

6.3.1.            FOREBAY
The Forebay will require clean out periodically. Access into the ramp can be gained from the defined access track.
Dewatering into the main cell is recommended if the forebay is to be drained to remove sediment. A sump has been
located in the north western corner of the forebay to assist in desilting. Desilting is recommended to be undertaken once
accumulation is causing large resuspension with inflows. This may be at approximately 50% full.



Environment. Engineering. Education.                                                                              PAGE 7

Page 32

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN



Desilting is not a requirement from a compliance point, with the forebay acting as a mixing mechanism rather than a
storage or treatment volume.

6.3.2.           MAIN CELL
The main cell has a defined sediment storage volume between RL 18.30 and RL 18.60. A sump has been located in the
northern corner of the main cell to assist in desilting. Desilting is recommended to be undertaken once accumulation is
50% of the sediment storage zone. A marker post is to be installed to monitor the depth of sediment accumulation.

6.3.3.           EQUIPMENT FOR CLEAN-OUT
The concrete specification has been designed based on access via a rubber wheel/tracked Posi-track. The concrete ramps
and floor of the basin are not to be accessed by larger equipment which may exceed the design loadings.

6.4.                DESIGN EVENT & COMPLIANCE

The sediment basin has been sized as a Type A sediment basin with a design event of a 1 year ARI 24 hour storm event
equating to 136mm in 24 hours. If this event is exceeded, it is expected that outflows may exceed the EA requirements.
For events under the nominated design event, outflows are to be in accordance with the EA requirements. Where the
sediment basin is not adhering to the water quality requirements, interrogation of dosing and monitoring data should
be undertaken or advice sought from a specialist.

Table 5 – WT2 EA water quality requirements for controlled releases


               PARAMETER                          RELEASE LIMIT                                       COMMENTS


                       pH                             6.5 -9 .0                     Real-Time included on Monitoring Station

         Specific Conductance                      < 1500 uS/cm                     Real-Time included on Monitoring Station

           Dissolved Oxygen                          > 6 mg/L                       Real-Time included on Monitoring Station

   Total & Dissolved Aluminium                           N/A                               Sampling to be manual by NSC

            Suspended Solids                            < 50                       Cannot measure in the field. Correlation with
                                                                                  Turbidity to be gained by > 5 sampling events
                                                                                        during initial releases from basin.

                  Turbidity                         Correlation                    Correlation to be undertaken if not currently
                                                                                                       used




Environment. Engineering. Education.                                                                                               PAGE 8

Page 33

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN




APPENDIX A – CATCHMENTS & STAGING




Environment. Engineering. Education.                                                                             PAGE 9

Page 34

                                                                                                                                                                                                                                                  LEGEND

                                                                                                                                                                                                                                                                     EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                     CATCHMENT BOUNDARY


                                                                                                                                                                                                                                                           1         CATCHMENT LABEL


                                                                                                                                                                                                                                                                     FLOW DIRECTION


                                                                      BIO                                                                                                                                                                                            FLOWPATH


                                                                                                                                                                                                                                                                     PROPERTY BOUNDARY




                                  OFFICE
                                  POND                                                                     SW4




                                                                                            SW4                                    BYPASS -
                                                                                                                                    STABLE




                                                       CLEAN -
                                                                                                              HES
                                                      INTERNAL
                                                                                                             BASIN




                                                                                                                     CELL 2.2 TO
                                            CLEAN -                                                                  LEACHATE
                                           EXTERNAL




                                                                                                                                                                SW5




                                                                                                                                                                                   CLIENT                                                  PROJECT
   D       CELL NUMBER REVISION                           KR        20/09/21     0                    80                                                 COPYRIGHT C                               NOOSA SHIRE COUNCIL                      NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
   C       FINAL DESIGN REPORT                            KR        03/06/21                                                                         TOPO GROUP PTY LTD
                                                                                                                                                                                   DRAWN                   DESIGNED      DATE              DRAWING TITLE
   B       NEW ATC DESIGN                                 KR        12/04/21
                                                                                       SCALE 1:4000                                           THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR          31/03/21                       CONCEPT STORMWATER STAGING
                                                                                                                     ISSUED FOR USE           TRANSMITTED IN ANY FORM OR BY ANY
   A       ORIGINAL ISSUE                                 KR        31/03/21                                                                  MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                   RPEQ / SIGNATURE (IF REQUIRED)                                                OVERALL CATCHMENT PLAN
                                                                               NORTH
                                                                                                      A3                                      THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954                  PROJECT No                   DRAWING No          REVISION
REVISION   DESCRIPTION                                APPROVED BY   DATE                                                                                    PTY LTD.                                                                                       20-0211            CONCEPT-01         D

Page 35

                                                                                                                                                                                                                                                       LEGEND

                                                                                                                                                                                                                                                                               EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                               CATCHMENT TO BASIN


                                                                                                                                                                                                                                                                               CATCHMENT TO CWD


                                                                                                                                                                                                                                                               1               CATCHMENT LABEL


                                                                                                                                                                                                                                                                               FLOW DIRECTION

                                                                                                                                                                                                                                                                               EXISTING FLOWPATH

                                                                                                                                                                                                                                                                               CLEAN WATER DRAIN

                                                                                                                                                                                                                                                                               DIRTY WATER DRAIN

                                                                                                                                                                                                                                                                               PROPERTY BOUNDARY


                                                                                                                                    BATTER FROM EXISTING CELL                                                                                                                  ACTIVE AREA
                                                                                                                                    LIKELY TO ENTER CELL 2.2
                                                                                                                                                                                                                                                                               AREA TO BE STABILISED




                                                                                                                                          CELL 2.2 DIRECTED TO LEACHATE UNTIL AREAS CAN
                                                                                                                                          GRADE OUT (LIKELY CROSS-OVER WITH EXPANSION
                                                                                                                                          AS SHOWN IN STAGE 2)




                                                                                                                                                                                             REGRADING OF AREA OR TEMPORARY
                                                                                                                                                                                             BUNDS / DRAINS REQUIRED TO GRADE
                                                                                                                                                                                             RUNOFF TO SEIDMENT BASIN INLET




                                                                                                                                                                           FINAL / TEMPORARY DRAINAGE                                                                                             PROPOSED SEDIMENT BASIN
             PORTION OF CATCHMENT NOT LIKELY TO ENTER                                                                                                                      REQUIRED TO GRADE RUNOFF TO BASIN
             CLEAN WATER DRAIN . AREA HAS BEEN ASSUMED TO
             ENTER DRAIN TO BE CONSERVATIVE FOR DRAIN SIZING
                                                                        STOCKPILE COULD REMAIN AND CLEAN WATER
                                                                        DRAIN CONTINUED ONCE STOCKPILE IS                                                                                                                                                                          CATCHMENT TO BASIN - 3.2 HA
                                                                        REMOVED. CATCHMENTS TO CLEAN WATER
                                                                        DRAIN AND BASIN ARE ASSUMED WORST CASE
                                                                                                                                                                                                                                                               INLET TO BASIN RL 21.1


                                                                                                                                                                                                                                     CLEAN WATER DRAIN




                                                                                                                                                                                                                                                                        CATCHMENT TO DRAIN - 3.6 HA
                                                                                                                                                                                                                                                                        (EXCLUDING OVERTOP FROM BASIN)
                                                                                                                                                                                             CLIENT                                                  PROJECT
   D       CELL NUMBER REVISION                                    KR            20/09/21          0                    40                                          COPYRIGHT C                              NOOSA SHIRE COUNCIL                      NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
   C       FINAL DESIGN REPORT                                     KR            03/06/21                                                                       TOPO GROUP PTY LTD
                                                                                                                                                                                             DRAWN                   DESIGNED      DATE              DRAWING TITLE
   B       NEW ATC DESIGN                                          KR            12/04/21
                                                                                                         SCALE 1:2000                                   THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR          31/03/21                    STORMWATER MANAGEMENT - SOUTH
                                                                                                                             ISSUED FOR USE             TRANSMITTED IN ANY FORM OR BY ANY
   A       ORIGINAL ISSUE                                          KR            31/03/21                                                               MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                             RPEQ / SIGNATURE (IF REQUIRED)                                                      STAGE 1
                                                                                                 NORTH
                                                                                                                        A3                              THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954                  PROJECT No                      DRAWING No                   REVISION
REVISION   DESCRIPTION                                         APPROVED BY       DATE                                                                                 PTY LTD.                                                                                       20-0211               CONCEPT-02                  D

Page 36

                                                                                                                                                                                                                                                   LEGEND

                                                                                                                                                                                                                                                                           EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                           CATCHMENT TO BASIN


                                                                                                                                                                                                                                                                           CATCHMENT TO CWD


                                                                                                                                                                                                                                                           1               CATCHMENT LABEL


                                                                                                                                                                                                                                                                           FLOW DIRECTION

                                                                                                                                                                                                                                                                           EXISTING FLOWPATH

                                                                                                                                                                                                                                                                           CLEAN WATER DRAIN

                                                                                                                                                                                                                                                                           DIRTY WATER DRAIN

                                                                                                                                                                                                                                                                           PROPERTY BOUNDARY


                                                                                                                                    BATTER FROM EXISTING CELL                                                                                                              ACTIVE AREA
                                                                                                                                    LIKELY TO ENTER CELL 2.2
                                                                                                                                                                                                                                                                           AREA TO BE STABILISED




                                                                                                                                          CELL 1.1 AND 2.2 TO BE EXPANDED. UNTIL WASTE IS
                                                                                                                                          ABOVE SURROUNDING GROUND LEVEL, CAPTURED
                                                                                                                                          RUNOFF TO BE PUMPED TO LEACHATE TANKS




                                                                                                                                                                                             REGRADING OF AREA OR TEMPORARY
                                                                                                                                                                                             BUNDS / DRAINS REQUIRED TO GRADE
                                                                                                                                                                                             RUNOFF TO SEIDMENT BASIN INLET




                                                                                                                                                                            FINAL / TEMPORARY DRAINAGE                                                                                        PROPOSED SEDIMENT BASIN
             PORTION OF CATCHMENT NOT LIKELY TO ENTER                                                                                                                       REQUIRED TO GRADE RUNOFF TO BASIN
             CLEAN WATER DRAIN . AREA HAS BEEN ASSUMED TO
             ENTER DRAIN TO BE CONSERVATIVE FOR DRAIN SIZING
                                                                        STOCKPILE COULD REMAIN AND CLEAN WATER
                                                                        DRAIN CONTINUED ONCE STOCKPILE IS                                                                                                                                                                      CATCHMENT TO BASIN - 4.0 HA
                                                                        REMOVED. CATCHMENTS TO CLEAN WATER
                                                                        DRAIN AND BASIN ARE ASSUMED WORST CASE
                                                                                                                                                                                                                                                           INLET TO BASIN RL 21.1


                                                                                                                                                                                                                                     CLEAN WATER DRAIN




                                                                                                                                                                                                                                                                    CATCHMENT TO DRAIN - 3.6 HA
                                                                                                                                                                                                                                                                    (EXCLUDING OVERTOP FROM BASIN)
                                                                                                                                                                                             CLIENT                                              PROJECT
   D       CELL NUMBER REVISION                                    KR            20/09/21          0                    40                                          COPYRIGHT C                              NOOSA SHIRE COUNCIL                  NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
   C       FINAL DESIGN REPORT                                     KR            03/06/21                                                                       TOPO GROUP PTY LTD
                                                                                                                                                                                             DRAWN                   DESIGNED      DATE          DRAWING TITLE
   B       NEW ATC DESIGN                                          KR            12/04/21
                                                                                                         SCALE 1:2000                                   THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      31/03/21                    STORMWATER MANAGEMENT - SOUTH
                                                                                                                             ISSUED FOR USE             TRANSMITTED IN ANY FORM OR BY ANY
   A       ORIGINAL ISSUE                                          KR            31/03/21                                                               MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                             RPEQ / SIGNATURE (IF REQUIRED)                                                  STAGE 2
                                                                                                 NORTH
                                                                                                                        A3                              THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954              PROJECT No                      DRAWING No                   REVISION
REVISION   DESCRIPTION                                         APPROVED BY       DATE                                                                                 PTY LTD.                                                                                   20-0211               CONCEPT-03                  D

Page 37

                                                                                                                                                                                                                                                      LEGEND

                                                                                                                                                                                                                                                                              EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                              CATCHMENT TO BASIN


                                                                                                                                                                                                                                                                              CATCHMENT TO CWD


                                                                                                                                                                                                                                                              1               CATCHMENT LABEL


                                                                                                                                                                                                                                                                              FLOW DIRECTION

                                                                                                                                                                                                                                                                              EXISTING FLOWPATH
                                                                                                                                                                                           CELL 3.2 & 3.3 BEING CONSTRUCTED AND SELF
                                                                                                                                                                                           CONTAINED (NO FLOW TO BASIN). CAPTURED
                                                                                                                                                                                           RUNOFF CAN BE PUMPED TO HES BASIN                                                  CLEAN WATER DRAIN

                                                                                                                                                                                                                                                                              DIRTY WATER DRAIN

                                                                                                                                                                                                                                                                              PROPERTY BOUNDARY

                                                                                                                                                                                                                                                                              ACTIVE AREA

                                                                                                                                                                                                                                                                              AREA TO BE STABILISED




                                                                                                                                         CELL 1.1 AND 2.2 TO
                                                                                                                                                          CAPACITY
                                                                                                                                                             BE EXPANDED.
                                                                                                                                                                   REACHEDUNTIL WASTE IS
                                                                                                                                         AND BEING
                                                                                                                                         ABOVE  SURROUNDING
                                                                                                                                                    CAPPED ANDGROUND
                                                                                                                                                                 LANDSCAPED
                                                                                                                                                                       LEVEL, CAPTURED
                                                                                                                                         RUNOFF TO BE PUMPED TO LEACHATE TANKS




                                                                                                                                                                           FINAL / TEMPORARY DRAINAGE                                                                                            PROPOSED SEDIMENT BASIN
             PORTION OF CATCHMENT NOT LIKELY TO ENTER                                                                                                                      REQUIRED TO GRADE RUNOFF TO BASIN
             CLEAN WATER DRAIN . AREA HAS BEEN ASSUMED TO
             ENTER DRAIN TO BE CONSERVATIVE FOR DRAIN SIZING
                                                                        STOCKPILE COULD REMAIN AND CLEAN WATER
                                                                        DRAIN CONTINUED ONCE STOCKPILE IS                                                                                                                                                                         CATCHMENT TO BASIN - 3.2 HA
                                                                        REMOVED. CATCHMENTS TO CLEAN WATER
                                                                        DRAIN AND BASIN ARE ASSUMED WORST CASE
                                                                                                                                                                                                                                                              INLET TO BASIN RL 21.1


                                                                                                                                                                                                                                        CLEAN WATER DRAIN




                                                                                                                                                                                                                                                                       CATCHMENT TO DRAIN - 3.6 HA
                                                                                                                                                                                                                                                                       (EXCLUDING OVERTOP FROM BASIN)
                                                                                                                                                                                                CLIENT                                              PROJECT
   D       CELL NUMBER REVISION                                    KR            20/09/21          0                    40                                         COPYRIGHT C                                  NOOSA SHIRE COUNCIL                  NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
   C       FINAL DESIGN REPORT                                     KR            03/06/21                                                                      TOPO GROUP PTY LTD
                                                                                                                                                                                                DRAWN                   DESIGNED      DATE          DRAWING TITLE
   B       NEW ATC DESIGN                                          KR            12/04/21
                                                                                                         SCALE 1:2000                                  THIS DOCUMENT MAY NOT BE COPIED OR                KR                      KR      31/03/21                    STORMWATER MANAGEMENT - SOUTH
                                                                                                                             ISSUED FOR USE            TRANSMITTED IN ANY FORM OR BY ANY
   A       ORIGINAL ISSUE                                          KR            31/03/21                                                              MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                RPEQ / SIGNATURE (IF REQUIRED)                                                  STAGE 3
                                                                                                 NORTH
                                                                                                                        A3                             THE WRITTEN CONSENT OF TOPO GROUP                    CPESC - 5395, RPEQ - 15954              PROJECT No                      DRAWING No                   REVISION
REVISION   DESCRIPTION                                         APPROVED BY       DATE                                                                                PTY LTD.                                                                                       20-0211               CONCEPT-04                  D

Page 38

                                                                                                                                                                                                                    LEGEND

                                                                                                                                                                                                                                            EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                            CATCHMENT TO BASIN


                                                                                                                                                                                                                                            CATCHMENT TO CWD


                                                                                                                                                                                                                            1               CATCHMENT LABEL


                                                                                                                                                                                                                                            FLOW DIRECTION

                                                                                                                                                                                                                                            EXISTING FLOWPATH
                                                                                                                                                         CELL 3.2 & 3.3 SPLIT INTO QUADRANTS.
                                                                                                                                                         ONCE FLOW CAN BE CONVEYED TO BASIN
                                                                                                                                                         A MAXIMUM OF TWO QUADRANTS                                                         CLEAN WATER DRAIN
                                                                                                                                                         CONVEYED TO BASIN. OTHER QUADRANTS
                                                                                                                                                         CAPTURED OR DIRECTED TO CLEAN                                                      DIRTY WATER DRAIN
                                                                                                                                                         WATER DRAINS - TO BE DETERMINED
                                                                                                                                                         THROUGH CELL 3.2 & 3.3 DETAILED DESIGN
                                                                                                                                                                                                                                            PROPERTY BOUNDARY

                                                                                                                                                                                                                                            ACTIVE AREA

                                                                                                                                                                                                                                            AREA TO BE STABILISED




                                                                                                           CELL 1.1 AND 2.2 EXPANSION AREAS STABILISED
                                                                                                           AND DIRECTED TO CLEAN WATER DRAIN




                                                                                                                                                      NEW DIRTY WATER DRAIN
                                                                                                                                                      TO CONVEY ACTIVE RUNOFF
                                                                                                                                                      TO SEDIMENT BASIN




                                           TIEING IN CLEAN WATER DRAIN BATTER WITH
                                           CELL TRACK OR GRADING TRACK DRAIN INTO
                                           CLEAN WATER DRAIN WILL BE REQUIRED                                                                                                                                                                                  PROPOSED SEDIMENT BASIN




                                                                                                                                                                                                                                                CATCHMENT TO BASIN - 4.5 HA


                                                                                                                                                                                                                            INLET TO BASIN RL 21.1


                                                                                                                                                                                                      CLEAN WATER DRAIN




                                                                                                                                                                                                                                     CATCHMENT TO DRAIN - 6.2 HA
                                                                                                                                                                                                                                     (EXCLUDING OVERTOP FROM BASIN)
                                                                                                                                                              CLIENT                                              PROJECT
   D       CELL NUMBER REVISION       KR         20/09/21            0                    40                                         COPYRIGHT C                              NOOSA SHIRE COUNCIL                  NOOSA LANDFILL STORMWATER MANAGEMENT PLAN
   C       FINAL DESIGN REPORT        KR         03/06/21                                                                        TOPO GROUP PTY LTD
                                                                                                                                                              DRAWN                   DESIGNED      DATE          DRAWING TITLE
   B       NEW ATC DESIGN             KR         12/04/21
                                                                           SCALE 1:2000                                  THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      31/03/21                    STORMWATER MANAGEMENT - SOUTH
                                                                                               ISSUED FOR USE            TRANSMITTED IN ANY FORM OR BY ANY
   A       ORIGINAL ISSUE             KR         31/03/21                                                                MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                              RPEQ / SIGNATURE (IF REQUIRED)                                                  STAGE 4
                                                                   NORTH
                                                                                          A3                             THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954              PROJECT No                      DRAWING No                   REVISION
REVISION   DESCRIPTION            APPROVED BY     DATE                                                                                 PTY LTD.                                                                                   20-0211               CONCEPT-05                  D

Page 39

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN




APPENDIX B1 – BASIN CALCULATIONS




Environment. Engineering. Education.                                                                             PAGE 10

Page 40

R1767: NOOSA LANDFILL: CLEAN WATER DRAIN AND HES BASIN (SW5) – DESIGN REPORT & MAINTENANCE AND INSPECTION PLAN



1 YEAR ARI 24 HOUR TYPE A SEDIMENT BASIN

                                                                                                                                                                                                                                                                                            NUMBER
                                                                                                                  JAR TEST
                                                                       SETTLING                                                                                                                                                                          DECANT           DECANT               OF
                        CATCH                                                          DESIGN                      SETTLE          QA                QA        MINIMUM       MINIMUM                         ACTUAL                                                                                       EMPTY         FULL
                                       BATTERS          L:W             DEPTH                      IX yr, 24 hr                                                                               GOVERN                          DFW      MANUAL            NUMBER            HOLE             DECANTS
  BASIN ID               AREA                                                          EVENT                      AFTER 15     OPTIMUM           SELECTED         Vs            As                             VS                                                                                         SCOUR        SCOUR
                                        (1 IN X)       RATIO               DS                     (mm/hr)                                                                                     FACTOR                          (m)      DFW (m)             OF            DIAMETER           REQUIRED
                         (HA)                                                           (ARI)                     MINUTES       (L/s/ha)          (L/s/ha)       (m3)          (m2)                           (m3)                                                                                        CHECK        CHECK
                                                                          (m)                                                                                                                                                                             HOLES            (mm)              FOR QA
                                                                                                                    (mm)
                                                                                                                                                                                                                                                                                            SELECTED


  SW5                     4.5             2                 3            1.20            1           5.68            100             17             9            1662            486          VOLUME          1662            0.20           0.50             200             17              3.1          OK            OK




LEVEL SPREADER

                                                                                                                                                                                                                                                             WEIR




                                                                                                                                                                                                                                                                                            MIN. HEIGHT
                                                   CATCH AREA                                                           TIME OF CONC                                    FLOW - Q                                  SIDE SLOPE 1         U/S WATER                                                                  TOP WIDTH
  BASIN ID                                                                       ARI                  CARI                                           IARI                                BASE WIDTH                                                             FREEBOARD (m)               SPILLWAY TO
                                                      (HA)                                                                 (MINS)                                         (m3/s)                                     (1 in x)           LEVEL (m)                                                                    (m)
                                                                                                                                                                                                                                                                                              TOB (m)




  LEVEL SPREADER Q10                                   4.5                        10                   0.7                    15                    152                   1.33                  16                     2                      0.13                      0.3                    0.43                 17.73

  LEVEL SPREADER Q100                                  4.5                       100                  0.84                    15                     217                  2.28                  16                     2                      0.19                      0.3                    0.49                 17.96




EMERGENCY SPILLWAY

                                                                                                                                          WEIR                                                                             CHUTE                                                                    DISSIPATER



                                                                                                                   SIDE                                        MIN.                                                                                                                MEAN
                                                                 TIME                                                         U/S                                                                                                                    DEPTH           DEPTH
                         CATCH                                                           FLOW                     SLOPE                                       HEIGHT        TOP        LONG.           ROCK          MANNING         DESIGN                                        ROCK       WIDTH
                                                                  OF                              BASE                       WATER        FREEBOARD                                                                                                    OF             WITH                                WIDTH       LENGTH
  BASIN ID                AREA          ARI          CARI                       IARI      -Q                         1                                       SPILLWAY      WIDTH       SLOPE         SIZE - D50       ROUGH            VEL                                         SIZE -       1
                                                                 CONC                             WIDTH                      LEVEL            (m)                                                                                                    FLOW           F/BOARD                               2 (m)         (m)
                          (HA)                                                           (m3/s)                    (1 in                                      TO TOB        (m)        (m/m)           (mm)            COEFF          (m/s)                                         D50        (m)
                                                                (MINS)                                                        (m)                                                                                                                     (m)              (m)
                                                                                                                    x)                                          (m)                                                                                                                (mm)



  SPILLWAY Q100             4.5         100          0.7          15            217       1.90        15            2         0.17           0.3               0.47         16.90      0.25             93            0.087           1.24            0.10           0.40           100         17.2       17.4          2.1




Environment. Engineering. Education.                                                                                                                                                                                                                                                                                PAGE 11

Page 41

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN




APPENDIX C
RRA (SW2) CONCEPT DESIGN REPORT – HES BASIN AND DRAINAGE




Environment. Engineering. Education.                                 PAGE C

Page 42

                              CONCEPT DESIGN REPORT –
                              HES BASIN AND DRAINAGE
                                  NOOSA LANDFILL - RRA




CLIENT: NOOSA SHIRE COUNCIL

DOCUMENT NUMBER: R3341

VERSION: A

DATE: 29/04/24

Page 43

R3341: NOOSA LANDFILL: RRA CONCEPT HES BASIN AND DRAINAGE DESIGN REPORT




TABLE OF CONTENTS

1       INTRODUCTION                                                      1
2       CATCHMENT TO BASIN                                                1
3       DRAINAGE DESIGN                                                   1
        3.1. DIVERSION DRAIN TO BASIN                                     1
4       SEDIMENT BASIN SIZING AND DETAILS                                 1
        4.1. SEDIMENT BASIN SIZE                                          1
        4.2. SEDIMENT BASIN OUTLET                                        1
APPENDIX A – CATCHMENTS                                                   3
APPENDIX B – BASIN CALCULATIONS                                           4
APPENDIX C – CONCEPT BASIN DESIGN                                         6




Environment. Engineering. Education                                           PAGE ii

Page 44

R3341: NOOSA LANDFILL: RRA CONCEPT HES BASIN AND DRAINAGE DESIGN REPORT



1                INTRODUCTION
This concept design report applies to the proposed construction of the RRA High-Efficiency Sediment (HES) Basin located
near the SW2 discharge point. This design report has been provided to detail catchments, and conceptual basin and
drainage sizing and locations.

2                CATCHMENT TO BASIN
The maximum catchment assumed to drain to the sediment basin is 7.83 hectares.

Details on the contributing catchment to the basin is provided in Appendix A.

3                DRAINAGE DESIGN
3.1.                DIVERSION DRAIN TO BASIN

The diversion drain to the basin has been sized for the 1 in 10 year ARI critical storm event in accordance with the
Guideline - Stormwater and environmentally relevant activities (DES, 2019). The Environmental Authority (EPPR01855314)
also specifies that the design event for temporary drainage works to convey waters to the sediment basin and around
disturbance areas is a 1 in 10 year ARI event plus 150mm freeboard for > 24 months disturbance.
Conceptual drain sizing is provided in Appendix A.
In addition to the 1 in 10 year ARI (10% AEP) drain sizing, conceptual drain sizing for a 100 year ARI (1% AEP) has also
been provided.

4                SEDIMENT BASIN SIZING AND DETAILS
4.1.                SEDIMENT BASIN SIZE

The Environmental Authority (EPPR01855314) specifies that site erosion protection measures and sediment control
measure must be implemented to have the hydraulic effectiveness to treat stormwater for 90% of the annual runoff for
each stormwater catchment.

A design report (Ref: R1767) and HES basin assessment was undertaken in conjunction with the SW5 HES basin design.
The assessment determined a 1 in 1 year ARI Type A basin will exceed the performance of a 10 year 24 hour traditional
sediment basin and also achieve the 90% requirement of annual runoff treatment specified in the Environmental
Authority.

The RRA HES basin was sized in accordance with this assessment with calculations provided in Appendix B with a
Concept design provided in Appendix C.

Noosa Shire Council also requested sediment basin sizes be provided for a 20 year, 50 year and 100 year ARI. The basin
size provided is for the 1 year ARI as detailed above, with the indicative increase in volume for the other storm events
provided below. It should be noted that water quality treatment for a 100 year ARI storm event is very extreme with such
events exceeding drain capacities and also likely to have site wide flooding impacts from local and regional drainage
paths.

       +      1 year ARI ~ 2,900m3 Settling Zone
       +      20 year ARI ~ 19,000m3 Settling Zone
       +      50 year ARI ~ 28,000m3 Settling Zone
       +      100 year ARI ~ 36,000m3 Settling Zone

4.2.                SEDIMENT BASIN OUTLET

The outlet of the sediment basin has been determined to be:

       +      Piped Outlet from Decant (RL 11.80 USIL, RL 11.56 DSIL)
       +      Emergency Spillway (RL 12.80)

The outlet levels were determined in conjunction with NSC to ensure the piped outlet would be above the downstream
levels and the Emergency spillway was above the 100 year ARI flood event of RL 12.64 (Noosa Landfill RRA Flood
Assessment, Hydrology & Water 2022). Due to the piped outlet being below the 1 year to 100 year ARI flood levels, a

Environment. Engineering. Education.                                                                             PAGE 1

Page 45

R3341: NOOSA LANDFILL: RRA CONCEPT HES BASIN AND DRAINAGE DESIGN REPORT



frog flap will be required to ensure no backflows. When flood levels rise, the HES basin will still perform with the pipe
blocked with overtops occurring from the emergency spillway as required. As flood levels recede, flows can occur from
the piped outlet.




Environment. Engineering. Education.                                                                              PAGE 2

Page 46

R3341: NOOSA LANDFILL: RRA CONCEPT HES BASIN AND DRAINAGE DESIGN REPORT




APPENDIX A2 – CATCHMENTS




Environment. Engineering. Education.                                      PAGE 3

Page 47

                                           CONCEPT
                                       EROSION      DRAINAGECONTROL
                                               AND SEDIMENT  & CATCHMENTS
                                                                     DRAWINGS
                                             NOOSA LANDFILL - RRA BASIN

                                                                            SITE LOCATION




                                                                                                                                           DRAWING LIST:
                                                                                                                                           D00 - COVER SHEET
                                                                                                                                           D01 - CATCHMENT PLAN
                                                                                                                                           D02 - CONCEPT DRAINAGE - SHEET 1 OF 2
                                                                                                                                           D03 - CONCEPT DRAINAGE - SHEET 2 OF 2
                                                                                                                                           D04 - DRAINAGE CALCULATIONS AND TYPICAL SECTIONS




                                                                                                                                                  CLIENT                                              PROJECT
                                                                                                                        COPYRIGHT C                                    NOOSA COUNCIL                                    NOOSA LANDFILL - RRA BASIN
                                                                                                                    TOPO GROUP PTY LTD
                                                                                                                                                  DRAWN                   DESIGNED      DATE          DRAWING TITLE
   B       REVISION FOLLOWING CLIENT COMMENTS       KR        29/04/24
                                                                                            ISSUED FOR USE
                                                                                                             THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      16/04/24                    CONCEPT DRAINAGE AND BASIN
                                                                                                             TRANSMITTED IN ANY FORM OR BY ANY
   A       ORIGINAL ISSUE                           KR        16/04/24                                       MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                  RPEQ / SIGNATURE (IF REQUIRED)                                             COVER SHEET
                                                                                      A3                     THE WRITTEN CONSENT OF TOPO GROUP                                                        PROJECT No                 DRAWING No          REVISION
REVISION   DESCRIPTION                          APPROVED BY   DATE
                                                                         NORTH
                                                                                                                           PTY LTD.                            CPESC - 5395, RPEQ - 15954                          24-0078-C                  D00         B

Page 48

LEGEND:
             CATCHMENT BOUNDARY

             CLEAN WATER DRAIN

             DIRTY WATER DRAIN

             CULVERT                                  9726




CATCHMENT 1 - 6.16 HA                                                      9724




                                                                                                       9725




CATCHMENT 2 - 1.04 HA

CATCHMENT 3 - 0.13 HA

CATCHMENT 4 - 0.50 HA

TOTAL - 7.83 HA                                                                                                      9728
                                                                                                                                                              1                                                                                             RL 13.76 AT HEADWALL


                                                                                                9729




                                                                                                                                                                                                              9600




                                                                                                                                                                             RL 13.51 AT HEADWALL

                                                                    9731
                                                                    9730




                                                                                                                                                                                                                                                        2



                                                                                  9720




                                                                                                                                                                                                                                                                          9734
                                                                                                                                                                                                                                                                                                                   DRAINAGE TO BE MODIFIED TO DIVERT
                                                                                                              9722
                                                                                                                                                                                                                                                                                                                   RUNOFF TO CLEAN WATER DRAIN

                                                                                         9721




                                                             9604
                                                             9700




                                                                                                                                                                                                              NEW DRAIN AND PIPE TO TAKE                                                                                             AREA TO BE STABILISED
                                                                                                                                                                                                              PAD RUNOFF AND ALLOW
                                                                                                                                                                                                                            9000




                                                                                                                                                                                                                                                                                                                                     AND BYPASSED TO
                                                                                                                                                                                                              OTHER RUNOFF TO BYPASS                                                                                                 CLEAN WATER DRAIN


                                                                                                                                                                                                                                                                                     3


                                                                                                                                                                                                                                                  4




                                                                                                                                                                                 TOP PAD ESTIMATED AT 5,000m2 MAXIMUM




                                                                                                                                                                                                                                                               CLIENT                                                PROJECT
                                                                                                                                                       0                    50                                                         COPYRIGHT C                                   NOOSA COUNCIL                                     NOOSA LANDFILL - RRA BASIN
                                                                                                                                                                                                                                   TOPO GROUP PTY LTD
                                                                                                                                                                                                                                                               DRAWN                     DESIGNED    DATE            DRAWING TITLE

                             B       REVISION FOLLOWING CLIENT COMMENTS                                                         KR        29/04/24           SCALE 1:2500                                               THIS DOCUMENT MAY NOT BE COPIED OR              KR                      KR      16/04/24                      CONCEPT DRAINAGE AND BASIN
                                                                                                                                                                                             ISSUED FOR USE             TRANSMITTED IN ANY FORM OR BY ANY
                             A       ORIGINAL ISSUE                                                                             KR        16/04/24                                                                      MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                                                                               RPEQ / SIGNATURE (IF REQUIRED)                                              CATCHMENT PLAN
                                                                                                                                                                            A3                                          THE WRITTEN CONSENT OF TOPO GROUP                                                            PROJECT No                 DRAWING No          REVISION
                          REVISION   DESCRIPTION                                                                            APPROVED BY   DATE
                                                                                                                                                     NORTH
                                                                                                                                                                                                                                      PTY LTD.                                   CPESC - 5395, RPEQ - 15954                       24-0078-C                  D01         B

Page 49

                                                                                                                                                                                                                          FOREBAY LENGTH                                                                                   MAIN CELL LENGTH

LEGEND:                                                                                                                                                                                                                                                      LEVEL SPREADER
                                                                                                                                                                                                                                                                                                                                                             DECANT SKIMMER
                                                                                                                                                                                                                                                                                                    MAXIMUM                                                  FROM TOP OF
                                                                                                                                                                                                                          DRAIN INVERT MIN.                  CREST MIN. 0.2m
                                                                                                                                                                                                                                                                                                    WATER                                                    WATER COLUMN
                                                                                                                                                                                                                                                             ABOVE SPILLWAY                                                                                                                                             SPILLWAY CREST 12.80
           PAD FALL                                                                                                                                                                                                       0.2m ABOVE LEVEL
                                                                                                                                                                                                                          SPREADER                           CREST                                  LEVEL
                                                                                                                                                                                                                                                                                                                                                                                              0.3m (MIN)
                                                                                                                                                                                                     13.40        13.20                              13.00
   11.40   EXISTING LEVEL                                                                                                                                                                                                                                                                                                                                                                                                          HIGH FLOW
                                                                                                               FLOOD LEVELS PROVIDED BY NSC:                                                                                                                                                                                              FLOC SETTLING DEPTH (DF)                                                                 (OVER
                                                                                                                                                                                                                                                                                   SETTLING ZONE DEPTH (DS)     11.80 - 12.80                                                                                                      SPILLWAY)
                                                                                                               Q1 - 12.43
  11.42    PROPOSED LEVEL                                                                                      Q2 - 12.44                                                                                                                                                               FREE WATER ZONE (DFF)             11.40 - 11.80                                            DEPTH (D11.80
                                                                                                                                                                                                                                                                                                                                                                                            T)
                                                                                                                                                                                                                                                                                                                           SEDIMENT STORAGE DEPTH (DSS) 11.00 - 11.40                                                           11.56
                                                                                                               Q10 - 12.51
           CLEAN WATER DRAIN                                                                                   Q100 - 12.59                                                                                                                                                                                                                                                                        DECANT
                                                                                                                                                                                                                                                                                                                                                                                                                           LOW FLOW
                                                                                                                                                                                                                                                                                                                                                                                                   STRUCTURE
                                                                                                               Q100 CC - 12.64                                                                                                                                                                                                                                                                                             OUTLET


           DIRTY WATER DRAIN                                                                                                                                                                                                                                                   TYPE A SEDIMENT BASIN TYPICAL SECTION (nts)
                                                                                                                                          11.42

           PROPOSED BASIN                                                                PROPOSED OUTLET RL 11.56

                                                                                                                                                                                                                                                                                                     ALL DRAINS:
                                                                                                                                                                                                                                                                                                     - 10% AEP SIZE
                                                                                                                                                                   11.40                                                                                                                             - 0.5% LONG. FALL
                                                                                                                                                                                                                                                                                                     - CONCRETE LINED
                                                                                                PROPOSED SPILLWAY RL 12.80                                                                                                                                                                           - 1m BASE
                                                                                                                                                                                                                                                                                                     - 1 IN 2 SIDE SLOPES
                                       9726




                                                                                                                                    14.15 INVERT
                                                                                                                                    14.80 TOB
                                                                                                                                                                                                                                      13.40 INVERT
                                                                                                                                                                                                                                      14.40 TOB                                                         DW3
                                                                   9724
                                                                                                                                                                 11.60             DW2
                                                                                         9725




                                                                                                                                                                                                                                                                                                                                                                          14.25 INVERT
                                                                                                                                                                                                                                                                                                                                                                          14.70 TOB
                                                                                                                                                                                                                                                                                    13.60
                                                                                                                                                                                                         12.00    13.00                                                                                                                                                 14.10



                                                                                                                                                                                                                                                                                                                                                                                                              UPSTREAM DRAINAGE
                                                                                                                                                                                                                                                                                 0.5% FALL                                           14.00                        DW4                                         DIRECTED TO DW4
                                                                                                                                                                                                                                          13.60

                                                                                        EDGE DRAIN AT 0.1%                                                                                                                     15.00
                                                                                                                                                                                                                                                                                      14.00
                                                                                        GRADE TO LIMIT FILL
                                                                                                                                                                                                             PAD LEVELS ARE INDICATIVE ONLY AND WILL                                                                                                                                                        EXISTING DRAINAGE
                                                                                                                                                                                                             NEED TO BE REFINED WITH DETAILED DESIGN                                                                                            14.40                                                       TOO DEEP - NEED TO
                                                                                                                                                                                    0.5% FALL                                                                                                                                                                        14.60 INVERT
                                                                                                                                                                                                                                                                                                                                                                                                            RAISE DRAINAGE -
                                                                                                      9728




                                                                                                                          DW1                                                                                                                                                                                                                                        15.05 TOB
                                                                                                                                                                                                                                13.50                                                                                                                                                                       REFER TO SHEET 2



                                                                                 9729




                                                                                                                                                                                                                                             RIDGE                                                                                                    9600




                                                                                                                                                                                                                                        13.50

                                                                                                                                                                                                 13.70
                                                                                                                                                         14.25
                                                                                                                                                                                                                                                        14.10
                                                                                                                                                                                                                                          13.80
                                                            9731
                                                            9730




                                                                                                                                                                                                                  13.70



                                                                                                                                                                                  14.50
                                                                                                                                                                                                                                                             15.50

                                                                                                                                        14.35 INVERT
                                                                                                                                        14.70 TOB




                                                                          9720




                                                                                                                                                                                                                                                                                               CLIENT                                                                 PROJECT
                                                                                                                                                                         0                  30                                                                   COPYRIGHT C                                        NOOSA COUNCIL                                                         NOOSA LANDFILL - RRA BASIN
                                                                                                                                                                                                                                                             TOPO GROUP PTY LTD
                                                                                                                                                                                                                                                                                               DRAWN                   DESIGNED              DATE                     DRAWING TITLE

                               B       REVISION FOLLOWING CLIENT COMMENTS                                                          KR             29/04/24                   SCALE 1:1500                                                         THIS DOCUMENT MAY NOT BE COPIED OR                    KR                      KR              16/04/24                               CONCEPT DRAINAGE AND BASIN
                                                                                                                                                                                                                 ISSUED FOR USE                   TRANSMITTED IN ANY FORM OR BY ANY
                               A       ORIGINAL ISSUE                                                                              KR             16/04/24                                                                                        MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                                                                                                               RPEQ / SIGNATURE (IF REQUIRED)                                                         CONCEPT DRAINAGE - SHEET 1 OF 2
                                                                                                                                                                                            A3                                                    THE WRITTEN CONSENT OF TOPO GROUP                                                                                   PROJECT No                           DRAWING No                          REVISION
                            REVISION          DESCRIPTION                                                                     APPROVED BY         DATE
                                                                                                                                                                     NORTH
                                                                                                                                                                                                                                                                PTY LTD.                                    CPESC - 5395, RPEQ - 15954                                             24-0078-C                              D02                       B

Page 50

LEGEND:
           PAD FALL
                                                                                                           14.60 INVERT
                                                                                                           15.05 TOB
   11.40   EXISTING LEVEL

  11.42    PROPOSED LEVEL
                                                                                                                                                          IL 14.50
           CLEAN WATER DRAIN
                                                                                                                                                        15.60 INVERT
                                                                                                                      9600




                                                                                                     IL 14.61 TWIN 525 DIA.                             16.05 TOB
           DIRTY WATER DRAIN                                                                                                                            (TO GAIN COVER OVER PIPE)

           CULVERT                                                                                   ACCESS TRACK- 15.84




                                                                             ACCESS TRACK TO BE RAISED ALONG ENTIRE
                                                                             TRACK UNLESS CLEAN WATER CULVERT CAN BE
                                                                             ALTERED DUE TO COVER ISSUES. DIRTY WATER
                                                                                                                                                                     DW5          16.10 INVERT
                                                                             DRAIN RAISES 1m (CONCEPT DESIGN) DUE TO
                                                                                                                                                                                  16.50 TOB
                                                                             COVER REQUIREMENTS AND CURRENT DIRTY
                                                                             WATER PIPE BEING TOO LOW FOR PROPOSED BASIN                                                              SIGNIFICANT FILL TO TRACK
                                                                                                                                                                                      ALONG THIS SECTION
                                                                                                                                                    ACCESS TRACK - 15.70




                                                                                                                                         DRAIN TO BE RAISED ALONG
                                                                                                                                         SIDE OF ACCESS TRACK


                                                                                                                                                                                                                   9734




                                                                                                                                                                                                                               IL 15.10
                                                                                                                                                                            ACCESS TRACK - 16.75

                                                                                                                                                                                                                                             16.70 INVERT
                                                                                                                                                                                    IL 15.73 600 DIA.                                        17.00 TOB

                                                                                                                                             9000




                                                                                                                                                                                                                                               ACCESS TRACK - 17.22                         AREA TO BE STABILISED
                                                                                                                                                                                                                                                                                            AND BYPASSED TO
                                                                                                                                                                                                                                                                                            CLEAN WATER DRAIN
                                                                                                                                                                                                                                       NEW CULVERT
                                                                                                                                                                                                                                       10%AEP - 450mm DIA.
                                                                                                                                                                                                                                       1%AEP - 600mm DIA.




                                                                                                                                                                                                                           CLIENT                                              PROJECT
                                                                                                               0                    30                                                            COPYRIGHT C                                   NOOSA COUNCIL                                    NOOSA LANDFILL - RRA BASIN
                                                                                                                                                                                              TOPO GROUP PTY LTD
                                                                                                                                                                                                                           DRAWN                   DESIGNED      DATE          DRAWING TITLE

                               B       REVISION FOLLOWING CLIENT COMMENTS       KR        29/04/24                   SCALE 1:1500                                                     THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR      16/04/24                    CONCEPT DRAINAGE AND BASIN
                                                                                                                                                           ISSUED FOR USE             TRANSMITTED IN ANY FORM OR BY ANY
                               A       ORIGINAL ISSUE                           KR        16/04/24                                                                                    MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                                           RPEQ / SIGNATURE (IF REQUIRED)                                      CONCEPT DRAINAGE - SHEET 2 OF 2
                                                                                                                                    A3                                                THE WRITTEN CONSENT OF TOPO GROUP                                                        PROJECT No                  DRAWING No            REVISION
                            REVISION   DESCRIPTION                          APPROVED BY   DATE
                                                                                                             NORTH
                                                                                                                                                                                                    PTY LTD.                            CPESC - 5395, RPEQ - 15954                          24-0078-C                   D03           B

Page 51

DRAIN CALCULATIONS - 10% AEP

                                                                                                                                                                                                                                                                                                                       DEPTH
                   CATCH                                                TIME OF                                         LONG.                   SIDE SLOPE SIDE SLOPE                                                       MANNING
                                                                                                    FLOW - Q                            BASE                                                                                                  MAX PERM DESIGN VEL DEPTH OF                                             WITH        DRAIN TOP              OK /
DRAIN ID            AREA              ARI                 CARI           CONC            IARI                           SLOPE                        1               2                        LINING                         ROUGH
                                                                                                      (m3/s)                            WIDTH                                                                                                 VEL (m/s)                        (m/s)             FLOW (m)           F/BOARD        WIDTH (m)             NOT OK
                    (HA)                                                 (MINS)                                         (m/m)                     (1 in x)        (1 in x)                                                    COEFF
                                                                                                                                                                                                                                                                                                                          (m)

DW1 - START          0.3              10                    0.8            10            180            0.12             0.001            1          2               2                    Concrete                             0.015                   7                         0.54              0.17                   0.32         2.27                OK
DW1 - END             2               10                    0.8            10            180            0.80             0.001            1          2               2                    Concrete                             0.015                   7                         0.92              0.46                   0.61         3.42                OK
DW2                  2.8              10                    0.8            10            180            1.12             0.005            1          2               2                    Concrete                             0.015                   7                         1.81              0.36                   0.51         3.04                OK
DW3 - START          1.67             10                    0.8            10            180            0.67             0.005            1          2               2                    Concrete                             0.015                   7                         1.57              0.28                   0.43         2.70                OK
DW3 - END           3.67              10                    0.8            10            180            1.47             0.005            1          2               2                    Concrete                             0.015                   7                         1.95              0.41                   0.56         3.25                OK
DW4                  1.67             10                    0.8            10            180            0.67             0.005            1          2               2                    Concrete                             0.015                   7                         1.56              0.28                   0.43         2.70                OK
DW5 - START         0.63              10                    0.8            10            180            0.25             0.005            1          2               2                    Concrete                             0.015                   7                         1.17              0.16                   0.31         2.25                OK
DW5 - END            1.67             10                    0.8            10            180            0.67             0.005            1          2               2                    Concrete                             0.015                   7                         1.56              0.28                   0.43         2.70                OK

DRAIN CALCULATIONS - 1% AEP

                                                                                                                                                                                                                                                                                                                       DEPTH
                    CATCH                                               TIME OF                                         LONG.                   SIDE SLOPE SIDE SLOPE                                                       MANNING
                                                                                                    FLOW - Q                            BASE                                                                                                  MAX PERM DESIGN VEL DEPTH OF                                             WITH        DRAIN TOP              OK /
 DRAIN ID           AREA              ARI                   CARI         CONC            IARI             3
                                                                                                                        SLOPE                        1               2                        LINING                         ROUGH
                                                                                                       (m /s)                           WIDTH                                                                                                 VEL (m/s)                        (m/s)             FLOW (m)           F/BOARD        WIDTH (m)             NOT OK
                     (HA)                                                (MINS)                                         (m/m)                     (1 in x)        (1 in x)                                                    COEFF
                                                                                                                                                                                                                                                                                                                          (m)

 DW1 - START          0.3             100                   0.96           10            258            0.21             0.001            2          2               2                    Concrete                             0.015                   7                        0.56               0.16                   0.31         3.24               OK
 DW1 - END             2              100                   0.96           10            258            1.38             0.001            2          2               2                    Concrete                             0.015                   7                         1.01              0.46                   0.61         4.46               OK
 DW2                  2.8             100                   0.96           10            258            1.93             0.005            2          2               2                    Concrete                             0.015                   7                         1.97              0.36                   0.51         4.04               OK
 DW3 - START         1.67             100                   0.96           10            258            1.15             0.005            2          2               2                    Concrete                             0.015                   7                         1.68              0.27                   0.42         3.68               OK
 DW3 - END           3.67             100                   0.96           10            258            2.52             0.005            2          2               2                    Concrete                             0.015                   7                        2.14               0.42                   0.57         4.27               OK
 DW4                 1.67             100                   0.96           10            258            1.15             0.005            2          2               2                    Concrete                             0.015                   7                         1.68              0.27                   0.42         3.68               OK
 DW5 - START         0.63             100                   0.96           10            258            0.43             0.005            2          2               2                    Concrete                             0.015                   7                         1.22              0.15                   0.30         3.21               OK
 DW5 - END           1.67             100                   0.96           10            258            1.15             0.005            2          2               2                    Concrete                             0.015                   7                         1.68              0.27                   0.42         3.68               OK




                                                                                          CONCRETE
                                                                                          CONCRETE     LINED
                                                                                                   LINED                                                                                                                                                                             CONCRETE LINED




                                                             1 :2                       1:2                                                                                                                           1:2
                                                                                                                                                                                                                                                                               1:2
                                           0.5m




                                                                                                                                                                                                       0.5m
                                      VARIES                                                                                                                                                      VARIES

                                                                          1m
                                                                          0.6m                                                                                                                                                          m 2m           m



                                                   DIVERSION
                                                   10%       DRAIN
                                                       AEP DRAIN   - TYPICAL
                                                                 TYPICAL     DETAIL
                                                                          DETAIL                                                                                                                               DIVERSION DRAIN
                                                                                                                                                                                                                     1% AEP    - TYPICAL
                                                                                                                                                                                                                            DRAIN        DETAIL
                                                                                                                                                                                                                                   TYPICAL DETAIL
                                                                    DRAIN DEPTHS:                                                                                                                                                    DRAIN DEPTHS:

                                                                    DW1 START - 0.32m                                                                                                                                                DW1 START - 0.31m
                                                                    DW1 END - 0.61m                                                                                                                                                  DW1 END - 0.61m
                                                                    DW2 - 0.51m                                                                                                                                                      DW2 - 0.51m
                                                                    DW3 START - 0.43m                                                                                                                                                DW3 START - 0.42m
                                                                    DW3 END - 0.56m                                                                                                                                                  DW3 END - 0.57m
                                                                    DW4 - 0.43m                                                                                                                                                      DW4 - 0.42m
                                                                    DW5 START - 0.31m                                                                                                                                                DW5 START - 0.30m
                                                                    DW5 END - 0.43m                                                                                                                                                  DW5 END - 0.42m


                                                                                                                                                                                                                                              CLIENT                                                      PROJECT
                                                                                                                                                                                                                    COPYRIGHT C                                    NOOSA COUNCIL                                             NOOSA LANDFILL - RRA BASIN
                                                                                                                                                                                                                TOPO GROUP PTY LTD
                                                                                                                                                                                                                                              DRAWN                   DESIGNED            DATE            DRAWING TITLE

                                  B        REVISION FOLLOWING CLIENT COMMENTS                                      KR        29/04/24
                                                                                                                                                                             ISSUED FOR USE
                                                                                                                                                                                                         THIS DOCUMENT MAY NOT BE COPIED OR            KR                       KR           16/04/24               CONCEPT DRAINAGE AND BASIN
                                                                                                                                                                                                         TRANSMITTED IN ANY FORM OR BY ANY
                                  A        ORIGINAL ISSUE                                                          KR        16/04/24                                                                    MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                                                              RPEQ / SIGNATURE (IF REQUIRED)                                 DRAINAGE CALCULATIONS AND TYPICAL SECTIONS
                                                                                                                                                             A3                                          THE WRITTEN CONSENT OF TOPO GROUP                                                                PROJECT No                  DRAWING No                 REVISION
                               REVISION     DESCRIPTION                                                        APPROVED BY       DATE                                                                                  PTY LTD.                            CPESC - 5395, RPEQ - 15954                                  24-0078-C                   D04                B

Page 52

R3341: NOOSA LANDFILL: RRA CONCEPT HES BASIN AND DRAINAGE DESIGN REPORT




APPENDIX B2 – BASIN CALCULATIONS




Environment. Engineering. Education.                                      PAGE 4

Page 53

R3341: NOOSA LANDFILL: RRA CONCEPT HES BASIN AND DRAINAGE DESIGN REPORT



1 YEAR ARI 24 HOUR TYPE A SEDIMENT BASIN


                                                                                                                                                                                          APPROX. DIMENSIONS



                                                                                                                                           NUMBER                                                                     APPROX.
                                                                                                                                                                      APPROX.
                           SETTLING                                                                                    DECANT    DECANT       OF                                 APPROX.       APPROX.                 TOTAL
              CATCH                    DESIGN                   MINIMUM   MINIMUM            ACTUAL                                                   EMPTY    FULL    LENGTH                              SETTLING
  BASIN                     DEPTH                IX yr, 24 hr                       GOVERN            DFW    MANUAL    NUMBER     HOLE     DECANTS                               WIDTH AT      DEPTH AT               VOLUME
               AREA                    EVENT                       Vs        As                VS                                                     SCOUR   SCOUR       AT                               VOLUME
  ID                           DS               (mm/hr)                             FACTOR            (m)    DFW (m)     OF     DIAMETER   REQUIRED                              SPILLWAY      SPILLWAY                   AT
               (HA)                     (ARI)                     (m3)      (m2)              (m3)                                                    CHECK   CHECK   SPILLWAY                               (m3)
                              (m)                                                                                       HOLES     (mm)      FOR QA                                  (m)           (m)                 SPILLWAY
                                                                                                                                                                         (m)
                                                                                                                                           SELECTED                                                                      (m3)


  SW2          7.83           1.00       1         5.68          2891       846     VOLUME    2891    0.20    0.40      200        16        6.1       OK      OK       99.1       33.0           1.6          2891     4613




Environment. Engineering. Education.                                                                                                                                                                                  PAGE 5

Page 54

R3341: NOOSA LANDFILL: RRA CONCEPT HES BASIN AND DRAINAGE DESIGN REPORT




APPENDIX C2 – CONCEPT BASIN DESIGN




Environment. Engineering. Education.

                                                                          PAGE 6

Page 55

                                                                                                                                            B
                                                                                                                                            C02
                                                                                                                                                                             TOP OF BUND
                                                                 1 IN 3 BATTERS TYPICAL

                                                                                                                                                                                                                                                                                              12.0
                                                                                                                                                                                   12.0




                                                                                                                                                                                                     11
                                                                                                      12.0
                                                                                                                                                                                                                                                                                             13.0




                                                                                                                                                                                                       .5
                                                                                                                                                                                                                                                              12.0                                                                                                     12.5
                                                                                                     13.0                                                                         13.0
                                                                                                                                                                                                                                                      0
                                                                                                                                                                                                                                                  13..5
                                                                                                                                                                                                                                                RL1




                                                                                                                                                                                                               SW
                                                                                                                                                                                                                                                        0
                                                                                                                                                                                                                                                                      3.00



                                     12.0
                                                           40                                                                                                                                                                                                 RL1
                                                      13.




                                                                                                                                                                                                                    SW
                                                                                                                   13.0                                                                          13.0
                                                   RL




                                                                                                                                                                                                                                                                                                                    13.
                                                                                                                                                                                                        11.5
                                          .8   0                                          12.0                                                                       12.0
                                      RL12




                                                                                                                                                                                                                                                                                                                        0
                                                                                                                                                                                                                         SW




                                                                                                                                                                                                                                                                                                                                                                     13.
       A




                                                                                                                                                                                                                                                                                                                                                                      0
       C02                                                                                                                                                                                                                                  E                                                   E

                                    9,43                                                           11.0                                                                      11.0                                                                                                                                                                                                               13.5




                                                                                                                                                                                                                                 SW
                                    9,4333.53 mm                                                                                                                                                                     FOREBAY                                                                                                             D
                                                                                                                                                                                                                                                                                                                                                                UPSTREAM DRAINAGE TO TIE
                                          .53 m                                                                                                                                                                WEIR AT RL13.00.                                                                                                          C02

                                                m                                                                                                                                                                                                                                                                                                               INTO CONCRETE INLET DRAIN.




                                                                                                                                                                                                                                            SW
                                                                  mm
                                                                  mm
                                                                                                                                                                                                                                                                               FOREBAY




                                                                                                                                                                                                                                                12.0
                                                                                                                                                                                                                                                                                      RL11.50




                                                                                                                                                                                                                                                                        12.0
DECANT OUTLET SYSTEM




                                                                                                                                                                                                                                                                                                                                                    .0
                                                        12,828.11
                                                        12,828.11
                                                                                                                                       BASIN




                                                                                                                                                                                                                                                                                                                                                    14
           USIL 11.75




                                                                                                                                                                                                                                                       13.0
                                                                                                                                                                                                               C                                                                                                                                     RL
                                                                                                                                  RL11.00                                                                                                                                                                           20                                   13.
           DSIL 11.56                                                                                                                                                                                                                                                                                         13.




                                                                                                                                                                                                                                                               13.0
                                                                                                                                                                                                           C02                                                                                                                                                 40
                                                                                                                   SETTLING ZONE RL11.80-RL12.80 = 2,950m3                                                                                                                                              RL




                                                                                                                                                                                                                                                                                                                              14.0
                                                                                                                  FREE WATER ZONE RL11.40-RL11.80 = 980m3
                                                         11.0
                                                         12.0




                                                                                                                                                                                                                                     13.0
                                                                                                                 SEDIMENT STORAGE RL11.00-RL11.40 = 860m3                                                                                                                                                                                                         10m LONG CONCRETE




                                                                                                                                                                                                                                                                                                         12.512.0
                                                                                                                                                                                                                                                                                                13.0
                                                                                                                                                                                                                                                                                                                                                                  INLET DRAIN.




                                                                                                                                                                                    11.5
                 11.5




             SPILLWAY AT
                  RL12.80

                                                                                                                        11.0                                                                        11.0                                                                                                                                                       CONCRETE DOSING PAD
                                                        80                                                                                                                                                                                                                       13.0
                                                     12.
                                                   RL
                                                                                                          12.0                                                                       12.0
                                                   RL1
                                                      3.40                                                                                                                                                                                                    12
                                                                                                                                                                                                                                                               RL.5
                                                                                                                                                                                             13.0                                                                 13.                         13.0
                                    12.0




                                                                                                                 13.0                                                                                                                                                  00
                                                                                                                                                                                                                                                RL13.50

                                                                                                       13.0                                                                         13.0
                                                                                                                                                                                                                                                                                               13.0




                                                                                                                                                         11
                                                                                                    12.0                                                                          12.0




                                                                                                                                                                                                                                                                                                                                               .5
                                                                                                                                                         .5




                                                                                                                                                                                                                                                                                                                                           13
                                                                                          1 IN 3 BATTERS TYPICAL
                                                                                                                                                                                   TOP OF BUND
              11.5




                                                                                                                                                                                                                              12.0




                                                                                                                                                                                                                                                                               12.0
11.5




                                                                                                                                                                                                                                                                                                                                                .5
                                                                                                                                                                                                                                                                                                                                               13
                                                                                                                                                         BASIN LAYOUT PLAN                                                                                                                             LEGEND:
                                                                                                                                                0        5     10      15    20            25m
                                                                                                                                                                                                                                                                                                                            13.0                EXISTING CONTOUR (0.25m INTERVAL)
                                                                                                                                                               SCALE 1:500
                                                                                                                                                                                                                                                                                                                            12.0                PROPOSED CONTOURS (0.5m INTERVAL)

                                                                                                                                                                                                                                                                                                                                                PROPOSED LEVEL SPREADER

                                                                                                                                                                                                                                                                                                                                                PROPOSED STORMWATER DRAINAGE

                                                                                                                                                                                                                                                                                                                                                PROPOSED MANHOLE WITH FLOATING DECANT

                                                                                                                                                                                                                                                                                                                                                PROPOSED ROCK PROTECTION

                                                                                                                                                                                                                              EARTHWORKS SUMMARY
                                                                                                                                                                                                                                                                                                                                                PROPOSED CONCRETE
                                                                                                                                                                                                                              COMPARISON TO PROVIDED SURVEY




                                                                                                                                                                                                                                                                                                                                                                                                                  Monday, 29 April 2024 12:13:31 PM
                                                                                                                                                                                                                              CUT - 1,740m3
                                                                                                                                                                                                                              FILL - 4,510m3

                                                                                                                                    SCALE                                                                                                                                      CLIENT                                                                PROJECT
                                                                                                                                                                                                                                    COPYRIGHT C                                                     NOOSA COUNCIL                                              NOOSA LANDFILL SEDIMENT BASIN
                                                                                                                                                    AS SHOWN                                                                    TOPO GROUP PTY LTD
                                                                                                                                                                                                                                                                               DRAWN                 DESIGNED                 DATE                   DRAWING TITLE

                                                                                                                                                                                    CONCEPT                                                                                             MD                    KR                     25/04/24                              BASIN LAYOUT PLAN
                           A     PRELIMINARY ISSUE                                                        KR             25/04/24                                                                                                                                              RPEQ / SIGNATURE (IF REQUIRED)


                                                                                                                                             NOR
                                                                                                                                                    TH         A3                                                                                                                                                                                    PROJECT No                  DRAWING No            REVISION
                        REVISION DESCRIPTION                                                       APPROVED BY            DATE                                                                                                                                                                                                                                    P001546                     C01          A

Page 56

                                                                                                                                                                     DECANT MANHOLE.
                                                                                  HEADWALL
                                                                                                             SPILLWAY RL12.80                       RL12.80
                                                                                       IL11.56                                     1 IN
                                                                                                                                          3
                                                                                                                                                                         BASIN RL11.00

                                                                                                                 1 x DN375 RCP
                              EXISTING SURFACE                                                              GRADE 1%, LENGTH 10.1m
                                                                                                                              IL 11.66
                                                                                                                                                                                                PROPOSED SURFACE
                                                                                                                       (US MH IL11.75)

                                                                                                           SPILLWAY SECTION                   A
                                                                                                                        SCALE 1:200           C01




                              BUND RL13.40                                                                                                                                                                                        BUND RL13.40

                   3
            1 IN                                     1 IN                                                                                                                                                      3                                                     1 IN
                                                            3                                                                                                                                           1 IN                                                                3
                                                                                                                    BASIN RL11.0


                                                                                                                                                                                                                                                           EXISTING SURFACE

                                                 PROPOSED SURFACE                                             BASIN SECTION                   B
                                                                                                                       SCALE 1:200            C01




                   EXISTING SURFACE                             FOREBAY WEIR                                                                                                                                                      RL13.40
                                                                   RL13.00                                                                                                    RL13.20                2.0%
                                                                                                                      FOREBAY
                                                                                        1 IN                           RL11.50                                       3
                                                    1 IN
                                                           3          3.0m                     3                                                              1 IN                                   10.0m
                             BASIN RL11.00
                                                                                                                                                                                                  INLET DRAIN



        PROPOSED SURFACE
                                                                                                           FOREBAY SECTION                    C
                                                                                                                       SCALE 1:200            C01




                                                                                                                      2.0m 1.0m 2.0m
                                                                             PROPOSED SURFACE

                                                                                                                     1 IN                 2
                                                                                                                            2      1 IN




                                                                                   EXISTING SURFACE



                                                                                                       INLET DRAIN SECTION                    D
                                                                                                                       SCALE 1:200            C01




                                                                                                                                                                                                                                                                                          0       2    4            6     8     10m




                                                                                                                                                                                                                                                                                                                                         Monday, April 29, 2024 12:48:28
                                                                                                                                                                                                                                                                                                       SCALE 1:200
                                                                                                   SCALE                                                                                                                 CLIENT                                                 PROJECT
                                                                                                                                                                                             COPYRIGHT C                                    NOOSA COUNCIL                                 NOOSA LANDFILL SEDIMENT BASIN
                                                                                                            AS SHOWN                                                                     TOPO GROUP PTY LTD
                                                                                                                                                                                                                         DRAWN                DESIGNED        DATE              DRAWING TITLE

                                                                                                                                                      CONCEPT
                                                                                                                                                                                 THIS DOCUMENT MAY NOT BE COPIED OR               MD                  KR        25/04/24                          BASIN SECTIONS
                                                                                                                                                                                 TRANSMITTED IN ANY FORM OR BY ANY
   A     PRELIMINARY ISSUE                                              KR         25/04/24                                                                                      MEANS IN PART OR IN WHOLE WITHOUT THE   RPEQ / SIGNATURE (IF REQUIRED)

                                                                                                                            A3                                                   WRITTEN CONSENT OF TOPO GROUP PTY LTD
                                                                                                                                                                                                                     .                                                          PROJECT No             DRAWING No             REVISION
REVISION DESCRIPTION                                                APPROVED BY    DATE                                                                                                                                                                                                      P001546                C02           A

Page 57

                                                                                                                                11
                                                                                                                                                                 12.0                                                                                       12.5




                                                                                                                                .5
                                                                                                                                                          13.0




                                                                                                                                11.5




                                                                                                                                                                                                                                                          13.
                                                                                                                                                                                                                                                             0
                                                                                                                                                                                                                                                                                  13.5




                                                            BASIN
                                                            RL11.00
                                                                                                                                                                               FOREBAY
                                                                                                                                                                                      RL11.50




                                                                                                                                                  13.0




                                                                                                                                                                                                13.0
                                                                                                                   11.5
          11.5




                                                                                                                                                                                                        12.5
                                                                                                                                                                                 13.0


                                                                                                                                                                 12.5




                                                                                        11




                                                                                                                                                                                                                                    .5
                                                                                           .5




                                                                                                                                                                                                                                    13
       11.5




                                                                                                                                           12.0




                                                                                                                                                                               12.0
11.5




                                                                                                                                                                                                                   13.0




                                                                                                                                                                                                                                     .5
                                                                                                                                                                                                                                    13
                                                                                     BASIN LINING LAYOUT PLAN
                                                                                0        5      10      15    20          25m

                                                                                                SCALE 1:500

                                                                                                                                                                                                                LEGEND:
                                                                                                                                                                                                                             13.0            EXISTING CONTOUR (0.25m INTERVAL)

                                                                                                                                                                                                                                             PROPOSED TOPSOIL AND TURF


                                                                                                                                                                                                                                             PROPOSED ACCESS PAVEMENT

                                                                                                                                                         LININGS QUANTITIES
                                                                                                                                                                                                                                             PROPOSED CONCRETE WORKS
                                                                                                                                                         (PLAN AREA)
                                                                                                                                                         BATTER TURF AREA = 1,600m²
                                                                                                                                                         ACCESS PAVEMENT AREA = 1,020m²                                                      PROPOSED ROCK PROTECTION
                                                                                                                                                         CONCRETE AREA = 4,905m²




                                                                                                                                                                                                                                                                                                    Monday, April 29, 2024 12:48:30
                                                                                                                                                         ROCK PROTECTION AREA= 200m²

                                                                       SCALE                                                                                                   CLIENT                                                     PROJECT
                                                                                                                                                 COPYRIGHT C                                      NOOSA COUNCIL                                     NOOSA LANDFILL SEDIMENT BASIN
                                                                                     AS SHOWN                                                TOPO GROUP PTY LTD
                                                                                                                                                                               DRAWN                DESIGNED              DATE            DRAWING TITLE

                                                                                                                   CONCEPT
                                                                                                                                       THIS DOCUMENT MAY NOT BE COPIED OR               MD                  KR              25/04/24                       BASIN LINING LAYOUT PLAN
                                                                                                                                       TRANSMITTED IN ANY FORM OR BY ANY
                    A     PRELIMINARY ISSUE       KR        25/04/24                                                                   MEANS IN PART OR IN WHOLE WITHOUT THE   RPEQ / SIGNATURE (IF REQUIRED)


                                                                               NOR
                                                                                  TH            A3                                     WRITTEN CONSENT OF TOPO GROUP PTY LTD
                                                                                                                                                                           .                                                              PROJECT No               DRAWING No            REVISION
                 REVISION DESCRIPTION         APPROVED BY   DATE                                                                                                                                                                                       P001546                  C03          A

Page 58

R5304: NOOSA RESOURCE RECOVERY CENTRE - STORMWATER MANAGEMENT PLAN




APPENDIX D
IPWEAQ BIORETENTION SYSTEM STANDARD DRAWINGS




Environment. Engineering. Education.                                 PAGE D

Page 59

                                                  I:\User_Group\Design_Services\# Projects\IPWEA Standard Drawings\IPWEAQ Standard Drawings\IPWEA logo col no text_trans.gif

                                           I:\User_Group\Design_Services\# Projects\IPWEAQ Standard Drawings\IPWEAQ Standard Drawings\IPWEA logo col no text_trans.gif




23 | DRAINAGE AND WATER QUALITY DRAWINGS

Page 60

20 | DRAINAGE AND WATER QUALITY DRAWINGS


[OCR of page images]
 

Extended detention depth. 0-300.
Typically 300. Refer project drawings 7

ye . r Filter cloth fixed to
Field inlet Type 1 without perimeter of pit.

concrete apron as per IPWEA Refer note 10
Standard Drawings DS—050

   
 
   
   
 
 

Provide locking function or
Vegetated batter. secure cap with screws
Slope varies with

design. Refer note 8

Vegetated surface
Refer note 1

Mulch layer — 50 — 70 Refer note 1

  
 
 

Extend approx 150 above
biorentention system surface

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

i Bioretention finished surface level.
Underarain Refer project drawings ond notes 1 & 3 NX
/ Refer note 7 ae ~— filter media 500 - 1000 (min 400 or ——> V
Impermeable liner to 300 be 100 where trees specified min 700) Ko
extend 500 up batter 4 Refer note 2 a } Underdrain cleanout and
under topsoil and = Fansition foyer. Depth varies with ~ a connector cleanout at head of
i < ign. ree
pinned to batter gE Hsia eer gpth varies with Nea pipes. Refer note 9
. design. 135° bend
wg Ft if r Refer note 4
Outlet Pioe 254 Underdrain noe \
sealed into pit. Impermeable liner. 135° bend
Screw cap for Refer note 5 Refer note 6
draining/maintenance to remain

 

. . . “ Mass concrete support
in place during normal operation.

NOTES:

1. Bioretention system surface. Surface level is top of filter media. Surface to be mulched and planted as per project drawings and the ‘Bioretention Technical Design Guidelines’
(Water by Design).

2. Filter media specification shall be in accordance with the ‘Adoption guidelines for Stormwater Biofiltration Systems (CRC for water sensitive cities) and the Bioretention Technical
Design Guidelines (Water by Design). Bioretention hydraulic conductivity shall be in accordance with Practice Note 1: in situ Measurement of Hydraulic Conductivity’ (FAWB). The
number of samples to be tested shall be in accordance with the ‘Construction and Establishment Guidelines — Swales, Bioretention Systems and Wetlands’ (Water by Design).

3. Construction tolerances shall be in accordance with the ’Construction and Establishment Guidelines —Swales, Bioretention Systems and Wetlands’ (Water by Design)

4. Transition layer and drainage layer depths vary with design. Depths and specification to be in accordance with project drawings and the ‘Bioretention Technical Design Guidelines’
(Water by Design)

5. Underdrain. Slotted rigid pipe laid flat. Refer to project drawings for diameter and pipe invert. Pipe should not be installed with a filter sock surrounding pipe. Underdrain pipes
shall be sealed into pits using grout or other approved watertight seal.

6. Impermeable liner. Compacted clay or synthetic liner with permeability of no greater than 1 x 10-%m/s. impermeable liner to be sealed around all protrusions. Synthetic liners to
be installed and sealed in accordance with manufacturers requirements. Impermeable liner as per project drawings ond 'Bioretention Technical Design Guidelines’ (Water by Design)

7. Underdrain outlet riser establishes max saturated zone water level. Underdrain outlet riser as per project drawings and ‘Bioretention Technical Design Guidelines’ (Water by Design)
8. Vegetated batter. Slope and planting to be in accordance with project drawings and ’Bioretention Technical Design Guidelines’ (Water by Design).

9. Inspection/cleanout point. Vertical solid pipe section attached to the end of each underdrain in accordance with project drawings and the ‘Bioretention Technical Design
Guidelines’ (Water by Design)

10. Filter cloth to be fixed to perimeter of pit to avoid runnelling of water between pit and soil interface. Begin filter cloth 100 above surface. Extend to 100 below surface. Continue
300 horizontally into filter media.

11. For general design and construction notes refer to DS-078

12. All dimensions in millimetres unless otherwise noted.
These drawings have been developed in consultation between the participating Councils.
BEFORE USE, the user shall confirm that the drawing has been adopted by the appropriate Council.

INSTITUTE OF PUBLIC WORKS ENGINEERING AUSTRALASIA BIORETENTION DRAINAGE PROFILE - TYPE 1
STANDARD DRAWINGS SATURATED ZONE — UNCONSTRAINED

 

 

 

 

DS-070

 

 

ap]
PTT TTT

11775 | ORIGINAL ISSUE
TAE, February, 2076 _REVSIONS, inal Tssue

 

 

 

 

 

 

 

 

 

 

 

 

20 | DRAINAGE AND WATER QUALITY DRAWINGS

Used in these records

About this file

File size
19.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 8 - Interim Stormwater Management Plan - TOPO.pdf · 19.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.